DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM 11-003 R&M Engineering.

Slides:



Advertisements
Similar presentations
U Development of Reliability Program Standard GEIA-STD-0009 SE Summit March 2009 Approved for Public Release; Distribution is unlimited.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
RAM VII Training Summit
ITIL: Service Transition
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
OASD Logistics and Materiel Readiness
OSF/ISD Project Portfolio Management Framework January 17, 2011.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 Lecture 5.2a: SEF Ch 8 SE Outputs Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Life Cycle Logistics FIPT Life Cycle Logistics Learning Asset Association for FIPT Approved High Priority Competencies 21 October 2011.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Team-Based Development ISYS321 Managing the Information Systems Project.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Materiel Development Decision (MDD) Information Requirements
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
Condition Based Maintenance Plus (CBM+) Overview
FY12-14 Life Cycle Logistics DAWIA Certification Requirements Overview and Life Cycle Logistics Competency Validation Status Update Life Cycle Logistics.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
Distribution Statement A – Approved for public release by OSR on 10/23/2014, SR Case # 15-S-0128 applies. Distribution is unlimited. DAU Symposium 4/27/2016.
Business, Cost Estimating & Financial Management Considerations
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Software Configuration Management
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
JTAMS PRE-MILESTONE B ANALYSIS
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Product Support Considerations
Engineering Processes
Presentation transcript:

DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies R&M Engineering 08/16/11 Page 1 DTM R&M Engineering Implementation Strategy Andrew Monje Deputy Assistant Secretary of Defense, Systems Engineering Office of the Under Secretary of Defense (Acquisition, Technology and Logistics) 16 Aug 2011

R&M Engineering 08/16/11 Page 2 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies PURPOSE Provide overview of the R&M Implementation Strategy upon approval of DTM AGENDA DTM Overview Policy Implementation - DTM Process - Guidance & Standards/DIDs People - Human Capital Summary Open Discussion Purpose / Agenda

R&M Engineering 08/16/11 Page 3 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies Engineering activities (AS to describe tasks and processes to be stated in the RFP) –R&M Allocations, block diagrams and predictions –Failure definitions and scoring criteria –Failure Mode, Effects and Criticality Analysis (FMECA) –Built-in test and maintainability demonstrations –Reliability Growth testing at system/subsystem level –Failure Reporting, Analysis and Corrective Action System (FRACAS) Preliminary RAM-C Report in support of MS A and updated for MS B & C –Provides early (Pre-MS A) reliability, availability, maintainability and ownership cost feasibility assessments of alternative concepts − Includes early formulation of maintenance & support concepts –Provides an audit trail that documents and supports JCIDS thresholds –Ensures correct balance between the sustainment metrics (Availability-KPP, Materiel Reliability-KSA, and Ownership Cost-KSA) –Provides early risk reduction by ensuring requirements are realistic and correct AS and SEP to specify how the JCIDS sustainment thresholds have been translated into R&M design requirements for use in contract specifications DTM Overview

R&M Engineering 08/16/11 Page 4 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies DTM Overview Reliability Growth Strategy –Documents system-level reliability growth curves in the SEP beginning at MS A and updated in the TEMP beginning at MS B –Establishes intermediate goals for reliability growth curves that will be tracked through fully integrated system-level test and evaluation events until the threshold is achieved –Requires MS C PMs and Operational Test Agencies to assess reliability growth required to achieve the reliability threshold during Initial Operational Test and Evaluation Tracking and Monitoring –Requires PMs to report status of reliability objectives and/or thresholds as part of the formal system engineering review process –Incorporates Reliability Growth Curves into the Defense Acquisition Executive System (DAES) review process

R&M Engineering 08/16/11 Page 5 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies DoDI Encl(6) Test DAES Quad Chart Policy Implementation DTM Incorporating DTM in DoD 5000 and affected Governance Documents –DoDI & enclosure 12 (SE) revision – Complete & sent to DPAP –Enclosure 13 (Logistics) – Comments provided to L&MR –Systems Engineering Plan Outline – Approved –Acquisition Strategy Outline – Approved –Preliminary Design Review Report Guideline – Completed –TEMP outline – Currently in review –LCSP outline – In work –DAES RVW Growth Quad chart – In work Systems Engineering Plan (SEP) Test & Evaluation Master Plan (TEMP) Technology Development Strategy/ Acquisition Strategy Preliminary Design Review Report DTM /21/11 Life-Cycle Sustainment Plan Encl(12) System Engineering In review/In-work Approved Status: DTM to Policy and Acquisition Document Relationships DoDI Encl(13) Lifecycle Logistics

R&M Engineering 08/16/11 Page 6 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies v.01 Annotated Outlines for TDS/AS, SEP Released as “Expected Business Practice” TDS/AS and SEP outlines signed April 20, 2011 Technology Development Strategy [or] Acquisition Strategy Annotated Outline Systems Engineering Plan Annotated Outline April 20,

