State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.

Slides:



Advertisements
Similar presentations
Federal Energy and Environmental Regulation Agencies and Laws
Advertisements

Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Major Federal & State Approvals Environmental Business Council of New England Land-Based Wind Energy May 29, 2008 Ruth H. Silman, Esq.
1 South Dakota Energy Infrastructure Authority (SDEIA) Presented at the South Dakota Legislative Energy Briefing Wednesday, January 18, 2006.
Planning Permission Process and Procedures
South Dakota Energy Infrastructure Authority (SDEIA) Legislative Energy Briefing Pierre, SD January 11, 2007.
South Boston Energy Project South Boston, VA
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Wind Power Development In South Dakota E-Week Presentation Rapid City, SD February 19, 2008.
Federal Energy and Environmental Regulation Agencies and Laws
Local Planning Process The General Plan SB 18 Training Program.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Welcome to the Fall Training Session for St. Lawrence County Municipal Planning Boards and Zoning Boards of Appeal.
Air & Waste Management Association Southern Section Tennessee Solid Waste Update Barry R. Stephens, P. E. September 12, 2012 Department of Environment.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Sector Planning Process Alachua County Commission July 8 th,
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
RURAL DEVELOPMENT WATER & WASTE PROGRAMS WATER AND WASTE FACILITIES WATER SYSTEMS OR COMPONENTS OF WATER SYSTEMS SEWER SYSTEMS OR COMPONENTS OF SEWER.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Oregon’s Statewide Land Use Planning Program A Framework for Community Decisions Richard Whitman – Director Oregon Department of Land Conservation and.
Planning Processes/Permits “From Pre-application meeting to Board of Aldermen Approval.” “From Pre-application meeting to Board of Aldermen Approval.”
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Public Information and EIS Scoping Meeting Glyndon, MN - February 4, 2009 For the Noble Flat Hill Windpark & 230 kV Transmission Line Project.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
The OSB Environmental and Natural Resources Section The Promise of Development: Natural Resource Issues in a New Economy May 7-8, 2009.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
VI. Developing a VSMP Program General Stormwater Training Workshop.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Participation and Intervention before the FERC October 2007.
Amherst County Comprehensive Plan (Update)
Local Powers for Land Use Regulation. Local Land Use Powers Land use regulation is considered a residual power –In most circumstances, that is… –Power.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
1 Concerned Citizens of Mason County OVERVIEW of ADAGE SEPA PROCESS State Environmental Policy Act Lead Agency - Mason County Department of Community Development.
Lynne Welsh Massachusetts Department of Environmental Protection.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Real Estate Investment Chapter 2 Land Use Controls © 2011 Cengage Learning.
Decommissioning Rules & Funds for Renewable Energy Facilities RenewElec Workshop October 21, 2010 Jonathan Voegele Research Associate Institute for Energy.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Federal Energy and Environmental Regulation Agencies and Laws
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Panama City – Bay County International Airport Project Update
Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.
SEQRA as a Tool to Review Energy Projects
The National Environmental Policy Act (NEPA)
Indiana Department of Environmental Management Office of Water Quality
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist National Conference of State Legislatures

Goals of the Presentation To outline the necessary steps for building a wind plant. To look in detail at the permitting process at the federal, state and local levels. To identify general rules applicable to most states in the construction of wind plants.

Outline Siting and Permitting a Wind Facility  Local Requirements  State Requirements  Federal Requirements A Brief Look at State Processes  General Permitting Components State Case Studies  Minnesota  Oregon  South Dakota

The Bottom Line There is usually a diverse group of stakeholders The permitting of a wind facility may fall under more than one jurisdiction While there are general guidelines, each state has its own permitting requirements Know where you are and who you need to deal with

Stakeholders Developers Landowners Utilities The Public Local, State and Federal Agencies

Seven Steps for Building a Wind Plant 1.Planning 2.Permitting 3.Financing 4.Securing power purchase & transmission agreements 5.Construction 6.Operation 7.Decommissioning

Planning Identify Locations Based On: Transmission Lines Wind Resource Political Environment Wholesale Market Conditions & Rules

Permitting – Local  Local Planning Commission  Zoning Board  City Council  County Board of Supervisors

Permitting – State  Natural Resource & Environmental Protection Agencies  Historic Preservation Office  Industrial Development & Regulation Agencies  Public Utility Commission  Siting Board

Permitting – Federal  Federal Aviation Administration  US Fish & Wildlife Service  Bureau of Land Management Programmatic EIS  Other Federal Land Management Agencies

A Brief Look at State Processes Typical Steps Required in Permitting Process 1.Notice of Intent or Preapplication 2.Official Filing 3.Application Deemed Complete 4.Hearings held by Siting Authority 5.Issuance of Draft and Final Orders

Permitting Considerations Checklist of Things to Consider Land Use Noise Birds and Bats Visual Resources Soil Erosion & Water Quality Public Health & Safety Cultural Resources Solid & Haz Wastes Air Quality

State Case Studies – Minnesota State Summary: Total MW = 615 Planned MW = Wind Energy Potential (MW) = 75,000 Rank in U.S. = 9 th Source: American Wind Energy Association, 2005.

State Case Studies – Minnesota Minn. Stat. Ann. §§116c.691 – 697 Wind Specific Permitting Requirements  Site permit required for facilities larger than 5MW  Final decision must be made within 180 days after acceptance of complete application  Included procedures for environmental review and public notification  Allows state to place conditions on turbine design and site layout

State Case Studies – Oregon State Summary: Total MW = 263 Planned MW = 75 Wind Energy Potential (MW) = 4,870 Rank in U.S. = 23 rd Source: American Wind Energy Association, 2005.

State Case Studies – Oregon Or. Rev. Stat. Ann. §  Wind facility with capacity of less than 35MW may obtain a site certificate  Copies of NOI and application sent out for comment within specified deadlines  State Energy Department notifies the applicant when application complete  Energy Facility Siting Council evaluates each application

State Case Studies – South Dakota State Summary: Total MW = Planned MW = 50 Wind Energy Potential (MW) = 117,200 Rank in U.S. = 4 th Source: American Wind Energy Association, 2005.

State Case Studies – South Dakota S.D. Codified Laws §49-41B-1 Legislative Findings  Facility may not be constructed or operated without a permit S.D. Codified Laws §49-41B-25  Decision on application must be made within 6 months  To be approved, project must meet all requirements of the chapter  Notice of decision must be given to applicant within 10 days of the decision

Things to Remember Number of stakeholders to consider Permitting may fall under a number of jurisdictions – local, state and/or federal – be aware of them all There are general rules to follow, but every state has their own way of doing things Thorough planning will help an applicant have a smoother permitting experience