Annual Cycle Review for Returning Participants IHE 2008-2009 Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)

Slides:



Advertisements
Similar presentations
Integrating the Healthcare Enterprise IHE Overview Keith W. Boone Interoperability Architect, GE Healthcare Co-chair, IHE Patient Care Coordination PC.
Advertisements

Profile Proposals IHE Cardiology Proposals Image Enabled Office –Grouping of actors in top half of Scheduled Workflow into Practice Management.
June - September Part II: 2010 NA Connectathon Participants Part II: What 2010 NA Connectathon Participants need to know: Connectathon.
The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,
Pathfinding Session: Device Integration IHE North America Webinar Series 2008 Todd Cooper Patient Care Device Domain Breakthrough Solutions Foundry, Inc.
Connectathon Overview IHE Workshop 2007 Chris Carr RSNA.
June 28-29, 2005IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise Cross-enterprise Document Sharing for Imaging (XDS-I) Rita Noumeir.
Connectathon Week Game Plan Lynn Felhofer Sarah Willis-Garcia.
IHE Pharmacy domain Profiles for Community and Hospital Pharmacy
January, Steve Moore Lynn Felhofer Connectathon Patient Identifiers.
September, 2005What IHE Delivers Introduction to IHE ACCA IHE Workshop 2007 Jon Elion MD, FACC Associate Professor of Medicine, Brown University Co-Chair,
Eye Care Domain Connectathon 2014: Preparation & Processes Lynn Felhofer IHE Technical Project Manager.
Connectathon 2009 What Participants Need to Know: Administrative and Logistical Details IHE North America Webinars 2008 Chris Carr RSNA.
IHE Cardiology Status November 2005 Harry Solomon Co-chair, Technical Committee.
Benefits of IHE PCD Standards-Based Interoperability June 1, 2014 | 8:30 AM Jeff McGeath – Iatric Systems, Inc. John Garguilo – NIST Monroe Pattillo –
Connectathon Preparation Steps Lynn Felhofer – IHE Technical Project Manager Sarah Willis-Garcia – IHE USA.
Connectathon Registration IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)
June-September 2009www.ihe.net IHE 2010 Educational Webinar Series Preparations for the 2010 N.A. Connectathon & HIMSS11 Interoperability Showcase
Using 3 XDS Affinity Domains at the Connectathon Prior to the 2010 European connectathon, we chose to test with one Affinity Domain, with one Patient ID.
Using 3 XDS Affinity Domains at the Connectathon Prior to the 2010 European connectathon, we chose to test with one Affinity Domain, with one Patient ID.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise Overview of IHE IT Infrastructure Patient Synchronized Applications.
Using 3 XDS Affinity Domains at the Connectathon At past North American connectathons, we chose to test with one Affinity Domain, with one Patient ID assigning.
Federal Health Architecture How to Prepare for an HIE Connectathon Adeola Odunlami, Senior Solutions Architect Health and Civilian Solutions Division 1.
Afdasfdasfd Adfasdfasfd asd Software Inventory Connectathon Manager Training Steve Moore Mallinckrodt Institute of Radiology.
Internet testing prior to the Connectathon Welcome!! Please must your line as you enter. We will have Q&A at the end.
Afdasfdasfd Adfasdfasfd asd Connectathon Timeline Connectathon Manager Training Steve Moore Mallinckrodt Institute of Radiology.
NA 2009 Connectathon Support Description of Services Provided for Connectathon Participants.
Summary Report Project Name: IHE Profiles Brief Project Description: –The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals.
1 Integrating the Healthcare Enterprise Patient Demographics Query IHE IT Technical and Planning Committee June 15 th – July 15 th Public Comment.
Integrating the Healthcare Enterprise Applying Integration Profiles: Marketing and Product Development Glen Marshall Co-Chair, IHE IT Infrastructure Planning.
IHE’s Educational Webinar Series Thank you for attending 2010 Educational Webinar Series. Dates: Every Monday & Tuesday beginning June 8, 2010 through.