R&M Engineering 08/16/11 Page 7 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies v.01 Identify the engineering activities to be stated in the RFP and required of the contractor to demonstrate the achievement of the reliability and maintainability design requirements. Provide a table (see example below) to specify how the sustainment key performance parameter thresholds have been translated into reliability and maintainability design and contract specifications … The reliability threshold is often expressed as Mean Time Between Failure (MTBF). Use the appropriate life units (e.g., hours, cycles, etc.). “MTTR” is “mean time to repair;” “N/A” may be entered if an item is not applicable. R&M in the TDS/AS Reliability and Maintainability Requirements ParameterThreshold Contract Specification Requirement Reliability (e.g., MTBF) Maintainability (e.g., MTTR)

R&M Engineering 08/16/11 Page 8 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies New Reliability Reporting Document the Reliability Growth Curve beginning at MS A, updated at each successive milestone, … and report planning to generate R&M artifacts. Implementation of New Reliability Policy

R&M Engineering 08/16/11 Page 9 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies v.01 Update to DAG Chapter 4 R&M Sec –Include overview of R&M Eng Activities by phase –Apply R&M Eng activities based on program position in Life Cycle –Also based on acquisition strategy and equipment type − Provides guidance on Reliability Growth Program –Includes R&M contract guidance with associated DIDs Collaborate with DAG Editors (i.e., to ensure R&M guidance is properly integrated Develop R&M Engineering Guidance with task descriptions per phase –Describes R&M engineering activities across typical program areas Forming R&M Standards working group –Priority given to standards that directly relate to the R&M engineering activities required by the DTM –R&M Eng Mgt STDs 1 st (i.e. 785, 470, & 2165) –Design & Reliability Growth STDs (i.e. 1629, 1635) Process - Guidance & Standards/DIDs DAG LM&R Chapter 5 Updates DAG SE Chapter 4 Updates Key R&M Engineering Standards & DIDs DAG DDT&E Chapter 9 Updates Defense Acquisition Guidebook R&M Engineering Guidebook

R&M Engineering 08/16/11 Page 10 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies v.01 Materiel Solution Analysis Phase MS A MDDMDD MDDMDD DOD LIFECYCLE ENTRY ICD TES TDS SEP GOV TASK ASSIGNMENT PR & RFP FOR MSA INPUT TO TDS PR/RFP TECH DEV PHASE PROPOSAL EVAL CRITERIA PROCUREMENT (SECT. VIII) INPUT TO TES TEST AND EVALUATION (SECT. VII) MAINT. ANALYSIS LIFE CYCLE SUSTAINMENT PLAN R&M RQMTS. ANALYSES TRADEOFF STUDIES R&M ANALYSIS REPORTS SYSTEM ENGINEERING (SECT. V) CONFIG MGMT. TECH DEV SYSTEM SPEC CONFIGURATION MANAGEMENT (SECT. IV) R&M DATA RQMTS UPDATE DATA CONTROL (SECT. III) RAM-C REPORT SUMMARY INPUT TO SEP PM PLAN PROGRAM REVIEW PROJECT CONTROL (SECT. II) MS-A PHASE FUNCTIONS R&M PLANS TECHNOLOGY DEV PHASE REJECT ACCEPT A A R&M PLANS MSA ICD R&M DATA RQMTS 3 REVIEW CONTRACT ITR ASR FUNCTIONAL BASELINE AOA Draft CDD LOGISTICS PLANNING (SECT. VI)

R&M Engineering 08/16/11 Page 11 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies People Human Capital Objective: Increase PM demand for R&M Engineering and enhance R&M Engineering professional capabilities to successfully implement a R&M program. Approach –Define R&M Engineering tasks –Develop R&M Engineering competencies for PM and R&M Engineers – Submit R&M competencies to DAU for curriculum development via SE FIPT chair –DAU develops training architecture, curriculums, training content and delivers training. R&M Engineering E&T Strategy Capture/Define R&M Engineering Tasks and Associated Roles Define R&M Engineering Competencies For Associated Roles (incl. KSAs) Define R&M Engineering Learning Architecture (e.g. CLMs, SPRDE/SE Courses & R&M Competencies Integration, Dedicated R&M Courses) Develop and Deliver Training

R&M Engineering 08/16/11 Page 12 DISTRIBUTION STATEMENT A: Cleared for Public Release by OSR on 8/04/11; SR Case # 11-S-3228 applies Summary Actively engaged on all Focus Areas to improve “Technical Health” of R&M Engineering Institutionalizing the process across the Services Collaborating with other functionals (e.g., test, logistics …) DTM implementation will: –Not burden the programs with unreasonable expectations –Not drive a “One Size Fit All Solution” on programs –Smartly apply engineering activities based on acquisition strategy & life cycle position