System Design Design of UAV Systems Objectives

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Payload - Radius Performance Comparison. Profiles:
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Rocket Investigation D. Crowley, Rocket Investigation Your task is to investigate what affects the maximum altitude a water rocket can reach As.
POC, POD, POS Minnesota Wing Air Branch Director Course.
The Role of Software Engineering Brief overview of relationship of SE to managing DSD risks 1.
AT 209 Introduction to Civil Unmanned Aerial Systems (UAS)
Request for Proposal: Joint Strike Fighter for Australian Air Force JLFANG Black Knight 170 Aerospace Engineering Design I University of California, San.
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
Moody F061 ISE Conceptual System Design “Sets the Stage” State the problem Identify the need Conduct advanced system planning & feasibility analysis.
1 Introduction to System Engineering G. Nacouzi ME 155B.
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
Using UML, Patterns, and Java Object-Oriented Software Engineering Chapter 3, Project Organization and Communication.
Page 1 R Risk-Driven and Iterative Development. Page 2 R Copyright © 1997 by Rational Software Corporation What the Iterative Life Cycle Is Not It is.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Introduction to Network Defense
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
AE 1350 Lecture Notes #9.
Effective Methods for Software and Systems Integration
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
SynGenics Corporation 72 E Granville Road Worthington OH ©2003 SynGenics Corporation. All rights reserved. The Use.
Software Project Management
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Software Estimation and Function Point Analysis Presented by Craig Myers MBA 731 November 12, 2007.
Concepts of operation Design of UAV Systems
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Control stations Design of UAV Systems Lesson objective - to discuss
[ §3 : 1 ] 2. Life-Cycle Perspective Overview 2.1 Motivation 2.2 Waterfall Model 2.3 Requirements in Context.
Identify steps for understanding and solving the
Design of UAV Systems UAV System Design 26-1 Lesson objective - to complete the example UAV System Design Objectives Expectations - You will better understand.
17-1 Design of UAV Systems Standard atmospherec 2002 LM Corporation Lesson objective - to discuss another UAV Operating Environment The atmosphere Expectations.
AEM 5333 UAV Search and Surveillance. Mission Description Overhead surveillance and tracking – Humans on foot – Moving vehicles Onboard GPS transceiver.
Event Management & ITIL V3
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
UAV Conceptual Design Design of UAV Systems Objectives
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
Final report and briefing
Georgia Institute of Technology CS 4320 Fall 2003.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Systems Analysis and Design in a Changing World, Fourth Edition
Design of UAV Systems © 2003 LM Corporation Mid-term project Mid Term Project.
SOFTWARE PROJECT MANAGEMENT
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
1 Software Quality Engineering. 2 Quality Management Models –Tools for helping to monitor and manage the quality of software when it is under development.
AE 2350 Lecture Notes #9 May 10, 1999 We have looked at.. Airfoil aerodynamics (Chapter 8) Sources of Drag (Chapter 8, 11 and 12) –Look at the figures.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
AAE Team 1 - 2/20/07 System Requirements Review 2/20/07 Team 1 John Horst John Horst Jared Odle Jared Odle Keith Fay Keith Fay Boyce Dauby Boyce.
7 조 강창호 강애량 김창규 오혜영 최재영 이홍일 MQ-9B. 1. Goal of Project 2. Project members 3. Schedule 4. Analysis of UAS 4.1 Requirement analysis 4.2 Air vehicle.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Zuliana-July Lecture 1: INTRODUCTION AIRCRAFT MASS (WEIGHT) & PERFORMANCE By: Zuliana Ismail, 2010.
Project management. Software project management ■It is the discipline of planning, organizing and managing resources to bring about the successful completion.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Planetary Lander PDR Team Name
Mission Aircrew Course Search Planning and Coverage
Managing the Project Lifecycle
Matching of Propulsion Systems for an Aircraft
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Performance Management Training
Presentation transcript:

System Design Design of UAV Systems Objectives c 2002 LM Corporation Objectives Lesson objective - to review the concept of System Design including... What is it? How is it different from other design? Discuss related concepts Requirements Defined and Derived Performance Allocated and Status How to start the process What are the expectations? Semester student design projects Example problem Homework 4-1

System Design Design of UAV Systems Definition c 2002 LM Corporation Definition System Design Design of a complete system - example, a UAV system and all of its elements Air vehicle including Airframe Engine Avionics Software Etc. Communications Control station Payload Support system Training Logistics System Design addresses requirements and their design implementation 4-2

Requirement Design of UAV Systems Definition System Design c 2002 LM Corporation Definition Requirement What a product must or should do (i.e. the documented expectations for a design) Example - The mission system software must must employ an open system architecture or …. The average unit cost for production units 11-20 should not exceed $10 million Documents customer, program, functional and designer expectations Requirements include performance, cost, schedule and risk. 4-3

Requirements based approach Design of UAV Systems System Design c 2002 LM Corporation Another definition Requirements based approach The design of a product from the “Top-Down” - a downward looking activity From the highest level of definition to its many layers of subsystems At the top-most level - driven by customer expectations and needs Called “defined requirements” At every other level - driven by what is required to meet higher level requirements Called “derived and/or allocated requirements” This is the essence of Systems Engineering 4-4

High Altitude Endurance (HAE) UAV top-level system requirement Design of UAV Systems System Design c 2002 LM Corporation Example - defined requirement High Altitude Endurance (HAE) UAV top-level system requirement Provide effective all-weather surveillance of 40,000 square miles in 24 hours at an operating radius of 3000 nm using altitude and standoff distance to enhance survivability. 4-5

Example - design solution Design of UAV Systems System Design c 2002 LM Corporation Example - design solution This is not a very good example of a defined requirement Global Hawk’s only defined requirement was cost <$10M http://www.fas.org/irp/program/collect/global_hawk.htm 4-6

Example - derived requirements Design of UAV Systems System Design c 2002 LM Corporation Example - derived requirements Air vehicle - Operating altitude - 65,000 feet - Maximum range - 14,000 nm - Maximum endurance - 42 hours - 1 loss in 200 missions - Etc. Airframe - 25,600 lb gross takeoff weight - 9,200 lb empty weight - Cruise L/D = 33-35 Engine - Unmodified existing turbofan - Installed thrust (SLS) = 7900 lbf? - Installed thrust (65Kft) = 750 lbf?  Generator - Output power = Z http://www.fas.org/irp/program/collect/global_hawk.htm 4-7

Example - design solution Design of UAV Systems System Design c 2002 LM Corporation Example - design solution http://www.fas.org/irp/program/collect/global_hawk.htm 4-8

Other requirement types Design of UAV Systems System Design c 2002 LM Corporation Other requirement types There are two other types of requirements and they must never be confused Threshold Requirement - the minimum level of acceptable performance Goal Requirement - the maximum level of desired performance What customers are telling you when they define goals and thresholds If your design does not meet threshold levels it is unacceptable If your design exceeds goal performance you get no benefit (it is “gold plated”) 4-9

Threshold Requirement Design of UAV Systems System Design c 2002 LM Corporation Expanded definition Threshold Requirement - The lowest level of performance acceptable for of a design. If performance is below a threshold, the design must be changed. If redesign cannot solve the problem within defined cost and risk, something else has to change. Example - You are responsible for airframe design. Your customer has established a UAV threshold design mission range of 13000 miles. Your project chief systems engineer has allocated you an airframe a weight of 9,200 lbs. When performance is calculated, you discover the airframe weighs 9,200 lbs but it can only fly 12,0000 miles. Your design team has to make a design change The deficiency is in a defined requirement (range) If the deficiency were in a derived requirement (e.g. weight), you might request an increased weight allocation (which might be denied) to allow increased size. The best solution - optimize the existing design to get better performance or try different designs What you cannot do is hide the problem and hope that you can fix it later. Engineering ethics ! 4-10

Design of UAV Systems Expanded definition Goal Requirement System Design c 2002 LM Corporation Expanded definition Goal Requirement - The highest level of performance needed from a design. If a goal is exceeded, (1) the design is resized until it meets the goal or (2) the design is retained and the excess performance is turned into margin. Example - You are responsible for airframe design. Your UAV has a goal mission range of 14000 miles and an allocated airframe weight of 9,200 lbs. When performance is calculated, your team discovers it weighs 9,200 lbs but it can fly15,0000 miles. The design team (airframe, payload, support, etc.) has choices, two of which are: 1. Reduce the size of the airframe or…... 2. Hold the size and define a performance margin to cover an unexpected (but probable) future performance loss What you cannot do is to hide the excess performance from the rest of the design team to provide a private margin for unexpected airframe problems. Engineering ethics ! 4-11

Performance, cost and risk are all related. Design of UAV Systems System Design c 2002 LM Corporation Performance In this course, “performance” can mean more than technical performance (e.g. lift-to-drag ratio). It can also mean cost and risk. Performance, cost and risk are all related. An example, a UAV might meet a mission range requirement by (1) increasing wing thickness (increased fuel capacity), (2) by using expensive (but existing) advanced materials materials or (3) by developing a potentially low cost (but risky) fuel transfer system to maintain an optimum center of gravity location in flight. The designer has responsibility to address solutions across all three areas. This can only be done if the designer (and everybody else on the project) understands the requirements in all three areas - technical performance, cost and risk. 4-12

This is your design space Design of UAV Systems System Design c 2002 LM Corporation Performance types There are two types of performance and they also must never be confused Allocated performance - the level of performance desired for a design to meet overall requirements. Allocations are expressed in terms of thresholds and goals and they trace directly to requirements Status performance - the level of performance actually calculated for your design What the project is telling you when they allocate performance thresholds and goals This is your design space What the design is telling you when you get status performance This is what the laws of physics say about how your design performs Engineering ethics ! 4-13

Example - Goals vs. Status Design of UAV Systems System Design c 2002 LM Corporation Example - Goals vs. Status STATUS GOAL http://www.fas.org/irp/program/collect/global_hawk.htm 4-14

Sometimes goals change Design of UAV Systems System Design c 2002 LM Corporation Sometimes goals change International Briefing, August 1999 Endurance at 3200 nm : 24 hrs January 2001 • Performance Goals – Range: 12,500 nmi – Endurance: 35 hrs – Endurance @1200nm: 24 hrs 4-15

“Performance” measures Design of UAV Systems System Design c 2002 LM Corporation “Performance” measures Another important performance issue is to make sure our design “performance” levels meet requirements All systems, whether simple or complex, have multiple elements designed to meet multiple requirements …and which are drivers and which “fall out” Example – Thrust required for takeoff may “fall out” of thrust required to meet an acceleration requirement It is also important to identify which are most critical While it is important to monitor all “tracking performance parameters” (TPMs), the most critical or “key performance parameters” (KPPs) need focused attention and visibility Therefore, we identify a small number (5-10) of KPPs for system level attention and related sets of TPMs for attention at every other level of the system design This ensures that the entire team is focused on the most critical issues at all times and at all levels of the design 4-16

Question - What does the system design process produce? Design of UAV Systems System Design c 2002 LM Corporation System Design Product Question - What does the system design process produce? A product? A design? Something else? 4-17

Answer - DOCUMENTED TECHNICAL DECISIONS Design of UAV Systems System Design c 2002 LM Corporation System Design Product Answer - DOCUMENTED TECHNICAL DECISIONS The primary product of any design process - Everything else (including design, analysis and test) substantiates design decisions What the decisions are (drawings and text) Data to convince others that the decisions are correct (test and analysis results) Rationale behind the decisions (results of trade-off studies) Instructions on how to implement the decisions (drawings and specifications) Without good documentation, the product is useless 4-18

Expanded list Design of UAV Systems System Design c 2002 LM Corporation Expanded list System design is about more than concepts and analysis – it is also about planning (1) Design decisions (2) Documentation Requirements Defined Derived ConOps Description Effectiveness System description Physical Functional Performance substantiation Analysis Test data Design rationale/trades Figures of merit KPPs and TPMs Cost Development Production Operations & support Risk assessment Identification Mitigation Fall back planning Development plans Test & evaluation Concept/technology demonstrator Prototype Initial production Pre-planned product improvement (3) Simulation 4-19

How to start a system design Design of UAV Systems System Design c 2002 LM Corporation How to start a system design 1.Define a baseline system concept - System Engineer leads team to decide initial requirements and concepts for - System - Airframe - Payload - Mission control Support 2. Develop good initial pre-concept design Trade requirements and fully explore potential approaches 3. Cycles (1-2) repeat until concept converges ….. 4. Develop Initial Preferred System Concept - System Engineer leads functional teams in definition of initial baseline - Each team proposes their design approach - All teams discuss and reach agreement (Lesson 2c) - Individual teams define designs to appropriate level for analysis - Individual teams analyze their designs and report results - System Engineer leads effort and assesses system effects At this point, customers often define project cost, risk and schedule - The engineering supporting these estimates better be good! - We will use our parametric methods to ensure good up front decisions Customer leads - Design team supports Design team leads - Customer supports 4-20

5. Assess initial system concept design-analysis results Design of UAV Systems System Design c 2002 LM Corporation How to start (cont’d) 5. Assess initial system concept design-analysis results Led by System Engineer Allocated vs. status performance presented Some areas will be better than allocated Some areas will be worse Problems and potential solutions are discussed and documented Trade studies to improve performance are proposed and agreed Revised allocations are discussed and agreed 6. Systems Engineer documents new allocations 7. Cycles (4-6) repeat until design converges ….. (sometimes to an acceptable conclusion) 8. Upon convergence, teams evaluate other options until overall system converges to better performance. Studies continue until improvement stops or budget runs out 9. Results are documented and presented to customer 10. Team has party and many beers are consumed Design team leads - Customer supports 4-21

You should now understand the concept of system design Design of UAV Systems System Design c 2002 LM Corporation Expectations You should now understand the concept of system design 1. Design follows requirements 2. Requirements define what a system needs to do as appropriate for each design phase 3. Requirements do not document a design on an after-the-fact basis 4. Design solutions are traded to ensure that they reflect the best balance of cost, risk and performance 5. Design solutions (and performance) should not be dictated (by the boss or individual designers) Today requirements also evolve with the design Even threshold requirements are subjected to trade off studies! 4-22

Next subject - Student projects Design of UAV Systems System Design c 2002 LM Corporation Next subject - Student projects Next generation tactical UAV (TUAV) - Support army/marine type ground operations Maritime search UAV - Support navy/coast guard type operations Standoff intelligence, surveillance and reconnaissance (ISR) UAV - Global Hawk follow-on type Penetrating ISR UAV - Dark Star follow-on type Air-to-ground combat UAV (UCAV) - X45 follow-on type - You will select one of the five as a semester design project - It will also be the basis for your homework problems 4-23

Design of UAV Systems Next generation TUAV System Design  2002 LM Corporation Next generation TUAV Forward based operations from 3000 ft paved runway Provide continuous (24x7) day/night/under weather near real time ISR coverage of 100 nm x 100 nm operations area Able to resolve range of ground moving targets to 10 m anywhere within combat area and transmit detection data within 2 minutes Able to provide on-demand positive identification of friendly troops vs. opponent forces (req’d resolution = 10-20 cm) and transmit imagery to base and/or infantry units within 3 minutes of request UAV squadron is based within 70 nm of combat areas Each squadron provides simultaneous support of 10 infantry units, each operating in 10nm x 10 nm combat area Ignore survivability effects Minimum required trades Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-24

Design of UAV Systems Next generation TUAV 10 nm Combat area 70 nm System Design  2002 LM Corporation Next generation TUAV 10 nm Combat area 70 nm 100 nm 50 nm Base Area of operations 100 nm 4-25

Design of UAV Systems Maritime search UAV System Design  2002 LM Corporation Maritime search UAV Land based with 5000 foot paved runway - Squadron is based on the coast - Able to provide continuous day/night/all weather near real time search capability of 100 x 100 nm ocean surveillance area Able to launch on distress call or operate from loiter during periods of heightened alert (24 hrs day/7 days a week) Able to resolve range of 10 sqm moving targets to 10 m within surveillance area and transmit movement within 2 minutes - Able to put sensors on target anywhere within search area and transmit image within 15 minutes or less - Able to ID small boat (req’d resolution = 0.75-1.2m) and identify occupants as friendly (req’d resolution = 10-20 cm) - Ignore survivability effects Minimum required trades - Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-26

Design of UAV Systems Maritime search UAV Search area 100 nm Base System Design  2002 LM Corporation Maritime search UAV Search area 100 nm Base Loiter location(s)? 100 nm 4-27

Design of UAV Systems Stand off UAV System Design  2002 LM Corporation Stand off UAV Land based with 5000 foot paved runway Provide continuous (24x7) day/night/under weather near real time ISR coverage of 100 nm x 100 nm surveillance area Able to resolve range of ground moving targets to 10 m anywhere within surveillance area and transmit detection data within 2 minutes Able to provide on-demand positive identification of 0.5m x 0.5m targets and transmit imagery within 10 minutes UAV is based within 200 nm of combat area Ignore survivability effects Minimum required trades Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Loiter pattern and location Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-28

