Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,

Slides:



Advertisements
Similar presentations
WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Advertisements

Testing Framework TST 15 Source: Laurent Velez, ETSI, Meeting Date: TST Testing_framework.PPT.
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
CURRENT STANDARDIZATION ACTIVITIES – ONEM2M GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_012 Source: ETSI Contact:
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
OneM2M portal introduction Group Name: Technical Plenary Source: Gerry McAuley, ETSI, Meeting Date: Agenda Item: 1.5.
Method of Converting Resource definitions into XSD Group Name: WG3 (PRO) Source: Shingo Fujimoto, FUJITSU, Meeting Date:
Discussions for oneM2M Semantics Standardization Group Name: WG5 Source: InterDigital Communications Meeting Date: Agenda Item: WI-0005 ASN/MN-CSE.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Thoughts on oneM2M resource tree Group Name: WG2 Architecture at TP#7 (Sophia, October 2013) Source: Nicolas Damour, Sierra Wireless
An Operators Input for oneM2M Baseline  Group name: TP#2/WG1  Source: DTAG, Vodafone Group  Meeting Date:  Agenda Item: WG1 agenda item.
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
M2M Abstraction & Semantics Group Name: WG5 Source: France Telecom, NEC Europe Ltd., Meeting Date: xx.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
An operator’s perspective on support for different M2M deployment scenarios AT&T Group Name: TP Source: Farooq Bari, Jianrong Wang; AT&T;
What and Why? Next steps for oneM2M Semantics Group Name: WG5 Source: Joerg Swetina, Martin Bauer (NEC) Meeting Date: Agenda Item: WI-0005 oneM2M-MAS
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
Jeju, 13 – 16 May 2013Standards for Shared ICT TIA TR-50 M2M-Smart Device Communications Dr. Jeffery Smith Chief Innovation and Technology Officer/EVP.
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Proposal for WG3 & WG5 work area split
Architectural Principles for Services Group Name: WG2- ARC Source: Tim Carey, ALU, Meeting Date: Agenda Item:
Discussion on the problem of non- Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.2.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Step by step approach Group Name: WG2 Source: Michael hs. Yang, LG uplus, Jaeseung Song, NEC Europe, Meeting.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Discussion for the next oneM2M release Group Name: TP Source: JaeSeung Song, KETI, Jaeho Kim, KETI,
3GPP Rel-13 Interworking discussions
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Realizing Ms Interface with OMA DM Group Name: MAS WG Source: Seungkyu Park, LG Meeting Date:
SE abstraction scenarios Group Name: SEC Source: Claus Dietze, Giesecke & Devrient Meeting Date: Agenda Item: WI SE abstraction.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Architectural Considerations for Semantic Support Group Name: WG5 Source: Martin Bauer (NEC), Joerg Swetina (NEC) Meeting Date: Agenda Item:
Group Name: oneM2M WG1 Requirements Source: Phil Hawkes, Rapporteur “Benefits of oneM2M technology” TR,
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
SEC #11 WG4 Status & Release 1 Outlook Group Name: Source:,, Meeting Date: Agenda Item:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Device Management Deployments In oneM2m Group Name: MAS Working Group Source: Timothy Carey, Alcatel-Lucent, Meeting Date:
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Reasons for CSF Clean-up (Issues & Next Steps) Group Name: WG2 Source: Syed Husain – NTT DOCOMO Meeting Date: (ARC_9.3) Agenda Item: 6 DOC#:
DM Collaboration – OMA & BBF: Deployment Scenarios Group Name: WG5 - MAS Source: Tim Carey, ALU, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Service Framework Proposal
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
Current standardization activities – oneM2m
TIA TR-50 M2M-Smart Device Communications
Presentation transcript:

Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU, Meeting Date: Agenda Item:

Where are we in the Mgt TR-0006? TR includes 4 Management Technologies – TR-069, OMA-DM 1.x, OMA-LWM2M, OMA-DM 2.0 – Section 5 – Descriptions have been agreed to – Section 6 – Gap Analysis have been agreed to – Section 7 – Architecture Considerations Not Started © 2012 oneM2M Partners 2

Section 7 Arch Considerations Section 7 Architecture Considerations – This section is where we give the architecture WG our opinion on how to describe/architect the management CSF within oneM2M – What value can we provide the Architecture WG in this section? Describe the deployment scenarios Describe a generic framework for the management CSF including security/authorization Define any technology specific considerations wrt to deployment scenarios and generic framework

How do we complete the work By TP#6 (Using 2 Interim meetings between TP#5-TP#6) – Write and agree to deployment scenarios (ALU) – Write and agree to generalized framework for the X, Y and Z reference points with sections Framework description (ALU) Z Reference point – example MAS R01 (ALU, LGE) X Reference Point – Consider the Application interface (?) Y Reference Point – Consider the embedded/collated framework (?) – Write technology considerations to the generalized framework (Assume - ALU, LGE, Huawei) By TP#7 (Using 2 Interim meetings between TP#6-TP#7) (October) – Agree to each technology consideration to the generalized framework

Where are we in Mgt TR-0007? Study_of_Abstraction_and_Semantics_Enablements -v document describes, collects and evaluates the state-of-art of the existing technologies on abstraction & semantics capability => 20 % complete TR includes 1 technology from ETSI – Section 5 – Introduction on Abstraction and Semantic Capability Enablement in oneM2M - empty – Section 6 – Abstraction Technologies – started Introduction to ETSI M2M Device Abstraction No work on gap analysis and Architectural Considerations – Section 7 – Technologies for Semantic M2M System – started Introduction to ETSI Semantic M2M System No work on gap analysis and Architectural Considerations – Section 8 – Conclusion - empty © 2012 oneM2M Partners 5

How do we complete the work Until now there was slow progress on the document WG 5 decided that in this release no functionality that is dedicated to Abstraction & Semantics Capability Enablement is expected. At the end of this release the TR – even if not fully completed – should be approved, documenting the achieved work. – The conclusions section should recommend that no normative work that is dedicated to Abstraction & Semantics Capability Enablement is recommended in this release Contributions to the remaining chapters are expected By TP#7 put under change control and freeze By TP#8 editorial cleanup and TP approval