MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Beam line characterization with the TOFs1 Demonstrating the emittance-momentum matrix Mark Rayner, CM26 California, 24 March Initial.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
MOM report – part I Roumen Tsenov as MOM ( )
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
MOG Aug 2010J.S. GraulichSlide 1 Comments on User Run o All went pretty well but we can always improve Jean-Sebastien Graulich, Geneva.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
3 June 2009J. H. Cobb 1 ANALYSIS SUMMARY CM24 Agenda for Analysis parallel session at CM Sunday 31 May 14:00.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Mark Rayner – Analysis SessionCM25, 4 November Beam characterization by the TOFs Mark Rayner The University of Oxford MICE CM25.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
Early Results from Beam Line Studies Jean-Sebastien Graulich, Geneva
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
MICE Operations Scenario Run 1
MICE Collaboration Meeting
Presentation transcript:

MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva

MICE VC Aug '10J.S. GraulichSlide 2 Achievements since CM27  A lot of Data Taken: Target Actuations Target Actuations Particle Triggers Particle Triggers  Emittance – Momentum Matrix Scan  Beam line studies (Q. Scans, D. Scans, DS Scans, Neutrals, etc…)  Online Reconstruction allows Online Tuning of the beam  DAQ Upgrade and included in Alarm Handler  Configuration Data Base in use

MICE VC Aug '10J.S. GraulichSlide 3 Data Taking  From 8:00 to 20:00 Every day ISIS makes Rest on Sunday (and Saturday too )  Start-up procedure well trained Less than 30 minutes  Every day starts with a reference run 400 pulses in 6 +/-200 M0 At fixed target delay and dip depth  A target “Calibration” run taken daily  All Hardware found stable Target, Detectors, Magnets, etc

MICE VC Aug '10J.S. GraulichSlide 4  -p Matrix   Several Beam line optics Prepared by Marco Apollonio Available on MICE Wiki (Chris Tunnell) M0 and M1 correspond to different way to obtain the right distribution in phase-space after the diffuser according to G4BeamLine Main Goal: Comparison Data / Simulation

 -p Matrix Scan As on July 30 Negative polarity M0M1M0M1M0M1 3 39,434 57,763 57, ,44045,28461,65250,52239,41745, ,49053,00650,44627,81443,87045,212 Positive polarity M0M1M0M1M0M1 3 80, , , ,040103,042302,897225,200120,91177, ,09098,460120,00080,000105,17268,576 By Chris Heidt

MICE VC Aug '10J.S. GraulichSlide 6 Beam Line Studies   See previous talks Summer Blot, Rob Fletcher   Some important results Quad scans: We do observe X and Y offsets Need to be investigated Neutrals We do observe neutrals causing Triggers in TOF1 Even if all magnets are Off ! Only when we dip the target ! (scales with beam loss) Only when the beam blocker is open ! Proton absorber doesn’t affect the trigger rate

MICE VC Aug '10J.S. GraulichSlide 7 D1 Scan D2 kept constant, selecting the same momentum as for negatives (without proton absorbers) TOF1 rate (normalized to LumMon) D1 Current / Nominal By Chris Heidt

MICE VC Aug '10J.S. GraulichSlide 8 Online Tuning   Online Optimization Chris Rogers and Mark Rayner spent 2 days in MLCR A lot of improvement in Online Software Work still in progress   Main Goal Comparison data /Simulation (G4MICE)   Put stress on two issues CDB entry available only at the end of the RUN ! No way to use Quad currents from CDB Emphasize the need for CAM data in data stream Note: Already available, miss unpacking (the guy in charge is informed…) DAQ must be stable… Huge progress achieved last week (faulty board replaced)

9 Online Monitoring Online Monitoring running —Discovered lower hits in TOF0 when triggered on TOF1 Slides From Linda Coney

10 Online Reconstruction Selection of Good Muons —Good = green, bad = red Reconstructed Momentum (blue)

11 Online Reconstruction Basic Particle ID using TOFs —e, , pions, protons

12 Online Reconstruction Phase Space Plots Using TOFs (x, P x ) (y, P y ) —TOF0 (top plots) —TOF1 (bottom plots)

13 Online Data Quality Check TOF Monitor – y, x, combined distributions for TOFs —TOF0 (top plots) —TOF1 (middle plots) o Looks like one slab noisy —TOF2 (bottom plots)

14 Online Data Quality Check Time of Flight plots —TOF1-TOF0 (top plot) —TOF2-TOF1 (middle plot) o Note separation capability —TOF2-TOF0 (bottom plot) Run 2595 —TOF Calibration positron beam (300 MeV/c at target)

15 Online Reconstruction Plots Run 2595 —TOF Calibration positron beam (300 MeV/c at target) —Phase Space plots —Momentum reconstruction

16 Online Applications Many thanks to Mark Rayner, Chris Rogers, Vassil Verguilov —For writing the reconstruction applications, getting the data reader to work online, setting up the environment of OnReco01, getting the reconstruction to work online, updating to the most recent TOF calibration & changing the fake scatter plots to colors! JSG Comment: hard to look at all this at the same time

MICE VC Aug '10J.S. GraulichSlide 17 DAQ System Upgrade  Moved to new system on July the 17th Standard OS (Centos 5.4) DATE Updated James’ Software installed everywhere Controlled Installation Procedure  Important Consequences No more Spill Mismatches ! (or only very rarely) DAQ can now talk to EPICS DAQ sends error to Alarm Handler when No Triggers (ISIS is down, or target is stopped, or HV is OFF, etc…) Too Many Triggers (event to big. It will also stop if it happens too often) Mismatch reflecting serious problem (1 trigger difference is OK)

MICE VC Aug '10J.S. GraulichSlide 18 CDB in Use   We can now reload the magnet configuration from a previous run by a single click ! That really helps Many Thanks to David Forrest and James Leaver   Should serve as an example Was available for more than 6 months !!! Information was just not passed   Please use CDB offline as well   Important Note: All variables not available through EPICS are set to zero Use spread sheet for the time being

MICE VC Aug '10J.S. GraulichSlide 19 Daily Operations   Procedure revised We don’t need to switch the Target Power Electronics OFF for Controlled Access to the Hall Saves time Daily walk through revised and simplified More and more items are archived and/or under Alarm   Network Printer Available in MLCR Also accessible by USB

MICE VC Aug '10J.S. GraulichSlide 20 Run Plans   MOM failed to publish it in due time   Was discussed on Mondays (after MICO)   We have covered well the original Plan for this user run   4 working days left + Machine Physics   We still want to do Target Delay Studies, including Spill Profile (Rob Fletcher) Pion Data with Downstream Quads Off Straight lines have advantages… Quads and Dipole Scans with Pion beam Smaller Momentum Spread (“same” momentum in D1 and D2)   We’ll continue 8:00-20:00 running + Sunday afternoon (Target Delay)

MICE VC Aug '10J.S. GraulichSlide 21 Machine Physics   Agreement for Exploring High Beam loss: Up to 10V !!! Testing Target Delay Operational Range at 3V beam loss   Not possible  Activation study   Plan Saturday August the 14 th (MOM = Roumen Tsenov) Start at 16h30 and We have midnight permission… Start with ISIS at 50 Hz, scan target Delay (1 hour) Redo Adam Dobbs’ study sith positive Push it to *very* high beam loss and break record

MICE VC Aug '10J.S. GraulichSlide 22 Summary   A lot of data taken   A lot of Progress in MLCR   Only a short time left   Join the fun !