5-1 Collect & Interpret Data Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
CSUN Engineering Management Six Sigma Quality Engineering Week 11 Improve Phase.
Chapter 2 Minitab for Data Analysis KANCHALA SUDTACHAT.
Chapter 5 Quality Control.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Lean Six Sigma DMAIC Workshop Green Belt Part 5 6 σ Green Belt 5/10/20151Green Belt Training.
Six Sigma Quality Engineering
Excel Charts – Basic Skills Creating Charts in Excel.
Chapter 2 Minitab for Data Analysis KANCHALA SUDTACHAT.
Six Sigma Foundations Continuous Improvement Training
Chapter 10 Quality Control McGraw-Hill/Irwin
8-1 Is Process Capable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Your Catapult Team Do the following:
4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
The Quality Improvement Model
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
9-1 Improve Process Capability The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
4-1 Collect & Interpret Data The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process.
Management Quality Tools
Six Sigma Quality Engineering
Measurement of Cost Behaviour
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 9 1 Microsoft Office Excel 2003 Tutorial 9 – Data Tables and Scenario Management.
Chapter 3: The Project Management Process Groups: A Case Study
The Quality Improvement Model
3-1 Select Measures Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability.
 Individually  Given your sample of M&Ms, build a Pareto diagram by color  Before you destroy the evidence, be sure you have an accurate count.
The Quality Improvement Model
Database Software Application
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Monitoring the Project
Statistical Process Control
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
TTMG 5103 Module Techniques and Tools for problem diagnosis and improvement prior to commercialization Shiva Biradar TIM Program, Carleton University.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Overview of Total Quality Tools
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
SYSE 802 John D. McGregor Module 6 Session 1 Systems Engineering Analyses II.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 2 Descriptive Statistics: Tabular and Graphical Methods.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Project Review Questions Ops Review Project Facilitation Process Excellence.
Problem Solving.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Regression Mediation Chapter 10. Mediation Refers to a situation when the relationship between a predictor variable and outcome variable can be explained.
Project Storyboard (Page 1 of 2)
Slide 1 Copyright © 2004 Pearson Education, Inc..
ISE Operations Analysis Operations Analysis Location analysis Pareto Analysis Process Analysis Subjective Evaluation.
MEASURE : Measurement System Analysis
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 12 Multiple.
PCB Take-Aways. Take-Aways  Learn and apply systematic approach for assessing and improving process capability using such tools (Minitab and Excel) as:
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
The Scientific Method The process of solving problems.
Chapter 3: The Project Management Process Groups: A Case Study 1.
Six Sigma Greenbelt Training

Using Excel to Construct Basic Tools for Understanding Variation
WSP quality assurance tool
Microsoft Office Excel 2003
Decision Matrices Business Economics.
A basic tutorial.
DMAIC Analyze, Improve, Control
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
The Quality Improvement Model
Presentation transcript:

5-1 Collect & Interpret Data Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process Capable ? Improve Process Capability Is Process Stable ? Investigate & Fix Special Causes No Yes No Yes Collect & Interpret Data: Diagnosing Variability Purpose:Begin to understand why there is variability in data collected The Quality Improvement Model

5-2 Collect & Interpret Data What size shoe do you wear? Size 11 Shoes Why aren’t size 11’s all the same size?

5-3 Collect & Interpret Data GC CHDM Test Method Example Why don’t we get the same %Water value?

5-4 Collect & Interpret Data Cause & Effects Matrix Cause & Effect Matrix – A Tool to Identify and Quantify Sources of Variation

5-5 Collect & Interpret Data l Relates the key inputs to the key outputs (customer requirements) using the process map as the primary information source l Key outputs are scored as to importance to the customer l Key inputs are scored as to relationship to key outputs l Pareto of key inputs to evaluate in the FMEA and control plans l Input into the initial evaluation of the Process Control Plan Cause and Effects Matrix

5-6 Collect & Interpret Data l Identify key customer requirements (outputs) from process map or other sources l Rank order and assign priority factor to each Output (usually on a 1 to 10 scale) l Identify all process steps and materials (inputs) from the Process Map l Evaluate correlation of each input to each output  low score  low score : changes in the input variable (amount, quality, etc.) have small effect on output variable  high score  high score : changes in the input variable can greatly affect the output variable l Cross multiply correlation values with priority factors and sum for each input Cause & Effect Matrix Steps

