ECMA-373 Invitation to ETSI/SCP and JTC 1/SC 06 for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/136.

Slides:



Advertisements
Similar presentations
Standards Development: An Overview
Advertisements

Electric Induction Wireless Commumication Invitation to JTC 1/SC 06 for open review For Ecmas prospective comments and dispositions to the DIS in ISO/IEC.
Protocol arrangement Slides Ecma/TC47/2012/056 (supersedes 2010/016-Rev1) TC47.
Protocol arrangement Slides Ecma/TC47/2009/070 TC47.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
The IEEE and International Standards Steve Mills July 2006 IEEE 802 Plenary.
1 Standards Development: An Overview Discovery to Delivery Topic Committee Meeting October 30, 2007 Karen A. Wetzel NISO Standards Program Manager
Rue du Rhône 114- CH-1204 Geneva - T: F: Standards for VoIP in the Enterprise By: John Elwell.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International February 2013
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma TC43: Universal 3D.
High Rate - Ultra Wide Band (UWB) Background Ecma/GA/2005/038.
Rue du Rhône CH-1204 Geneva - T: F: Safety of Electronic Equipment Safeguards to reduce.
Personal Networks and Their Federations Bernard Hammer TC32 chair Ecma/GA/2008/243.
Rue du Rhône CH-1204 Geneva - T: F: Ecma TC32-PNF From Personal Area Networks to.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Rue du Rhône 114- CH-1204 Geneva - T: F: Declaration of Environmental Product Attributes.
High Rate 60 GHz PHY, MAC and HDMI PAL Standard Invitation to ETSI BRAN, WiMedia and JTC 1/SC 06 open review For Ecmas comments and dispositions to DISs.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Product Safety Engineering TC12, May 2009 Ecma/TC12/2009/011 From: Incident-based Product-specific Construction-based Reactive To: Hazard-based Technology-independent.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Rue du Rhône 114- CH-1204 Geneva - T: F: Near field communication (NFC) Ecma/TC32-TG19/2005/013.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Close Capacitive Coupling Communication Principles and applications Ecma/TC47/2010/083 (Rev. 1 – 8 December 2010 Rev.1.1.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Protocol arrangement Slides Ecma/TC47/2010/016 (supersedes 2009/070-Rev1) (Rev. 1 – 13 Dec. 2010) TC47.
Rue du Rhône 114- CH-1204 Geneva - T: F: Ecma International TC38 Scope, Aims, Status and.
Rue du Rhône CH-1204 Geneva - T: F: NFC protocol arrangement ISO/IEC ECMA-352.
Introduction to network proxying to reduce energy consumption In Ecma International TC32-TG21TC32-TG21 Ecma/TC32-TG21/2009/047.
Introduction to TV White Spaces In Ecma International TC48-TG1TC48-TG1 Ecma/TC48-TG1/2009/017.
MAC & PHY Standard for Operation in TV White Space Invitation to JTC 1/SC 06 and CogNeA for open review For Ecmas prospective comments and dispositions.
History of Ecma Rules and Patent Policy 29 June 2011 Michael Breidthardt.
Optical Discs Ecma Golden Jubilee June 29 th, 2011 by Paul Weijenbergh.
Ecma, 50 years and beyond Josée Auber. In work programme now Scripting (ECMAScript), XML schemas (XPS, OOXML), languages (Eiffel, C#) Optical Media(CD,
Open-NFC Invitation to ETSI/SCP, JTC 1/SC 06 and NFC-Forum for open review Ecma/GA/2007/103.
ECMA-383 Kevin Fisher, Convenor Ecma TC38-TG2 Representing BSI UK Employee Intel Corp Rue du Rhône 114- CH-1204 Geneva - T: F:
Rue du Rhône 114- CH-1204 Geneva - T: F: Document Formats: Ecma Office OpenXML How Ecma.
Close Proximity Electric Induction Data Transfer Ecma/TC50/2011/005.
Doc.: IEEE /0552r1 Submission May 2014 Slide 1 IEEE WG responses to SC6 on FDIS ballots on aa/ad/ae 13 May 2014 Authors: NameCompanyPhone .
INTERNATIONAL ELECTROTECHNICAL COMMISSION How to develop an IEC standard? Shenzhen – Dennis Chew Officer-in-Charge IEC Asia-Pacific Regional.
NISO - An Introduction for New Committees. NISO History Formed in 1939 Originally known as ANSI Committee Z39 ANSI Accredited - Follows ANSI consensus.
Slide 1 IEEE 802 Response to Submission comments on IEEE 802.1AEbn 20 March 2014 Authors: NameCompanyPhone .
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
TOSCA Technical Committee Kick-off December 12, 2011.
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 20 March 2014 Authors: NameCompanyPhone .
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Slide 1 IEEE 802 Response to FDIS comments on IEEE 802.1AS 18 March 2014 Authors: NameCompanyPhone .
SC32/WG2 N0879 Proposal for WG2-level formal resolution using Bugzilla Japan National body ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/26-30.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
SC32/WG2 N889 Guideline to use Bugzilla in SC32WG2 (supersedes SC32/WG2 N0879) Bugzilla Drafting Committee SC32WG2 ISO/IEC JTC1 SC32 WG2 Toronto Meeting.
Doc.: IEEE /0456r0 Submission April 2008 Jesse Walker, Intel CorporationSlide 1 Geneva JTC1/SC6 Liaison Report Date: Authors:
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
ECMA-328 2nd edition Invitation for open review
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
WG Technical Editor’s Report
IEEE CS SAB, Mar 2009 IEEE Computer Society Category A Liaison to ISO/IEC JTC 1/SC 40: Status Report Annette Reilly IEEE Computer Society
2017 Amendments to the INCITS Organization, Policies and Procedures
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
Procedural review of initial WG ballot on P802.1CF
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE P Wireless Personal Area Network
Presentation transcript:

