John Stem 7 th Annual Summit on VR PEQA Louisville, Kentucky.

Slides:



Advertisements
Similar presentations
Online System for Compiling Member Comments July 2010 Near East Regional Workshop.
Advertisements

Updated Training for DPAS II for Administrators
On-the-job Evaluation of Principals Jacquelyn O. Wilson, Ed.D. Delaware SAELP Director Wallace Foundation National Conference October 25-28, 2006.
(Individuals with Disabilities Education Improvement Act) and
4/30/20151 Quality Assurance Overview. 4/30/20152 Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented, taking into consideration.
5/2010 Focused Monitoring Stakeholders May /2010 Purpose: Massachusetts Monitoring System  Monitor and evaluate program compliance with federal.
External Quality Review Quarterly Meeting Tuesday, September 26, p.m. – 3:30 p.m.
July 2013 IFSP and Practice Manual Revisions April 29, 2013 May 3, 2013 Infant & Toddler Connection of Virginia Practice Manual Infant & Toddler Connection.
7/16/20151 Quality Assurance Overview. 7/16/20152 Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented  included CMS Quality.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Monitoring Accommodations in South Dakota Linda Turner Special Education Programs.
IA-DMM Measures and Results for Year 1. Cohort 1 as of 6/23.
REGIONAL PEER REVIEW PANELS (PRP) August Peer Review Panel: Background  As a requirement of the ESEA waiver, ODE must establish a process to ensure.
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
AcademyHealth Public Health Systems Research Interest Group Meeting Public Health Data Panel.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
District Planning in ePlan July Consolidated Planning & Monitoring Eve Carney Executive Director Renee Palakovic Director of Planning
Missouri Vocational Rehabilitation Quality Assurance Continuous Quality Improvement.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Central Columbia’s Comprehensive Plan. 2 Comprehensive Planning Pass Through Required Towns Pass By Off/On Ramps Comprehensive Planning Components Highway.
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
The Grenada Experience: Establishment of the Grenada Drug Information Network (GRENDIN); Successes and Challenges; 4 November 2011.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Getting Started in the Quality Assurance Program Holly Langer-Evans Michael Cagle Anne Tuccillo
On-line briefing for Program Directors and Staff 1.
Implementing School Plans in ePlan
© 2014, Florida Department of Education. All Rights Reserved. Bureau of Federal Educational Programs Updates _________________________________.
Quality Assurance and Quality Improvement.  Standard Pathway - Required for all institutions granted initial accreditation, institutions in significant.
Electronic Case Reviews and Consumer Surveys September 16, 2013 Soon to be known as: Opportunities for Ohioans with Disabilities Presented by: Janet Cool,
SACS Compliance Certification Orientation Meeting June 23, 2008.
On Site Review Process Office of Field Services.
Improvement Planning Mischele McManus Infant/Toddler and Family Services Office of Early Childhood Education and Family Services July 20, 2007
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Data Report July Collect and analyze RtI data Determine effectiveness of RtI in South Dakota in Guide.
ESEA Consolidated Monitoring Office of Federal Programs December 10, 2013.
New England Vocational Rehabilitation Quality Assurance System
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Reviewer Training 5/18/2012. Welcome & Introductions Co-Chairs: NHDOE Representative:Bob McLaughlin.
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
School Improvement Activities Accreditation (AdvancED) Process Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator, School Improvement.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Lead Agency Viability Assessment Consistent with OPPAGA Report 04-65, DCF contracted with FMHI to assist in the design and implementation of a centralized.
Accreditation Overview Winter 2016 Mallory Newell, Accreditation Liaison Office.
Nevada Department of Education Office of Educational Opportunity Nevada Comprehensive Curriculum Audit Tool for Schools NCCAT-S August
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
SCHOOL-WIDE POSITIVE BEHAVIORAL INTERVENTIONS AND SUPPORT: ADDRESSING THE BEHAVIOR OF ALL STUDENTS Benchmarks of Quality KENTUCKY CENTER FOR INSTRUCTIONAL.
6/18/2016 DES / AzEIP 2011 Cycle Two Self Report Overview & Training Cycle Two Self Report Overview & Training.
Governor Support Service Training Governor Workshop 31 st March 2016 As a service we have a responsibility to enable all governors to access appropriate,
What’s New for Transition to Special Education Services? Paula E. Goff, Part C Coordinator May 23, 2013.
School Improvement Updates Accreditation (AdvancED) Process ASSIST Portfolio for Schools May 2016 Office of Service Quality Veda Hudge, Director Donna.
PILOT SCHOOL PRINCIPAL EVALUATION
CCP: Monitoring and Evaluation
Advancing Student and Educator Growth through Peer Feedback
Overview of the FEPAC Accreditation Process
Training Appendix for Adult Protective Services and Employment Supports June 2018.
Parent and Family Partnership Surveys
Parent and Family Partnership Surveys
Foothill College Accreditation Self-Study Update
Online System for Compiling Member Comments
Proposed RISC 2014 Deliverables, Activities, and Calendar
Continuous Improvement/eProve Regional Trainings
SEQUOIA CONSULTING GROUP
Hands-On: FSA Assessments For Foreign Schools
TEXAS DSHS HIV Care services group
New Special Education Teacher Webinar Series
Budgeting Conversation
Presentation transcript:

John Stem 7 th Annual Summit on VR PEQA Louisville, Kentucky

 DORS uses a 2-pronged case review system: ◦ Unit Case Reviews 1.Review team composition 2.Various views on policy and how to respond to specific questions were suspected to be compromising inter-rater reliability between reviews. 3.“Technical difficulties” ◦ Delegated Authority Reviews 1.Not truly “random” 2.Need to be “perfect” 3.No formal way to document which counselors needed to be reviewed each month. 4.Inefficient process for submitting, processing, and summarizing reports.

