RMDCN Workshop, 18-20 Jan 99 ECMWF/WZ-1 RMDCN Contract & Accession Agreements Walter Zwieflhofer Head of Computer Division ECMWF.

Slides:



Advertisements
Similar presentations
Strengthening statistical capacity in support of progress towards the Internationally Agreed Development Goals in countries of South Asia United Nations.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
RMDCN Technical Solution
Background on the RMDCN
RMDCN status & plan,February Agenda  RMDCN Configuration  RMDCN Next Generation  Migration.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
1 Conference Call December 7 th h 30 Agenda 1.Concerns on wording and inclusion of glossary of terms; 2.Issues: 3.Scope of RFP equipment required;
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
MAIN PREMISES TO THE FINANCIAL SECURITY RULES USED BY THE GAS TRANSMISSION OPERATOR GAZ-SYSTEM S.A. IN TRANSMISSION CONTRACTS AND NETWORK CONNECTION AGREEMENTS.
The Corporation for Education Network Initiatives in California CENIC 5757 Plaza Dr. Ste 205 Cypress, CA 90630(714)
Past, present and future of the RMDCN – 02/11/11© ECMWFSlide 1 Past, present and future of the RMDCN Rémy Giraud ECMWF Head of Network and Security Section.
Self-Governance Negotiations What to expect at the negotiation table 1.
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
By: Alena Newcomb.  What is a WI-FI hotspot?  Wireless Local Area Network location that provides broadband Internet access.  Use of laptops, PDA, or.
ASPEC Internal Auditor Training Version
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
European payment order Regulation (EC) No 1896/2006 of the European Parliament and of the Council of 12 December 2006 creating a European order for payment.
SERVICE LEVEL AGREEMENTS Bob Goldberg 312/
Chapter 8.  Network Management  Organization Management  Risk Assessment & Management  Service Management  Performance Management  Problem Management.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
NATIONAL WORKSHOP ON THE BENEFITS OF THE TIR CONVENTION TO FACILITATE GROWTH AND PROSPERITY IN THE ARAB WORLD WITHIN THE FRAMEWORK OF THE IDB-AULT-IRU.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand István Bozsóki Head of Division BDT/IEE/SBD 1.
Collective Bargaining Retreat for Management Discussion of the Impact of Measuring Teacher and Leader Effectiveness on Collective Bargaining August 17,
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
UNITED NATIONS STAND-BY ARRANGEMENTS SYSTEM (UNSAS)
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Session 7 - Maintenance - contract and day-to-day Maintenance Support Presenter  Grenville Powell (Managing Director - of Shokaz Integrated Computing.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
1 15 quality goals for requirements  Justified  Correct  Complete  Consistent  Unambiguous  Feasible  Abstract  Traceable  Delimited  Interfaced.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
MD RMDCN within RA VI – status and perspectives CBS/ET-IMTN, June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Project management Topic 3 Quality.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Grant Administration Agreement Which governs the relationship between NSFAS & Institutions.
1 Service Center FY2006 Billing Rate Proposal Preparation.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Company LOGO Network Management Architecture By Dr. Shadi Masadeh 1.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Data Hosting and Security Overview January, 2011.
1 Consultation: Framework Contract for Home Support and Care Homes with/out nursing 1 June 2011.
Advisory Board Charter Template
Eligibility Rules Stefan Nyström, Managing Authority June 1, 2016 – Cork, Ireland.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Welcome to MiCTA Learn about MiCTA’s National E- Rate Program.
1 Details of the Sword Contract Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual learning)
The Mediation Centre of Chamber of Notaries in Gdańsk
Presentation to the Portfolio Committee on Communications on the:
Agenda Item 2: Catch up session 15 May 2017
RMDCN Status Report Submitted by: Oliver GORWITS (ECMWF) (Doc 20)
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Administration of a FIDIC Contract - Project Control
Content of Tender Dossier - Instructions to Tenderers - Tenders
MM03 - Master Data in Purchasing & Contract
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Sales Process March 2017.
Relate to Clients on a business level
NPA 450/579 (Area Code) Relief in Quebec
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
WMO RA-II WIGOS Workshop Workshop summary and recommendations
ISDS Service Support Performance – May 2019
Presentation transcript:

RMDCN Workshop, Jan 99 ECMWF/WZ-1 RMDCN Contract & Accession Agreements Walter Zwieflhofer Head of Computer Division ECMWF