5-7 Collect & Interpret Data Examples Note: Only a partial list

5-8 Collect & Interpret Data Bottle Production Example Note: Only a partial Map

5-9 Collect & Interpret Data Excel Template C&E Matrix.XLS 1. List Key Outputs Cause & Effect Matrix Form

5-10 Collect & Interpret Data 1. List Key Outputs The Outputs are defined in Step 1 of Process Mapping Bottle Production Example

5-11 Collect & Interpret Data 2. Rank Outputs as to Customer importance Cause & Effect Matrix Form

5-12 Collect & Interpret Data 2. Rank Outputs as to Customer importance Bottle Production Example

5-13 Collect & Interpret Data 3. List Key Inputs by Process Step Cause & Effect Matrix Form Note: Information obtained from process map

5-14 Collect & Interpret Data This step uses the Process Map inputs directly. Notice the Process Inputs follow the Process map step-by-step. 3. List Key Inputs by Process Step Bottle Production Example Note: Only a partial list of inputs

5-15 Collect & Interpret Data 4. Relate Inputs to Outputs Cause & Effect Matrix Form

5-16 Collect & Interpret Data l You are ready to relate the customer requirements to the process input variables l Correlational scores l Correlational scores : No more than 4 levels  0, 1, 3 and 9 l Assignment of the scoring takes the most time l To avoid this, spell out the criteria for each score: 0 0 = No correlation 1 1 = The process input only remotely affects the customer requirement 3 3 = The process input has a moderate effect on the customer requirement 9 9 = The process input has a direct and strong effect on the customer requirement Relating Inputs to Customer Requirements

5-17 Collect & Interpret Data 4. Relate Inputs to Outputs This is a subjective estimate of how influential the key inputs are on the key outputs Bottle Production Example Note: Only a partial list of inputs

5-18 Collect & Interpret Data Sum of (Rating x Correlation Score) values for all Requirements 5. Cross- multiply and prioritize Cause & Effect Matrix Form

5-19 Collect & Interpret Data 5. Cross- multiply and prioritize We now start getting a feel for which variables are most important to explaining variation in the outputs Bottle Production Example Note: Only a partial list of inputs

5-20 Collect & Interpret Data We have sorted on the cross- multiplied numbers and find that the input variables in the box above are the most important We can now evaluate the control plans for these input variables Bottle Production Example Note: Only a partial list of inputs

5-21 Collect & Interpret Data Minitab: Creating Pareto Plots Stat > Quality Tools > Pareto Chart Choose Chart defects table Enter the information as shown below Open the Minitab Worksheet C and E in the Minitab Datasets folder. Follow the commands on pages 5-21 and 5-22 to create a Pareto Chart.

5-22 Collect & Interpret Data Minitab: Creating Pareto Plots Choose Options Select Do not chart cumulative percent Hit OK twice

5-23 Collect & Interpret Data l Place the outputs across the top of the matrix and rank  Place inputs down the side of the matrix starting with the first process step and moving to the last  This approach is okay for small process with relatively few steps l Should only be used for processes with a relatively small number of steps and inputs General Approach

5-24 Collect & Interpret Data l Phase I  Place the outputs across the top of the matrix and rank  Place the process steps down the side of the matrix  Correlate process step to outputs  Pareto the process steps l Phase II  Start a new C&E Matrix with the inputs from the top three or four process steps  Recommended when first starting a project oFocuses the efforts and gives the team a feeling that they’re working on the important process steps first oGives you a running start at the FMEA and preliminary Control Plan Analysis Focused Approach

5-25 Collect & Interpret Data l Standard Operating Procedures  Do they exist?  Are they understood?  Are they being followed?  Are they current?  Is operator certification performed?  Is there a process audit schedule? Control Plan Evaluation

5-26 Collect & Interpret Data l Controllable Input Variables l Controllable Input Variables:  How are they monitored?  How often are they verified?  Are optimum target values and specifications known?  How much variation is there around the target value?  How consistent are they? l Other Questions l Other Questions:  How often is the input variable out of control?  Which input variables should have control charts? Control Plan Evaluation

5-27 Collect & Interpret Data Exercises 1.)Your Catapult Team should complete page 8 of the blue “Catapult Process” handout. 2)Copy/Paste your results into PowerPoint 3)Be ready to present your results Limit yourselves to 30 minutes for this exercise.