SPS vacuum modification G.Vandoni SPS vacuum modification, 1.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Carbon for SPS, state or the art and scrubbing runs, P.Chiggiato, P.Costa Pinto, P.Cruikshank, J.Ferreira Somoza, H.Neupert, A.Sapountzis, M.Taborelli,
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
20 th SPS Upgrade Study Team meeting – 18 th November 2008 – J.Bauche, - AT/MCS/MNC 1.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
MODULE 2 Operate the Propane Liquid Supply System.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
SPSU – May 19, 2009 – Resources needed for SPS coating project– J. Bauche 1 Coating of the SPS Main Dipoles Vacuum Chambers: Resources Needed for Project.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Facility to coat the SPS magnets with carbon Objective: coat at least 90% of the SPS with a carbon thin film with low secondary electron emission in order.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Installation of an Instrument on a CERN machine
SPS - EYETS 2016/17 Vacuum systems planning
SPS cryogenic proximity equipment and SM18 validation
LHC Experimental Vacuum Systems Status October ‘07
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Mathieu, Gabriel, Max, Spyros, Guillaume
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Progress report on coatings for SPSU
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
TEST PLANS for HL LHC IT STRING
Coldex disinstallation
Advanced Research Electron Accelerator Laboratory
HAZOP Guidewords Base Set
ISRC and LEBT Vacuum System Design
Presentation transcript:

SPS vacuum modification G.Vandoni SPS vacuum modification, 1

26 th June 2009 Summary Open issues Modifications Shutdown workflow Procedures Vacuum layout EquipmentSummary SPS Vacuum modification, 2 What I expose here is the pot-pourri of possible modifications, the next step would be to establish a ranking and prioritize studies.

26 th June 2009 Some open issues Ageing upon air exposure: Rough-pumping VSdry air or N 2 venting Allowed time for air exposure? interdiffusivity Limited time for preliminary study: definition of well controlled procedures to permit post-mortem study & diagnostics What amount of coating is necessary <100% SPS vacuum modification, 3 Interdiffusion coeff ~1m 2 /s, front progression

Shutdown workflow TodayTomorrow Equipment disconnected at the start, reconnected at the end ◦BI instrumentation, magnets, septa… Alignment (tilt!) before connection Parallel work on several sectors: optimization of resources and equipment Slow transport engines, several magnets treated on each sector SPS Vacuum modification, 4 Immediate replacement upon disconnection OR rough pumping Closure and pumping before alignment, then reopening. Each sector is treated in a go: increased manpower and equipment. Any delay in transport may limit access in the tunnel (engine parked in-situ).

Procedures * TodayTomorrow Plug-in equipment is transported, aligned, connected exposed to atmosphere Magnet’s interchangeability, upon modification in situ of pumping port shielding to adapt to vacuum chamber’s length Substitution of heavy equipment by use of same engine (back and forth) Storage, transport of magnets opened or mechanically protected SPS Vacuum modification, 5 Connection under dry air or N 2 flood. To speed up replacement, magnets come back at the same place, or N 2 flow during pps modification As soon as an element is disconnected, the spare is connected or the 2 sector halves are rough-pumped Storage, transport of magnets under vacuum or N 2 *History control/post-mortem diagnostics

Vacuum and mechanical layout TodayTomorrow Experimental equipment in vacuum sectors Quadrupoles are references for alignment SPS Vacuum modification, 6 Multiplication of “phantom valves”? See above If quadrupoles are to be coated, a survey study is necessary for ways to shorten subsequent alignment process No necessity to refine sectorization: Long sectors would be briefly closed by blank flanges (like LHC) Delicate equipment, submitted to long air exposure, is already separated (back to “what amount of coating”?)

Equipment Study a new design of pumping ports to allow for alignement when closed, with pumping port shielding and sabre inserted, thin covers with N 2 venting and rough-pumping port Mobile, rough-pumping stations, monitoring needs and methods to study Study required for alignement equipment and procedures Study required for transport engines SPS Vacuum modification, 7

26 th June 2009 To conclude SPS Vacuum modification, 8 For vacuum, required actions are ◦Shutdown workflow and related manpower ◦Installation procedures (dry air flow, pumpdown) ◦Design of standard pumping port and closing flanges ◦Mobile pumping groups ◦Monitoring? Some analysis required from other groups: survey, transport, equipment groups Next step should be a ranking of necessary study