ECMA-373 Invitation to ETSI/SCP and JTC 1/SC 06 for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/136

Rue du Rhône CH-1204 Geneva - T: F: Open-373 review procedure overview

Rue du Rhône CH-1204 Geneva - T: F: Open-373 review procedure Invitation to help: Review ECMA-373; Solicit technical comments; Draft, review and compile dispositions until 4 January 2007 (1-month before JTC 1 s end-of-ballot). Thereafter: Ecma will issue technical comments and dispositions to ISO/IEC JTC 1 s fast track to be addressed in the Ballot Resolution Meeting. How to comment: Send (ISO/IEC formatted) comments to International.org Who: Experts from ETSI/SCP and ISO/IEC JTC 1/SC 06 who register at The International Editor coordinates.

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure Submitter Submitter: is a JTC 1 P-member or JTC 1 Class A-liaison holder is the only party that decides to submit to JTC 1s Fast-Track; not a JTC 1 decision. may submit a published standard, amendment or Technical Report may solicit advance informal comments from SCs either directly or via the JTC 1 Secretariat recommends assignment of the publication to an SC identifies an International editor

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure ITTF ITTF: Settles copyright and trademark situation; Registers the Fast-Track proposal; Includes DIS number allocation Helps assignment to an SC or JTC 1 itself; JTC 1 Secretariat assigns Starts the 30-day review period; May result in perceived contradictions that ITTF settles Starts the 5-month letter ballot; Publishes Final DIS text as ISO/IEC publication.

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure SC Upon assignment to an SC: The SC administers the new project in its work programme and maintenance list; SC Secretariat: Distributes ballot results to the SCs NBs and all voters Within two months after ballot closure Calls the ballot resolution meeting, appoints the Convener Required in case of disapprove votes and/or contentious technical comments, but not earlier than 2,5 months after ballot closure Appoints the international Editor Who drafts the (proposed and) final DIS text and (proposed and) final Disposition of Comments report within 1 month after ballot resolution meeting

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure Voting and Voters Two-staged: 30-day review period, to determine perceived contradictions; 5-month letter ballot (DIS or DAM), which is a combined voting process. Voters, one per country: all NBs of ISO may vote; all NCs of IEC may vote; all P-members JTC 1s shall vote.

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure Ballot criteria Ballot pass criteria: 1/2 of JTC 1s P-members voted (approve, disapprove or abstain) and 2/3 of JTC 1s P-member approve and Three or more approve votes per disapprove vote cast by all voters. Disapproval: On technical grounds only; Must include justification; Should include proposed fix for identified technical problem; Requires attendance of ballot resolution meeting.

Rue du Rhône CH-1204 Geneva - T: F: JTC 1 Fast-Track Procedure Ballot resolution meeting Ballot resolution meeting: SC shall call a ballot resolution meeting in case of negative votes or contentious technical comments; NO-voters must attend; To turn NO-votes into YES-votes. By approving disposition of comments; Preferably by consensus, otherwise by majority vote. NB or NC shall confirm their vote change to approve to ITTF in writing. Within one month following the meeting, the International Editor drafts: the final DIS text; and Disposition of Comments report from proposal versions (as modified and approved in the meeting).

Rue du Rhône CH-1204 Geneva - T: F: Rue du Rhône 114 CH-1204 Geneva T: F: