1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.

Slides:



Advertisements
Similar presentations
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
Advertisements

Central California Clean Energy Transmission Project
1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
NTTG Report to TEPPC BiennialTransmission Plan.
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
1 SCG/TEPPC November 18-19, CCPG Primary Transmission Participants.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
WECC TEPPC Meeting SWAT Update
1. SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
WV/VA issued permits Forest Service blocked line MN/WI issued permits Land owners sued AZ issued issued permit for TEP line Forest Service did not issue.
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Page 1 PCC Meeting October 25, 2007 PCC and TEPPC Coordination of Roles and Responsibilities in Regional Planning Brian Silverstein and Robert Kondziolka.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
Sea Breeze Pacific Regional Transmission System Juan de Fuca Cable & West Coast Cable Keys to West Coast Transmission Progress.
Energy Gateway Gateway West Project Gateway South Project
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Order 2004 Sensitive 1 Transmission Project Sponsors Big Tent Meeting November 19, 2008 Portland, Oregon Welcome Darrell Gerrard - PacifiCorp.
EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration.
1 FERC st Quarter Stakeholder Meeting for Transmission Planning Denver, CO March 6, :30 a.m. – 11:30 a.m.
Transmission Expansion in the Western U.S. Transmission Policy, Incentives, and Expansions in the Western States Marcus Wood Stoel Rives LLP 900 SW Fifth.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies January 24, 2008 Portland Oregon.
1 CCPG Senate Bill 100 Lamar – Front Range Presentation May 27, 2010.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
RPCG – 2026 CCTA Results and Next Steps Colby Johnson & Vijay Satyal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
CCTA Process Review TAS Update – Feb 12th 2016
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
LS Power LS Power is a power generation and transmission group
ColumbiaGrid EIM Analysis Work Group (AWG) Meeting July 5, 2011 Methodology, Results and Benefits.
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Transmission Planning Update October 20, 2010
Eleanor Ewry Base Case Coordination Subgroup Chair
SunZia Project Description
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
Planning Committee- Map
CCTA Process Review TAS Update – Feb 12th 2016
RPCG – 2026 CCTA Results and Next Steps
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Common Case Transmission Assumptions
Presentation transcript:

1

SCG Members AESO Alberta Electric System Operator BCTC British Columbia Transmission Corporation

Formed to: Foster coordination between the SPGs Assist WECC in developing its 10-year plan Ad-hoc Group Charter approved Purpose Mission Membership Voting Organization

Preparing a Foundational Transmission Project List that WECC can use a starting point for their 10-year plan. The Foundational Transmission Project List will not provide sufficient transmission additions for the 10- year time frame Need to know where new resources (supply or demand side) will be located before a complete transmission plan can be developed WECC will build on SCG foundation to meet resource policy goals and mitigate congestion WECC may also remove or change projects that are in the SCG list The SCG will also provide a list of Potential Projects that WECC can utilize to integrate resources and mitigate congestion 4

Draft Document - Ver. 4.0, May 11, 2010 CAISO CAISO02- Sunrise CAISO03- Midpoint (CA)-Devers SSPG SSPG01- SWIP SSPG03- SNIP (Phase 2) SSPG06 – TCP Harry Allen - Northwest SSPG07 – TCP Northwest – Armagosa SSPG09 – SWIP South SWAT SWAT01-PV-NG#2 SWAT06- Pinal Central – Tortolita SWAT07- Southeast Valley (SEV) SWAT08 – PV - Morgan CCPG CCPG02 – Pawnee – Smoky Hill CCPG03 – Waterton- Midway CCPG04 – San Luis Valley Hemingway NTTG01 NTTG02 Populus NTTG03 NTTG01 NTTG03 Boardman Bethel NTTG06 Townsend NTTG07 Wyoming Montana Idaho Oregon Washington Colorado Utah Nevada California Arizona New Mexico Comanche Waterton Midway Smoky Hill Pawnee CCPG02 CCPG03 CCPG04 SLV Palo Verde SWAT01 North Gila II Pinal Central Midpoint Tortolita SWAT06 Browning SWAT07 FOUNDATIONAL PROJECTS BY 2020 NTTG NTTG01 –Gateway South Phase 1 NTTG02 – Gateway Central Phase 1 NTTG03 – Gateway West Phase 1 NTTG05 – Hemingway – Boardman NTTG06 – Cascade Crossing NTTG07- Mountain States Intertie CG CG01 – I-5 Corridor CG02- West McNary CG03 - Big Eddy – Knight CG04 – Little Goose Area Reinforcement BCTC BCTC01- Nicola – Meridian BCTC03- BC-US Intertie Alberta AESO AESO L Conversion AESO04 Heartland AESO05 West HVDC AESO06 East HVDC AESO07 Fort McMurray - East Line AESO08 Fort McMurray - West Line Mona Aeolus SSPG01 Harry Allen NTTG05 Eldorado SSPG03 SSPG06 Northwest Amargosa Devers CAISO03 Imperial Peňesquitos CAISO02 SSPG07 Midpoint (CA) Morgan SWAT08 McNary John Day Sigurd Red Butte Bridger Castle Rock Troutdale CG01 CG02 Nicola Meridian BCTC01 Oquirrh Limber Terminal Coyote Spgs Legend 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations (1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing. AESO04 AESO05 AESO06 AESO03 AESO08 AESO07 Langdon Alberta Heartland Ellerslie West Brooks Genesee NTTG014 MidColumbia Ingledow Custer BCTC03 DRAFT

