Project Office C-PMSE Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG c-pmse.research-project.de A research project.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission July 2003 Andy Gowans (UK RA) UK Ultra Wide Band (UWB) Compatibility Study Andy Gowans & Bharat Dudhia UK.
Advertisements

World Class Standards ETSI Media Cluster Worskhop EBU-ETSI Amsterdam,
A Radio Spectrum Policy Programme for Europe: Impact of the Digital Switchover on EU Citizens Nicola Frank Head of European Affairs Brussels, 12 January.
An Introduction to the ITU
DOCUMENT #:GSC15-GRSC8-15 FOR:Presentation SOURCE:Radio Microphone Task Force AGENDA ITEM:GRSC8 7.2 CONTACT(S):Brian Copsey, Task Force Convenor Cognitive-PMSE.
1 "Standardization : The Bridge towards Ubiquitous World" Report of GRSC5 Kohei Satoh (GRSC Chair) Rapporteur: Julian Pritchard SOURCE:GRSC Chairman TITLE:Report.
Wiesbaden 95 rev. Maastrich 02 & Chester 97 ITU-BR Information meeting on RRC-04/05, Geneva, September 2003 Overview of the special agreements concluded.
Monitoring during major events – Case studies
BOSNIA AND HERZEGOVINA DIGITAL TERRESTRIAL SWITCHOVER IN BANDS MHz AND MHz Emir Vajzović General Secretary DTT Forum Bosnia and Herzegovina.
SADC Forum on Analogue to Digital Migration Workshop What is Digital Dividend 27 – 31 August, Mozambique 2012 by Shola TAYLOR ITU Senior International.
Wiktor Sęga, Office of Electronic Communications, Poland
23/01/ ITU-R Study Group Activities Kevin Hughes Radiocommunication Bureau ITU Kevin Hughes Radiocommunication Bureau ITU.
ITU Case Studies for Serbia, Germany, Poland and Hungary Mr Peter Vari ITU Expert.
Wiktor Sęga, Office of Electronic Communications, Poland
1 Switchover from Analogue to Digital Terrestrial Television Broadcasting in Central and Eastern Europe Case Study of Poland Péter Vári Belgrade, 28th.
INTRODUCTION TO ECC PT1 July Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
RADIO FREQUENCY ASSIGNMENTS FOR WIRELESS BROADBAND Augutis Čėsna Deputy Director of Radio Communication Department Communications Regulatory Authority.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.5 – Electronic News Gathering Presenter: Andrew King on behalf of Roger Bunch.
ECC initiatives on spectrum for Programme Making and Special Events - PMSE Bruno Espinosa Deputy Director, ECO, Copenhagen.
Digital terrestrial TV and Spectrum arrangement in Viet Nam
Implementing Geolocation: enabling white space devices in the UK Prof. H Nwana 5 October 2011 TV White Spaces Spectrum in Africa Workshop.
Regulatory Evolutions in the ECC Workshop on Worldwide Perspectives in Flexible Spectrum Use Brussels, 22 October 2013.
Teletronik LTE Filter.
Soontai LTE Filter v1.0.
The need to harmonize spectrum for mobile
Elmar Zilles Head Broadcasting, Federal Network Agency, Germany Transition to Digital Broadcasting and Digital Dividend ITU Regional Seminar for Europe,
TRANSITION TO THE DIGITAL TERRESTRIAL TELEVISION BROADCASTING IN TURKEY 05 NOVEMBER 2012, BUDAPEST Information and Communication Technologies Authority.
Harmonising Spectrum for Low Power Radio Devices Bob Barron Head of Technology Sectors Unit Radiocommunications Agency.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GRSC-9 Summary Report Cindy Cook, GRSC-9 Chair, ISACC Document No: GSC16-CL-03 Source: GRSC-9 Contact:
Doc.: IEEE / wng SubmissionRoberto Aiello, Stefan MangoldSlide 1 carrier-grade operating in paired spectrum Date: Authors:
3.7) On-going activities within CEPT/ECC Thomas Weilacher Vice Chairman of CEPT/ECC Working Group FM (Frequency Management)
Jeju, 13 – 16 May 2013TBD GRSC-10 Summary Report Dr. YounKwan Kim GRSC-10 Chair, TTA Document No: GSC17-CL-32r2 Source: GRSC-10 Contact: Dr. Younkwan Kim(TTA)
Summary of GRSC-5 Meeting Kohei SATOH Vice-Chair, GRSC-6 Chair GRSC-5 DOCUMENT #:GSC13-GRSC6-13 FOR:Presentation SOURCE:GRSC-6 Vice Chair, Kohei Satoh.
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
Trends and principles in spectrum management CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
10 th International Electronic Communications Regulators Conference 8 th May 2015 Future of mobile: 4G and Beyond Eric Fournier Chairman, Electronic Communications.
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 Update on EMC Activities in ETSI GRSC (27 April – 1 May 2003) Olly Wheaton.
C-PMSE – Improving frequency utilization and coexistence for PMSE systems by cognitive procedures Project Office C-PMSE Robert Bosch GmbH | Sennheiser.
DOCUMENT #:GSC15-GRSC8-08 FOR:Presentation SOURCE:ETSI AGENDA ITEM:GRSC8 4.3 CONTACT(S):Markus Mueck, TC RRS Chair Reconfigurable Radio Systems (RRS) Presenter:
Federal Ministry of Economics and Technology, VII B 3 "Digital Broadcasting" Initiative 1 The Initiative „Digital Broadcasting“ of the German Government,
Seniorklubben af MHz Presentation to Seniorklubben af 1991 – 19 April 2012.
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 RAST 10/2-3 Generic Standards
CEPT/ECC-ETSI Co-operation Process
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
Abbreviations APT - Asia-Pacific Telecommunity ASMG - Arab Spectrum Management Group ATU – African Telecommunications Union BEM – Block Edge Mask BWA –
Spectrum harmonised for IMT
Updates on the digital dividend and UWB in the UK and Europe
EBU FORECAST November 2016 Spectrum for 5G
Reconfigurable Radio Systems (RRS)
Coexistence challenges in the UHF band
GRSC Radio Microphone Task Force Report
CEPT/ECC-ETSI Co-operation Process
State-Of-The-Art PMSE
Thomas Weilacher WG FM Chairman
TIA Update – Reconfigurable Radio Systems
Introduction to ECC PT1 February 2011.
Session 3: Major topics on Spectrum
Radio Microphone Task Force Report
CEPT ECC Vice Chairman Jaime Afonso
Broadband PPDR frequency situation in Europe
WiFi Alliance 18th October 2016 Spectrum for WiFi – ECC Actions
Werner Mohr, Siemens Networks, Munich, Germany
European 5G regulatory developments
Thomas Weilacher Chairman ECC Working Group FM
Radio Microphone Task Force Report
Cindy Cook, GRSC-9 Chair, ISACC
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory Update in Europe for Gigabit Application.
Presentation transcript:

