Presentation is loading. Please wait.

Presentation is loading. Please wait.

Product Support Considerations

Similar presentations


Presentation on theme: "Product Support Considerations"— Presentation transcript:

1 Product Support Considerations
CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA Product Support Considerations PS Activities Logistics trade studies /market research incorporated in AoA ID support & MX concepts/technologies ID initial PS metrics ID PS risks/cost drivers Develop mx planning & management requirements Support initial RAM-C Rationale Report Develop PS inputs to IMS Develop draft LCSP Identify TMRR AS PS risk/ opportunities Update LCSP Identify EMD AS PS risk/ opportunities Design for supportability Develop initial disposal strategy Develop fielding strategy Core, 50/50, and DSOR/SOR evaluation Evaluate 12 IPS elements for inclusion in RFP Develop IP strategy Update PS IMS Conduct ILA Support RAM-C Performance metrics identified Identify Production/ Sustainment AS PS risk/ opportunities Develop MX plan Execute PS related DT&E/OA Validate MX & training procedures/publications Develop training plan Develop & procure training equipment Complete provisioning analysis Design for supportability evaluate as part of CDR Spectrum supportability determined Maintenance tasks identified Create manning billets PSI determined Complete ILA Refine performance metrics Update Sustainment AS PS risk/ opportunities Complete supportability demonstration Complete IOT&E Complete performance based agreements Update PS BCA Update maintenance plan Complete SVR and PCA Verify maintenance & training procedures/publications Ensure PHS&T compliance Initiate initial operational deployment Execute supportability metrics tracking and analysis System fielding completed Execute obsolescence/ capability improvement modifications Execute/update training program Complete FOT&E Trades Studies may include: Training Systems Requirements Analysis Training Situation Analysis Manpower Estimates Economic Analysis Documentation and Reviews Acquisition Strategy Draft CDD Initial inputs to PPP, SEP, TEMP, & LCSP Inputs to RFP ASR System specification Update LCSP Initial interface control documents Update PS risk assessment PDR, ILA System and product specifications LCSP Reliability Growth Plans Interface control documents Disposal Plan Update LCCE FMECA CDR, SVR/FCA, ILA Update Disposal Plan PCA, PIR Obsolescence studies/reports DMSMS reports ISR

2 AS: Acquisition Strategy
ASR: Alternative Systems Review CDD: Capability Development Document CDR: Critical Design Review CPD: Capability Production Document CONOPs: Concept of Operations DSOR: Depot Source of Repair EOA: Early Operational Assessment FMECA: Failure Modes Effects Criticality Analysis FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation ICD: Initial Capabilities Document ID: Identify ILA: Independent Logistics Assessment IMS: Integrated Master Schedule PHS&T: Package Handling Storage and Transportation PIR: Post-implementation Review PPP: Program Protection Plan PS: Product Support RAM-C: Reliability, Availability, & Maintainability – Cost SVR: System Verification Review SEP: System Engineering Plan SFR: System Functional Review SOR: Source of Repair SVR/FCA: System Verification Review/ Functional Configuration Audit TEMP: Test and Evaluation Master Plan TRA: Technology Readiness Assessment TRR: Test Readiness Review TSFD: Technology Security & Foreign Disclosure IOC: Initial Operational Capability IOT&E: Initial Operational Test & Evaluation IP: Intellectual Property IPS: Integrated Product Support ISR: In Service Review LCCE: Life Cycle Cost Estimate LCSP: Life-Cycle Sustainment Plan MDD: Materiel Development Decision MX: Maintenance OA: Operational assessment OMS/MP: Operational Mode Summary/Mission Profile OTRR: Operational Test Readiness Review PCA: Physical Configuration Audit PDR: Preliminary Design Review


Download ppt "Product Support Considerations"

Similar presentations


Ads by Google