CAISO CAISO01- C3ET SSPG SSPG04 – Harry Allen – Mead (line #2) SSPG05 – Mead- Eldorado SSPG08- Blackhawk - Armagosa SWAT SWAT02-PV-Colo. River SWAT03- Navajo Transmission Project SWAT04- SunZia SWAT05- High Plains Express CCPG CCPG01 – WCI CCPG05 – Lamar Front Range CCPG07 – Pawnee - Daniels Park CCPG08 – Pawnee – Story Hemmingway NTTG01 Crystal Populus Windstar Captain Jack NTTG01 NTTG04 Townsend Wyoming Montana Idaho Oregon Washington Colorado Utah Nevada California Arizona New Mexico Daniels Park Missile Site Pawnee Palo Verde SWAT02 Pinal Central Midpoint Springerville POTENTIAL PROJECTS BY 2020 NTTG NTTG01 –Gateway South Phase 2 NTTG02 – Gateway Central Phase 2 NTTG03 – Gateway West Phase 2 NTTG04 – Hemingway-Captain Jack NTTG08 – Chinook NTTG09 – Zephyr NTTG10 – Overland NTTG11 – Transwest Express NTTG13 – Colstrip Upgrade CG CG05 – Juan De Fuca Cable #1 CG06 – Juan De Fuca Cable #2 CG07 – West Coast Cable BCTC BCTC02- CNC including Devils Gap Alberta ESO AESO02- Northern Lights AESO09 – Edmonton - Calgary Mona Aeolus Marketplace Amargosa CAISO01 Colo. River Buckley Sigurd Red Butte Bridger CG07 Selkirk BCTC02 LRS Wray Boone Lamar Vilas Gladstone Blackwater Corona SunZia East SunZia Midpoint Comanche Blackhawk SWAT04 SWAT05 SWAT03 Shiprock Red Mesa Moenkopi Story CCPG 07 CCPG 05 CCPG 01 CCPG 08 SSPG08 Midway Gregg BCTC02 Edmonton Calgary AESO02 NTTG03 Collinsville Eldorado NTTG08 NTTG09 NTTG10 NTTG11 Limber Terminal NTTG02 Mead Harry Allen SWAT05 (1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List. (2) Internal reinforcements projects not shown for clarity. (3) Lines shown are for illustrative purposes only and may not reflect final line routing. Draft Document - Ver. 4.0, May 11, 2010 AESO09 CG05 CG06 MidColumbia NTTG013 DRAFT Legend 500 kV Single Circuit Line 345 kV Single Circuit Line 500 kV Double Circuit Line 345 kV Double Circuit Line DC Circuit (various voltage) Termination Substations Intermediate Substations

Project Matrix Nearly Complete

Screened projects for regional significance based on voltage level All proposed 500 kV and higher projects 345 kV projects unless the project is deemed not to be a backbone facility Projects above 200 kV that are deemed to be backbone facilities Applied criteria to screened projects to assess the level of certainty of project construction 8

Must Meet at least one of the following: 1) Sponsor is required to build project to reliably serve load or to meet firm commitments for transmission service 2) Project is necessary to integrate WECC LRS Class 0 or Class 1 resources 3) Project sponsor(s) has a firm commitment to fund project construction. SCG is currently using eleven indicators, including: Are m ajor equipment orders placed? Is permitting actively underway or completed? Are there executed project participation contracts? 9

Materials available on the WECC website Go to: Committees>TEPPC>SCG>Documents, for: Approved Charter Go to: Committees>TEPPC>SCG>, for: Draft Criteria Draft Report Draft Matrix Draft Maps Final Foundational Transmission Projects List and report scheduled to be complete by the end of June 10

Overview SCG Charter Foundational Project Criteria Project List Foundational Potential Projects Maps 11

SPGs will remain active in the various WECC groups to support the development of the WECC Plan Working to synchronize SPG planning processes with each other and WECC SPGs will complete reliability analysis of the WECC Plan Planned to be initiated after WECC completes their 10-year plan Probably will be completed by the SPGs as part of their normal reliability assessment cycles 12

13