Project Office C-PMSE Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG c-pmse.research-project.de A research project in co-operation of industry and science Publicly sponsored by C-PMSE – Improving frequency utilization and coexistence for PMSE systems by cognitive procedures

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG PMSE – Programme Making Special Event , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 2 PMSE covers Services Ancillary for Programme-Making (SAP) Services Ancillary for Broadcasting (SAB) Electronic News Gathering (ENG) and Outside Broadcasting (OB) As defined in ERC Report 38 and ERC Report 42 (see also ITU-R Report BT.2069 and ECC Report 002) including wireless production tools used for front-end solutions (audio, video, data) in the field of professional multimedia production (from radio and television to art, culture, conferences, trade fairs, entertainment applications, education, sport events and much more). Examples for PMSE Components: Video cameras Microphones In-ear monitors Conference systems Intercom devices Data links (e.g. for remote control)

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG PWMS – Professional Wireless Mikrophone Systems , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 3 PWMS is a part of PMSE and includes: All wireless equipment used at the front end of all professional audio productions, like: stage productions, public events, TV program production, installation in conference centres/rooms, city halls, musical and theatres, sport/event centres or other professional entities/ installations.

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG PWMS-related Frequency Assignment below 1 GHz , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 4 29,7 – – – – – – – 865 UHFVHF Europe Germany 0 MHz 1000 MHz TV-Broadcasting (DVB-T) 470 – 862 PMR, ENG, SAB, SAP (470 – 790) SRD ( 863 – 865) Wireless Microphones SAB/SAP LTE LTE duplex gap SAB= Services Ancillary to Broadcasting SAP = Services Ancillary to Programme-making ENG= Electronic News Gathering PMR = Private Mobile Radio SRD = Short Range Devices Professional Wireless Microphones (PWMS) 470 – 606 & 614 – 690 & until 2015

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG PWMS-related Frequency Assignment GHz , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 5 Europe Germany 1000 MHz 2000 MHz Radio Microphones Wireless Audio Mobile Applications Wireless Microphones 1785 – 1805 Wireless Microphones 1452 – 1477,5 GSM 1710 – 1780, – 1875,6 Digital Audio Broadcasting (T-DAB / S-DAB) 1452 – 1492 GSM 1710 – – 1880 Future use in Europe? In process for new allocation at ECC PT FM50

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Example: PMSE Spectrum Usage at EUROVISION SONG CONTEST 2011, Germany , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 6 TV Transmitters (DVB-T) Image: APWPT e.V. PMSE devices (microphones, in-ear monitors, talk backs, … in total approx. 140 audio links) 592 MHz534 MHz red: peak blue: mean green: minimum 6780 records, RMS RBW = 100 kHz 8 MHz

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Challenges , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 7 Spectrum Scarcity (PMSE operates mainly in MHz) Digital Dividend in Germany: PMSE lost 72 MHz of spectrum, MHz (Digital Dividend II: Under discussion for Public Safety Services) More Digital TV Transmission: DVB-T and DVB-T2 in parallel More Events, More Productions Higher Quality in Video and Audio Coexistence of PMSE with Analogue / Digital TV Transmission – with ATV since 50 years Cellular Mobil Services – since Digital Dividend, in Germany: April 2010 Other PMSE Other Short Range Devices – New kinds of TV Band Devices (ECMA-392, IEEE af) ???