 May 2013: Quality Assurance Core Development Team begins a 12-month journey guided by consultants from the George Washington University TACE.  Summer 2013: Initial Activities ◦ Identify concerns about current case review process ◦ In the context of Quality Assurance:  Define purpose of the Unit Review  Define purpose of the Delegated Authority Review ◦ Review the sampling of case review instruments used in other states collected via the Summit list-serve. ◦ Compile a list of potential questions upon review of each chapter in the DORS policy and procedures manual

 The DORS Quality Assurance system shall be designed to fulfill 5 purposes: 1. Evaluate measurable and achievable standards that are accepted as quality indicators of excellence in rehabilitation practice to ensure service delivery reflects these quality standards. 2. Monitor policy compliance and ensure statewide consistency with statutory requirements of federal regulation and state policy. 3. Ensure consumers receive information necessary to make an informed choice regarding an employment goal and services required to reach their goal, consistent with their strengths, resources, priorities, concerns, abilities, and interests. 4. Identify statewide, regional, district, and individual training needs and policy issues. 5. Identify exemplary rehabilitation practices and outcomes.

Regarding Unit Case Review: 1.Reflects the supervisor 2.Inter-rater reliability must be assured 3.Instrument needs to measure compliance and quality. 4.Instrument needs to be flexible enough to respond to changes in policy.

◦ Regarding Supervisory Delegated Authority Review: 1.Reflects the counselor 2.Could not practically be both “random” and “prior.” 3.Accuracy of responses needs to be assessed 4.Questions should be a relevant sampling of the questions found in the more comprehensive record review instrument used during unit reviews. 5.A more efficient means of cataloguing responses would expedite summary reports.

 October 2013: ◦ Replicate the current “On-Going Supervisor Record Review Instrument” using an on-line survey tool ◦ Build new AWARE case search and financial search layouts and a new survey tool for Regional Directors to use when selecting plans and authorizations to review and sending review requests to supervisors. ◦ Build Matrix reports to use for monthly and quarterly reporting on reviews completed.  November 2013: Train regional directors and supervisors on new delegated authority review instrument protocols.  January 2014: Implement new delegated authority review procedures beginning with reviews of plans and authorizations initiated in December 2013.

 December 2013: Compile first draft of new QA Review Instrument in an Excel document.  January 2014: Select three cases for the entire QA Core Development Team to review using the new instrument, and “questioning the questions” ensues.  February 2014: Next draft; next trial run  March 2014: Next draft, next trial run  April 2014: Finalize draft for review by Executive Staff and State Rehabilitation Council  May 2014: Introduce new record review instrument to supervisors and address questions.  June 2014: Pilot use of instrument using SurveyGizmo with 8- person, core team and 12 cases for one district review  July 2014: Begin monthly review cycle--one case per caseload; two reviewers per case.

Made Possible by WiFi... and an edit survey response “safety net.”

◦ “Show When” Logic  Pages  Options ◦ All questions required, when displayed.

◦ Additional Instructional Text ◦ Validation ◦ Hyperlinks

◦ “Thank-You” Page: ◦ Actions:

 During the initial review: ◦ “Back” and “Next” buttons ◦ Progress Bar ◦ “Save and Continue Later” feature ◦ Require comment when reviewer indicates “Partially Present” or “Not Present” ◦ completed review to reviewer  During consensus building: 1.Export comparison report to Excel 2.Copy n paste into Excel comparison template 3.Make required edits in one review in Survey Gizmo 4.“Delete” the second review for the case in Survey Gizmo

 QA Unit Review Team response congruence prior to consensus building: ◦ June (pilot): 12 cases reviewed, 2,550 questions answered, 74.74% congruence ◦ July: 10 cases reviewed, 2,158 questions answered, 81.28% congruence ◦ August: 11 cases reviewed, 2,410 questions answered, 80.66% congruence

 Immediate Feedback Provided to District Staff at end of 2nd day ◦ Run summary report for each district ◦ Exclude N/A options percentage calculations ◦ Export summary report to Excel for quick review ◦ Identify highlights  Summary Report Provided to Executive Staff within seven days  Follow-Up: Regional Director prepares a Quality Control Plan within 30 days

 September 2014: ◦ Train all 8 core review team members on how to run reports for consensus building during the unit review. ◦ Redesign the Delegated Authority Review Instrument ◦ Provide an end-of-year report to Executive Staff identifying any trends noticed during unit reviews.

Need help selecting an on-line survey tool to use? Check out: survey-tools

John Stem Staff Specialist, Program Evaluation Division of Rehabilitation Services 2301 Argonne Drive Baltimore, MD