IHE NA Connectathon 2015 Registration Training Presented by Sarah Willis-Garcia Coordinator, IHE USA.
What Happens at IHE Connectathon…. December 3, 2014 IHE Connectathon Overview Session for IHE SDC Testing Partners.
IHE IT Infrastructure: The Value Proposition HIMSS 2003 Joining the IHE in its New Enterprise Initiatives.
June - September Part II: 2010 NA Connectathon Participants Part II: What 2010 NA Connectathon Participants need to know: Connectathon.
IHE-Europe – Use Case Based Approach to eHealth Interoperability Peter Künecke, SIEMENS Medical Solutions IHE-Europe „vendor“ co-chair Integrating the.
Summary Report Project Name: IHE Profiles Brief Project Description: –The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals.
Summary Report Project Name: IHE Profiles Brief Project Description: –The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise HIMSS 2005 Interoperability Showcases Joyce Sensmeier MS, RN, BC,
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise Patient Identifier Cross-referencing Charles PARISOT GE Healthcare.
Data Access Framework All Hands Community Meeting March 11, 2015.
Integrating the Healthcare Enterprise (IHE) Patient Care Devices Domain (PCD) Alarm Communication Management (ACM) Opportunities Manny Furst, Technical.
IHE Update DICOM Committee Taipei, April IHE Global Update IHE Technical Framework for Year 5 V5.5 issued for public comment in February Trial.
June 28-29, 2005IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Resources to Facilitate Implementation Kevin O’Donnell Toshiba.
Overview of Pre-Connectathon Testing Lynn Felhofer – IHE NA Connectathon Manager.
Requirements for the Testing Cycle IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)
Proposed Work Item Title: Maintenance of ITI Profiles Published in 2015 and earlier Proposal Editor: Lynn Felhofer Work item “workers”: members of the.
Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve Moore Technical Project Manager (ITI, Rad)
Summary Report Project Name: IHE Profiles Brief Project Description: –The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals.
Afdasfdasfd Adfasdfasfd asd Gazelle Task 1: User Management & Registering for a connectathon Connectathon Manager Training Lynn Felhofer IHE Technical.
Summary Report Project Name: IHE Profiles Brief Project Description: –The Integrating the Healthcare Enterprise (IHE) is an initiative by healthcare professionals.
Using 3 XDS Affinity Domains at the Connectathon At past North American connectathons, we chose to test with one Affinity Domain, with one Patient ID assigning.
June-September 2009www.ihe.net North American 2010 Connectathon & Interoperability Showcase Series Paul Seifert/ Kinson Ho Solution Architects Agfa HealthCare.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Conformance: Connectathons, Integration Statements & RFPs Kevin.
June-September 2009www.ihe.net North American 2010 Connectathon & Interoperability Showcase Series WEBINAR TITLE SESSION.
Testing Process: Tools, Responsibilities, Connectathon Steve Moore Mallinckrodt Institute of Radiology.
Jonathan L. Elion MD, FACC Co-Chair, IHE Cardiology Planning Committee The Basics of IHE: Concepts and Process.
Agenda  Recruitment Pediatrician – Trinity Clinic - XDR Sanford Epic EHR – secure Epic test harness - XDR  Implementation & Testing Send EHCP by.
Structured Data Capture (SDC) All Hands Meeting May 26, 2016.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve.
Steve Moore Connectathon Preparation Steps. Intended Audience Participants doing Connectathon testing of IHE profiles and US Initiatives – First-time.
Structured Data Capture (SDC)
Connectathon Preparation for Monitors WELCOME!!!!!!!
Connectathon Patient Identifiers
Steve Moore Mallinckrodt Institute of Radiology
IHE Eye Care Process and Timeline
Connectathon Logistics
ITI Technical Committee Capacity and Timeline
Structured Data Capture (SDC)
Connectathon Patient Identifiers
Presentation transcript:

Annual Cycle Review for Returning Participants IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)

2 Audience Vendor representatives who have participated in a past Connectathon

3 The End Game North American Connectathon  February 23 – 27, 2009  Hyatt-Regency on Wacker, Chicago HIMSS 2009 Showcase  April 4 – 8, 2009  Chicago European Connectathon  April 2x - 2y, 2009  Vienna? Nice? Or …?

General Process (unchanged) Read the existing and new profiles (now) Register for Connectathon (required) Register for demonstration (optional) Interview with Project Manager (may be waived for you) Submit MESA test results (required) Submit your configuration (by system) Test and cooperate with peers during the Connectathon

This Season’s NA Timeline SepOctNovDecJanFeb Register MESA testing MESA test evaluation Config entry NA Connectathon! Interviews Jun - Aug What do we want to do? Can we do this? GoalsPeopleBudgetCommitment

What’s new? Details in other webinar sessions, but… Radiology Domain   Published for Trial Implementation in early June:   Mammography Acquisition Workflow (MAWF)   Radiology Exposure Monitoring (REM)   Updated Final Text RAD TF published June 27 Cardiology Domain   No new profiles this year   Existing profiles will be tested this season

What’s new? IT Infrastructure Domain   Public Comment begins June 6: Asynchronous XDS.b Sharing Value Sets (SVS) Pediatric Demographics Option (PDO) for PDQ Referral Requests (exchange and content) …plus several white papers   Also watch for and comment on Change Proposal (CP) Ballots   New Trial Implementation Supplements – Aug 15   Updated Final Text ITI TF published Oct 6

What’s new? Patient Care Coordination Domain   Public Comment begins June 6 : Care Management (CM) Immunization Content (IC) Cancer Registry Pathology Report Content (CPR) Antepartum Record (APR)   New Trial Implementation Supplements – Aug 15 Patient Care Devices Domain   Public Comment begins June 6 Alarm Communication Management (ACM) Point-of-Care Infusion Verification (PIV)   New Trial Implementation Supplements – Aug 15

The TF Documentation Challenge Public Comment * Supplement for Trial Implementation* Final Text* Change Proposals* Plus…  Post It notes**  Project Manager edicts** You are responsible for all * Published on: * Published on: ** Published on: 9

Finding what you need (1) Start here…  Policies and Guidelines from Sponsors  Connectathon Fact Sheet from Project Managers  Product Manager’s Summary Distilled version of the Fact Sheet –> what Product Mgrs should know Distilled version of the Fact Sheet –> what Product Mgrs should know  Connectathon Checklist Your deliverables and deadlines from now to the Connectathon Your deliverables and deadlines from now to the Connectathon  Plus, links to other resources

Finding what you need (2) Start here… …then follow technical link to Connectathon Managers’ Resource page:  Documentation for implementors (TF, WSDLs, schemas, examples…)  Test tools and documentation  Connectathon preparation tasks  …and more

12 Registration Connectathon Registration: Aug 26 – Sep 30 Read the Connectathon Policies & Fact Sheet Pay special attention to what constitutes a system and how you group actors/profiles If you do not understand the rules or the tool, contact a Project Manager before/during the registration period for clarification

13 Project Manager Interview (1) Intended for engineers attending Connectathon Interview Form  A set of questions to ensure you have the information you need to succeed Do you know what your manager signed you up for? Do you know what your manager signed you up for? Do you know how to find your required pre-Connectathon tests? Do you know how to find your required pre-Connectathon tests? Do you know where the tools are? Do you know where the tools are? …. …. completed form to Project Manager within one week of registration close

Connectathon veterans may be given a “pass” to skip the interview You’re welcome to have one if you wish Project Manager Interview (2)

Pre-Connectathon Tests Same model as previous years Results due January 16, 2009

Gazelle This year, Gazelle replaces many kudu functions as a connectathon management tool Training will be provided in the fall

17 Workshops For IHE North America (Jan 2009), there is no June Workshop. This is replaced by Webex seminars.  Informative, helpful, not a requirement For HIMSS Showcase (2009), there is a mandatory workshop in October  Davis For IHE Europe (spring 2009), there is a mandatory workshop for Connectathon participants  Poiseau

18 Lists There is one google-groups list for Connectathon-related announcements from the Project Managers and sponsors  You can subscribe yourself and as many colleagues as you wish  XDS implementors ask questions and share tips:  There will be several lists for showcase discussions  Project Managers will work with sponsors to publish a list, but we do not manage those lists.

19 You Are Responsible … There are separate webinar sessions with details from each domain. Pay attention to dates. You are responsible for all requirements for your actor/profile pairs. This is pass / fail. There is no partial credit.

20 Questions? Steve Moore: Lynn Felhofer: Eric Poiseau: