Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.

Similar presentations


Presentation on theme: "Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents."— Presentation transcript:

0 Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to MS A Materials:  Lesson Charts, Internet connection, (Assumes AoA and PPBE are being covered by separate instructors in separate lessons - refer to Jan 2012 version if AoA lesson is removed from the RQM 310 plan)  Time Breakdown: Minutes Lesson Outline  Purpose: To familiarize the students with the key requirements management related activities : - leading up to the Materiel Development Decision (MDD), the scope/construct of the MDD, and the major outputs of the MDD during the Materiel Solution Analysis phase the scope/construct of the Materiel Solutions Analysis Phase other than AoA the decisions made at Milestone A. This lesson comes after a lesson on the Capabilities-Based Assessment (CBA) process and an exercise dealing with Initial Capabilities Documents (ICD). And before a lesson on OSD level AoA activities. Ensure that you do not unnecessarily duplicate any material that has already been presented, particularly the information dealing with the AoA process. Chart 0, Introduction. MDD in and out: This is summary level of detail on some of the requirements management related activities that occur before, during and shortly after the Materiel Development Decision. Keep in mind that the ACAT of the potential acquisition program matters: for Major Defense Acquisition Programs (MDAP – ACAT I, and Major Automated Information System (MAIS) – ACAT IA programs), MDD will occur at the Defense Acquisition Board (DAB) or the Information Technology Acquisition Board (ITAB) level at the Office of the Secretary of Defense (OSD) with heavy involvement of the Joint and OSD staffs. These programs represent less than 10% of potential new acquisition programs. When dealing with non-MDAP/MAIS Component HQ guidance will apply; however, it will be very similar to that required for MDAP/MAIS programs, less some (but not all) congressional reporting requirements. MDD to MS A: Now that we have previously discussed what happens leading up to and immediately after the Materiel Development Decision (MDD), we are going to cover any necessary details that might not have been mentioned in the AoA Block of instruction or the PPBE block of instruction. Emphasis will be on the requirements management activities that take place after the MDD review during the Materiel Solution Analysis (MSA) phase of the acquisition process. (copied From word document embedded in chart 0 ) Reading Assignments -   Read:  MDD to MS A Lesson Charts. DoDI , Enclosure 2, Procedures, paragraph 1, Defense Acquisition Management System; paragraph 2, Evolutionary Acquisition; and paragraph 3,User Needs and Technology Opportunities. paragraph 4, Materiel Solution Analysis Phase Department of Defense Reliability, Availability, Maintainability, and Cost Rationale Report Manual, 1 June 2009, paragraph 1.4 Applicability (and all sub-paragraphs under 1.4). Improving Milestone Process Effectiveness (Paragraph 1. Milestone A: ) Scan: JCIDS Manual, Enclosure B , ICD and IS ICD , pages B-9 to B-20, and draft CDD on page B-27 Directive-Type Memorandum (DTM) Implementation of the Weapon Systems Acquisition Reform Act of 2009, attachment 1, paragraph 1, Analysis of Alternatives (AoA) Study Guidance Directive-Type Memorandum (DTM) – Development Planning to Inform Materiel Development Decision (MDD) Reviews and Support Analyses of Alternatives (AoA) Defense Acquisition Guidebook, part 3.3.2, Role of the Analysis of Alternatives (AoA) as Part of the Materiel Solution Analysis, and Part Analysis Of Alternatives Study Plan. Topics for in class discussion - Online resources: ADM MDD Amphib Combat V ACV_1Dec11.pdf ADM MS A JHSV 5 May 06 ADM MS A Ohio Replacement, OHIO_ORJan 11 with affordability and exit criteria ADM post-MS A review OHIO_Replacement_1 Aug 2011 Tom Fritz

1 Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents and processes during Materiel Solution Analysis (MSA) phase that are dependent on the ICD Explain the inputs to a Materiel Development Decision (MDD) Explain the outputs from MDD -- decisions and approvals Recognize the additional information necessary for an Information System (IS) ICD Summarize the purpose and major activities that take place during the Materiel Solutions Analysis (MSA) phase and the links between those activities Explain the Milestone A decisions and approvals

2 Materiel Development Decision (MDD)
Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review MDD is mandatory for all programs. For DAB programs: Joint Staff presents JROC Recommendations DoD Component presents the ICD, including: Preliminary CONOPS Description of Needed Capability Operational Risk Basis for determining that non-materiel approaches will not sufficiently mitigate capability gap How is MDD conducted for Service and Agency programs?

3 Materiel Development Decision (MDD) Inputs and Outputs
Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review Outputs: Approval to enter the acquisition process Acquisition Decision Memorandum Identifies acquisition phase of entry and initial review milestone Designates lead DoD Component Directs initiation of AoA Milestone Decision Authority Inputs: Initial Capabilities Document (ICD) Approved AoA Study Guidance & AoA Study Plan (DAU Guidebook and AT&L memo Apr 2010) Evidence IAW DTM

4 DTM 10-017 - Development Planning to Inform MDD Reviews and Support AoAs
Components shall provide evidence at the MDD Review that will facilitate the Milestone Decision Authority (MDA) determination that: Candidate materiel solution approaches have potential to effectively address capability gap(s), desired operational attributes, and associated dependencies Range of technically feasible solutions exist – generated from across the entire solution space, as demonstrated by early prototypes, models, or data Consideration has been given to near-term opportunities to provide a rapid interim response Plan to staff and fund analytic, engineering, and programmatic activities supports the proposed milestone entry requirements DTM , September 13, 2010 extended to 12/31/2012

5 Pre-MDD Activities - Summary
ICD validated (approved for entry into KM/DS, assigned a Joint Staffing Designator (JSD), staffed, reviewed, certifications approved, and validated at JSD level) ICD recommends type of materiel approach(es) preferred Analysis of Alternatives (AoA) AoA Study Guidance & AoA Study Plan approved prior to MDD Sponsor works with Director, Cost Assessment and Program Evaluation (DCAPE) on AoA Study Guidance & AoA Study Plan (JROC Interest programs only – Component process for others) Sponsor works with MDA’s staff to ensure other additional information is provided to enable the desired MDD outcomes in the MDD ADM

6 MDD to Milestone A Materiel Solution Analysis
Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B President SECDEF CJCS CCMDs and other DoD Components Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD Post CDR Assessment Pre-EMD Review Draft AoA review and Portfolio Assessment AoA report PDR review

7 MDD to Milestone A Requirements Management Activities
Materiel Solution Analysis (DoDI 5000 Link) Materiel Development Decision A ICD Contract A AoA Report Contract B Final RFP Contract C Draft CDD Purpose: Assess potential materiel solutions Major Activity: AoA Requirements Management Activities Apply ICD and supporting analysis to guide: Conduct of AoA (sponsor supports AoA Report briefing for FCB) Writing of : Test & Evaluation Strategy (TES), Technology Development Strategy (TDS) , System Engineering Plan Initial estimates for: Affordability Targets, Cost, and PPBE documents Develop: Draft CDD – “required” to support MS A and TD phase but not submitted to JCIDS for validation – content may be defined in JCIDS update Draft CDD may include linkage to the Reliability, Availability, Maintainability Cost Rational (RAM-C) Report

8 Reliability Analysis, Planning, Tracking, and Reporting
Program Managers (PMs) shall formulate a comprehensive reliability and maintainability (R&M) program with reliability growth strategy as an integral part of the systems engineering process For JROC Interest programs (except Information Systems) Component develops initial RAM-C Report as part of the AoA process. Attached to the Systems Engineering Plan (SEP) for MS A, updated for MS B and MS C PM develops reliability growth curves (RGS) for SEP at MS A, updated in the TEMP beginning at MS B. RAM-C Report Executive Summary attached to (or Referenced in) CDD & CPD Programs other than JROC Interest develop RAM-C Reports as determined by DoD Component or PM See, DoD Reliability, Availability, Maintainability, and Cost Rationale Report Manual, June 1, 2009 and AT&L DTM

9 MDA approves: (usually contained in a single ADM)
Milestone A MDA approves: (usually contained in a single ADM) Materiel solution Affordability Targets (per DAB Templates for Milestones A, B and C) Technology Development Strategy (TDS), DAG 2.2 Release of final RFP and source selection for TD phase. Exit criteria for next phase - Technology Development Milestone A Certification, Title 10 section 2366a Tailored guidance to complete Materiel Solution Analysis activities or structure TD activities Full Funding defined with MS B Notes: A favorable Milestone A decision does not mean a new acquisition program has been initiated. Exception - ship building programs may be initiated at Milestone A. MAIS programs begin tracking funds first obligated a includes 25% cost increase / schedule delay notification for certified MDAPs.

10 ACAT I Program Certification for MS A WSARA 2009 & NDAA 2012 Revisions
MEMORANDUM FOR THE RECORD SUBJECT: Milestone A Program Certification As required by Section 2366a of Title 10, United States Code, I have consulted with the Joint Requirements Oversight Council (JROC) on matters related to program requirements and military needs for the (name of program) and certify that: (1) the program fulfills an approved initial capabilities document; (2) the program is being executed by an entity with a relevant core competency function as identified by the Secretary of Defense; (3) [include only if the system duplicates a capability already provided by an existing system] the duplication of capability provided by this system is necessary and appropriate. (4) That a determination of applicability of core depot-level maintenance and repair capabilities requirements has been made; (5) an analysis of alternatives has been performed consistent with the study guidance developed by the Director of Cost Assessment and Program Evaluation; (6) a cost estimate for the program has been submitted, with the concurrence of the Director of Cost Assessment and Program Evaluation, and the level of resources required to develop, procure, and sustain the program is consistent with the priority level assigned by the JROC; and, WSARA Changes highlighted in bold red; NDAA 2012 changes in bold blue italics

11 AoA Plan AoA and AoA report
Linkage: ICD, AoA, draft CDD, & Contract for Technology Development (TD) Strategic Direction Joint Operations Concepts CONOPS Feedback from field Cost Estimate & $$ TD CBA Capability attributes AoA Plan MOEs/ MOPs Preliminary SPECIFICATIONS to support RFP for TD Phase prototyping KPPs/ KSAs Materiel Solution Analysis Phase Materiel Development Decision Draft CDD ICD Milestone A Contract AoA and AoA report Test & Evaluation Strategy (TES) Technology Development Strategy (TDS) System Engineering Plan Contract A Final RFP 11