Design of UAV Systems Stand off UAV 100 nm Surveillance area 200 nm System Design  2002 LM Corporation Stand off UAV 100 nm Surveillance area Loiter location(s)? 200 nm 4-29

Design of UAV Systems Penetrating UAV System Design  2002 LM Corporation Penetrating UAV Land based with 5000 foot paved runway Provide continuous (24x7) day/night/under weather near real time ISR coverage of 100 nm x 100 nm surveillance area Able to resolve range of ground moving targets to 10 m anywhere within surveillance area and transmit detection data within 2 minutes Able to provide on-demand positive identification of 0.5m x 0.5m targets and transmit imagery within 20 minutes UAV is based within 200 nm of combat area Ignore survivability effects Minimum required trades Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Loiter pattern and location Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-30

Design of UAV Systems Penetrating UAV 100 nm Surveillance area System Design  2002 LM Corporation Penetrating UAV 100 nm Surveillance area Loiter location(s)? 200 nm 4-31

Design of UAV Systems Air-to-ground UCAV System Design  2002 LM Corporation Air-to-ground UCAV Land based with 5000 foot paved runway Provide continuous (24x7) day/night/under weather ground attack capability against 10 sqm ground moving targets within a 100 nm x 200 nm operating area - Able to put eight 500 lb precision guided (GPS) bombs on operator selected target within15 minutes - Able to provide operator with positive identification of 0.3m x 0.3 m resolution targets prior to weapons release UCAV is based within 200 nm of combat area Ignore survivability effects Minimum required trades Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Loiter pattern and location Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-32

Design of UAV Systems Air-to-ground UCAV 200 nm Target area 100 nm System Design  2002 LM Corporation Air-to-ground UCAV 200 nm Target area 100 nm Loiter location(s)? 200 nm 4-33

How to approach the problem How to apply design and analysis methods Design of UAV Systems System Design c 2002 LM Corporation Example problem We will use a one continuous example problem throughout the semester to demonstrate: How to approach the problem How to apply design and analysis methods First half focus: System requirements analysis - Target coverage - Time on station and response time - Sensor size and performance - Communications architecture and bandwidth - Payload type, size and performance - Manpower Second half focus: Air vehicle and design trades - Air vehicle size and configuration trades - Propulsion cycle and trades - Performance and technology - Effectiveness - Cost effectiveness and system optimization 4-34

Example - surveillance UAV Design of UAV Systems System Design c 2002 LM Corporation Example - surveillance UAV Predator follow-on type Land based with 3000 foot paved runway - Mission : provide continuous day/night/all weather, near real time, monitoring of 200 x 200 nm area - Basing : within 100 nm of surveillance area Able to resolve range of 10m sqm moving targets to 10m and transmit ground moving target (GMT) data to base in 2 minutes - Able to provide positive identification of selected 0.5m x 0.5 m ground resolved distance (GRD or “resolution”) targets within 30 minutes of detection - Ignore survivability effects Minimum required trades Communication architecture Sensor(s) required Control architecture Operating altitude(s) Time on station Loiter pattern and location Air vehicle size and numbers Air vehicle speed(s) Propulsion type and size Aspect ratio Wing Loading 4-35

Design of UAV Systems Surveillance UAV 200 nm Surveillance area 200 nm System Design c 2002 LM Corporation Surveillance UAV 200 nm Surveillance area 200 nm Loiter location(s)? 100 nm 4-36

(1) Select one of the 5 student projects Design of UAV Systems System Design c 2002 LM Corporation Homework assignment (1) Select one of the 5 student projects The one that interests you most All are of approximately equal complexity During the first half of the semester you will work as a team of one to define your overall system During the second half, you will work on (or lead) a team to define the air vehicle and optimize the system Team projects (and leads) will be based on mid-term presentations The most feasible projects will be selected for continuation (2) Send Egbert a “capability” email (1 page max) Which project you would like to work on Why you want to work on it c. What unique skills and capabilities you think you have that are applicable to the selected problem 4-37

Design of UAV Systems Intermission System Design c 2002 LM Corporation 4-38