STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012.

Slides:



Advertisements
Similar presentations
First Unitarian Universalist Church of San Diego Campus Renovation Project Construction Budget Options January, 2011.
Advertisements

Hot Springs Public Meeting Reconstruction of US 18 & US 385
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Photo Red Light Enforcement Program Update Public Safety Committee June 18, 2012 Item #2.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Waheed Uddin, PhD., P.E. Professor and Director, CAIT Center for Advanced Infrastructure Technology Department of Civil Engineering The University of Mississippi.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
U.S. 231 Intersection Improvement in North Spencer County Heritage Hills High School Thursday, April 30, 2015.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
UWF BOARDS STRATEGIC PLANNING JUNE 3, 2009 UWF-Facilities Development & Operations-May 2009.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Comprehensive Regional Growth Plan UPDATE November 15, 2007.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Construction Report January 19, Projects Track replacement and turf In Progress Walking tracks: Recommendation Water wells March 2010 Bleachers.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
Evaluation of Automated Camera Enforcement on Red Light Running Violations by Time into the Red Phase Nicole Oneyear and Shauna Hallmark.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Chapter 6: Intersections
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The Professional Engineer Stamp. PE Stamp Required: Optional Details Optional Procedures Optional Materials Structural Capacity Safety Results of.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
California Department of Education
All About the County Road 22 Roundabout
Secor Road Reconstruction Project Public Meeting #2
The I-465 West Leg Reconstruction Project
FOR LOCAL AGENCY FEDERAL AID PROJECTS
I-5/SR 18/SR 161 Interchange Interchange Improvements Hung Huynh
Florida Department of Transportation
Public Information Meeting NW 100th Street Reconstruction Project
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Meadow Lake Boulevard Street Extension Project
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
Michele Norton, Planner City of North Port
Western Orbital: M11 J11 Park and Ride Provision
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012

Our Team

Bloom Companies, LLC Bloom is a multi-disciplinary architecture/engineering/construction firm specializing in providing innovative and sustainable solutions for the built environment. Our engineering services include: Structural Engineering, Geotechnical Engineering, Environmental Engineering, Land Surveying Services, Site/Civil Engineering, Bridge Engineering, Transportation Engineering, Traffic Engineering, Water Resources Engineering, Value Engineering, Construction Engineering and Architecture. Our Construction services encompass: Buildings, Bridges, Infrastructure, Pile Foundations, Sheet Piling, Concrete, Carpentry, Site Work and Construction Management.

Project History ▫TIA in Aug  intersection needs improvements ▫March 31, 2011 – Selected for Master Contract project ▫Mid June 2011 work order is approved ▫Late June 2011 survey completed ▫OPM held Sept. 27, 2011 ▫30% plans completed Dec. 12, 2011  1 Signalized design  1 Roundabout design ▫PIM No. 1 on Feb. 8, 2012 ▫ICE approval on June 6, 2012  Roundabout recommended

Design process ▫Original thought presented at OPM: ▫Center the Roundabout, show historic school house impact (basis for design) ▫Was told any design involving historic properties must be feasible and leave historic property intact. ▫Slide center of intersection NE within both options ▫Multiple iterations and discussions with Ourston on Roundabout design ▫October thru early December 2011 ▫1 Signalized design and 1 Roundabout design submitted to Department and Village for comments (seen in agenda package)

Signalized Intersection 1

Roundabout Intersection 2

PIM No. 1, Feb. 8, attendees signed in

PIM No. 1 comments / themes 4 12 comment forms turned in; comments include: 1) Concern for speed on 145, mentioned roundabout could help this 2) One misunderstood roundabout to be 2 lane with need to switch lanes 3) 3 liked the roundabout idea, 1 liked safety of Roundabout 4) 7 said no roundabout, multiple mentioning lower cost of signal option (incorrect assumption) Signal = $1.9 million Roundabout = $1.4 million 5) Concerns about utility lines, trees and ability to make left out of driveway 6) Waste Mgmt – desires signal or 50% larger Roundabout 7) 1 thought – signal easier on semi’s and garbage trucks 8) 2 concerned about space required for roundabout 9) 1 said go with signal due to cost (see above #’s) Shared with stakeholders on Feb. 9, 2012 via synopsis / overview doc.

ICE Review 4 9 different areas within chart, operational analysis shown below.

ICE Review, continued 4 Signal LOS = CRoundabout LOS = B Signal Delay = 34 secondsRoundabout Delay = 14 seconds

5

Project initiation 6

Some items initiating project 7

TIA recommendations 8

Roundabouts VS Signals 9

Present design (Roundabout) Safety ▫Speed reduction through use of Chicane 1

Present design (Roundabout) Right-of-way impacts ▫Similar for both options 1

Present design (Roundabout) Access – lost with signal but not with Rdbt. 1

Village comments desired Can help better design Now or later, form provided 1

Thank You!! Any Questions? Emmanuel Yartey, PE WisDOT Project Manager Jeremy Hinds, PE Bloom Project Manager