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG C-PMSE Project Data Sheet , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 8 Duration: – (26 months) Budget:about 7.5 mil. (about 4.5 mil. gov. funding) Partner: Project Office:Robert Bosch (project lead) Sennheiser (consortium lead) Publicly funded by German Ministry of Economics and Technology (BMWi) Project Management Agency: German Aerospace center (DLR) beyerdynamic eesy-ID Huawei RF mondial Robert Bosch Sennheiser Institut für Rundfunktechnik University Nuremberg-Erlangen University Bochum University Hannover

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Objectives of C-PMSE Project , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 9 R&D on the cognitive system and procedures for PMSE Development of system components, like antennas, scan receiver, scan controller, cognitive engine, data base and so on. Measurement- and test procedures as well as channel-, interference- and co-existing models as reference for the standardization and regulation activities Field trial platform Setting up a field trial platform for cognitive PMSE applications at the fair grounds of Messe Berlin Technical and economical proof of concept of the cognitive methods for PMSE Realizing an open and modular R&D platform for future research Frequency regulation and standardization Setting up a forum to discuss and prioritize necessary actions concerning cognitive PMSE on national, European and worldwide level Active collaboration in meetings ITU, ETSI, CEPT und Bundesnetzagentur by using the project results and the preparatory work of the Special Task Force ETSI STF 386

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Overview Work Packages , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 10 WP4 Coexistence WP5 Radio Resource Management WP6 Information Acquisition WP7 Research Platforms WP2 Analysis, Concepts & Specifications WP 3 Standardization and Regulation WP1 Project Management

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG C-PMSE Project Phases , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 11 C-PMSE Project Preparation and Definition 6 months Preevaluation and analyis Concepts and specification Workshop System Development and Proof of Concept 16 months Development of system components System integration and proof of concept Setting up of lab and field trial platforms and demonstration Phase 1Phase 2 Standardisation and Frequency Regulation Activities

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Basic structure of lab and field trial platforms , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 12 LSPM C-PMSE CEN Radio LAN SCC SCR SCR: Scanning Receiver SCC: Scanning Controller CEN: Cognitive Engine LSPM: Local Spectrum Portfolio Management LAN: Local Area Network PMO: Performance Monitor GDB Regulation Broadcast: DVB-T/T2,... Communications: LTE, TV band devices PMSE: PWMS, IEM,... PMO

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG Overview of Current Regulation and Standardisation , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 13 PMSECognitive Radio Outside Europe ITU-R WP6 - Broadcasting service WRC-12 - AI 1.5 & 1.17 ITU-R WP5D - IMT Systems WRC-12 - AI 1.19 IEEE SCC41 WGs IEEE Wireless Coexistence Working Group IEEE Working Group on Wireless Regional Europe ECC WG FM PT45 - Digital Broadcasting Issues ECC WG FM PT48 – Spectrum aspects for Broadband Direct-Air-to-Ground Communications (DA2GC) systems ECC WG FM PT MHz L-Band ECC WG SE PT7 - Compatibility and sharing issues of MS (except IMT2000) operating below 3GHz ECC WG SE PT44 - Satellite Communications ETSI TC ERM TG17 WG3 - ERM Radio Microphones, Cordless Audio and Audio Links ETSI STF Special Task Force ETSI TC ERM EMC - Spurious Emissions of LTE in UHF band ECC WG FM PT45 - Digital Broadcasting Issues ECC WG SE PT43 - Cognitive radio systems - White spaces ( MHz) ECC WG RA PT WS_CR - White Space Cognitive Radio ECC CPG-PTA - Conference Preparatory Group A ETSI TC ERM TG17 WG3 - ERM Radio Microphones, Cordless Audio and Audio Links ETSI STF 386 – Special Task Force ETSI TC RRS 01 - System Aspects (SA) ETSI TC RRS 02 - Reconfigurable Radio Equipment Architecture (RREA) ETSI TC RRS 03 - Cognitive Management and Control (CM&C) ETSI TC RRS 04 - Public Safety (PS) Germany DKE/AK Professionelle Funkmikrofonsysteme und Veranstaltungstechnik BNetzA AK3 - IMT-Mobilfunk, Rundfunk und Cognitive Radio PMSE + Cognitive Radio

C-PMSE Project Office c-pmse.research-project.de | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG , Dr. Andreas Wilzeck, wiseSense GmbH - Uwe Beutnagel-Buchner, Robert Bosch GmbH 14 Acknowledgement The C-PMSE project is co-funded by the German Federal Ministry of Economics and Technology (BMWi)