RMDCN Workshop, Jan 99 ECMWF/WZ-2 Background to the Contract Proposal to establish a Joint Network –GTS traffic for WMO RA VI –Traffic between ECWMF and the ECWMF Member States –Based on the service supplied by a managed network supplier Agreement between WMO and ECMWF –Governs the responsibilities within the RMDCN project –Content was adopted by RA VI at its XII session in Tel Aviv (May 98, Resolution 4) –Subsequently, the Agreement was signed in June 98

RMDCN Workshop, Jan 99 ECMWF/WZ-3 WMO/ECMWF Agreement (1) Selection of the Service Provider –Selection was to be performed by ECMWF 4ITT was issued 4EQUANT has been selected RMDCN master agreement –To be concluded by ECMWF 4RMDCN Contract was signed on 4 December 98 4Service Provider must be committed to extend the service to all RA VI members requesting to join the RMDCN

RMDCN Workshop, Jan 99 ECMWF/WZ-4 WMO/ECMWF Agreement (2) Formal status of RMDCN –will be part of the GTS as regards to RA VI telecommunication requirements 4recognised by ECMWF 4WMO Contract Advisory Committee (CAC) 4RMDCN Operations Committee Underlying Transport Layer –ECMWF will not change it for at least 5 years 4Duration of the Contract with EQUANT is for at least 5 years

RMDCN Workshop, Jan 99 ECMWF/WZ-5 WMO/ECMWF Agreement (3) Monitoring –ECMWF will monitor RMDCN on behalf of all participating RA VI members (in particular, the Service Level Agreement) RA VI Members (other than ECMWF Members) –To participate, they must enter into a contract with the selected supplier (the Accession Agreement) 4General terms shall be governed by the master agreement Use by participating Members –Members agree to use RMDCN only for GTS related traffic –Members agree to comply with the security measures stipulated

RMDCN Workshop, Jan 99 ECMWF/WZ-6 Contract Framework RMDCN Contract –ECMWF –All ECMWF Member States –Co-operating States of ECMWF at their own option –Ceiling prices for the entire WMO Region VI –Signed by EQUANT and ECMWF Accession Agreements –For all other WMO RA VI member joining the RMDCN –Each state requires its own Accession Agreement –Signed by EQUANT and the Acceding State

RMDCN Workshop, Jan 99 ECMWF/WZ-7 Structure of the Contract Document Body of the Contract has 29 Clauses –warranties by EQUANT, ECMWF and Acceding Parties –liabilities of EQUANY, ECMWF and Acceding Parties –how to proceed in the event of disputes 14 Schedules –Schedule A contains Definitions used throughout the Contract Annex A –Proforma Accession Agreement

RMDCN Workshop, Jan 99 ECMWF/WZ-8 Selected Clauses/Definitions (1) Initial Deployment –All ECMWF Member States –Plus all Non-ECMWF members which have signed an Accession Agreement by 31 March 1999 –Reliability Test of the Initial Deployment is scheduled for July 1999 Term of the Service –8 years starting on the Service Commencement Date –Service commences when the Initial Deployment is accepted –Break point after 5 years Accession Agreements –Can be concluded throughout the term of the contract

RMDCN Workshop, Jan 99 ECMWF/WZ-9 Selected Clauses/Definitions (2) The Service –EQUANT must supply the service in accordance with the –Service Description (Schedule B) –Service Level Agreement (Schedule C) –Service Particulars in Schedule D –Service Particulars in the Accession Agreements Extending the Service –At the request of a Non-ECMWF RA VI country, EQUANT must extend the Service to include that country on the terms and within the ceiling prices contained in the Contract

RMDCN Workshop, Jan 99 ECMWF/WZ-10 Service Level Agreement (1) Scheduled Maintenance –No single outage must exceed 60 minutes –In practice, only 15 minute slots are envisaged by EQUANT Guaranteed Repair Time –Baseline is a 4-hour restore time for any Severity 1 fault (Severity 1 implies that the service is unavailable) –Four-hour restore time was a requirement in the ITT –Difference between restoring the Service and fixing the fault –EQUANT agreed to guarantee a 4-hour restore time subject to the availability of a cold standby router at the customer site

RMDCN Workshop, Jan 99 ECMWF/WZ-11 Quality of Service Indicators

RMDCN Workshop, Jan 99 ECMWF/WZ-12 Service Level Agreement (2) Service Availability –Baseline figure is 99.5% (with some exceptions) –Measured for each individual Virtual Circuit –TNPA for Virtual Circuits with diverse backup of the Access Lines –NPA for other Virtual Circuits Network Response Time (NRT) –Round-tip time of a 128 byte packet (between PoPs) –Baseline is a NRT of less than 300 ms (with some exceptions)

RMDCN Workshop, Jan 99 ECMWF/WZ-13 Service Level Agreement (3) Service Reliability Metric –Number of service interruptions per month per Virtual Circuit Service Degradation –Measured throughput of a Virtual Circuit must not fall below 80% of the CIR associated with that circuit –Measured throughput does not apply to Virtual Circuits via X.25 Access lines –Backup service must be available for at least 90% of the time Global Service Degradation –When 30% or more of all Virtual Circuits fail to meet the SLA

RMDCN Workshop, Jan 99 ECMWF/WZ-14 Service Rebates Service Rebates are due when –TNPA/NPA service levels are not met (e.g %) –NRT exceeds 110% of the agreed level (e.g. 330 ms) –Service Reliability Metric exceeds the agreed level (e.g. 6) –Service Degradation has been demonstrated Calculation of Service Rebates –Calculated for every individual Virtual Circuit –Percentage of the Relevant Monthly Charge –Total costs per site divided by the number of Virtual Circuits –Cumulative but cannot exceed 100% of the monthly charge

RMDCN Workshop, Jan 99 ECMWF/WZ-15 Acceptance (Schedule F) Acceptance of the Pilot Deployment –ECMWF plus two sites Site Acceptance for the Initial Deployment –Demonstrate functionality/installation at every site –Verify the general workmanship, access to help desk, etc. –Test X.25 and TCP/IP protocols plus throughput measurements Reliability Acceptance for the Initial Deployment –30 day availability test over all Virtual Circuits –90% of the Virtual Circuits have to meet the SLA –The rest has to be within a 30% rebate level

RMDCN Workshop, Jan 99 ECMWF/WZ-16 Contract Monitoring Various regular meetings and reviews –Between ECMWF and EQUANT –ECMWF and the RMDCN Operations Committee Price review –First review will be two years after contract signature, thereafter annual reviews will be held –Price reviews will be done on an element by element basis using the then current Price Book of EQUANT with the level of discount offered during the ITT applied –Changes are only effective if the difference is more than 3% –Only reductions are acceptable

RMDCN Workshop, Jan 99 ECMWF/WZ-17 Proforma Accession Agreement General –Annex A of the RMDCN Contract –“Acceding Party” refers to a RA VI member wishing to join –Needs to be signed by EQUANT and the Acceding Party Review by ECMWF –ECMWF will review proposed Accession Agreements for consistency with the RMDCN Contract and other Accession Agreements Specifics of the Service –Will be detailed in the AP Service Particulars –AP Service Particulars will be part of each Accession Agreement

RMDCN Workshop, Jan 99 ECMWF/WZ-18 AP Service Particulars –Service Address –Nominated User Representative (for Change Requests) –Bandwidth and type of Access Line –Destination and CIR of Virtual Circuits (Frame Relay) –Service Level Parameters –Service Availability –Network Response Time –Help Desk –Contact details, languages supported, hours of operation –Service costs and billing details

RMDCN Workshop, Jan 99 ECMWF/WZ-19 Process for completing an Accession Agreement (1) 1.A Non-ECMWF RA VI member wishes to join the RMDCN 2.The RA VI member contacts the RMDCN Account Manager of EQUANT 3.Contact details of the RMDCN Account Manager of EQUANT are available either through the WMO Secretariat or ECMWF 4.The RMDCN Account Manager of EQUANT informs ECMWF of the RA VI member’s intention to join the RMDCN 5.The RA VI member and EQUANT agree the Service Particulars and conclude an Accession Agreement

RMDCN Workshop, Jan 99 ECMWF/WZ-20 Process for completing an Accession Agreement (2) 6.EQUANT forwards the Accession Agreement to ECMWF 7.ECMWF verifies it for consistency with the overall RMDCN service; for example, ECMWF will require corresponding Accession Agreements or Change Requests from other RA VI members 8.In the event of any problems, ECMWF will notify the RA VI member and EQUANT 9.ECMWF will forward a copy of all approved Accession Agreements to the WMO and to the Regional Telecommunications Co-ordinator of RA VI 10.The Service is installed and Acceptance Tests are performed