CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

A hypothetical estimation of emission reductions in a biomass power plant project Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Tel MW Wind Farm 100X850kW Wind Turbine 9 m/s Average Wind Speed 45% capacity factor 335 GWh/year Egypt / Spain Cooperation.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Hawaii: 2020 Presented by Alex Waegel for Team Cake B.
Path to your Energy Savings Existing Residential and Small Commercial.
© OECD/IEA 2013 Annual Renewables Questionnaire Overview IEA Energy Statistics Training Paris, 4–8 March 2013 Rachael Hackney, Georgios Zazias Annual Renewables.
CD4CDMCD4CDM ABCs of Carbon Emissions Accounting May Antoniette Ajero Climate Change Information Center June 19, 2003.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Kingdom of Morocco Ministry of Land-Use Management, Water and the Environment The First Carbon Exhibition in North Africa and Middle East Region Djerba,
UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
IDMEC – IST - RGESD - Research Group on Energy and Sustainable Development CDM China – CDM Training Beijin - CHN - 26 – 30/11/2006 Hydro energy as CDM.
Aquarius Hydroelectric Project (A small-scale CDM project) Project Design Document.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Energy and Sustainability. Energy How much energy do you need? How much energy do you use?
Matilda El-Khoury, UNDP Project Manager Lebanon’s GHG Profile CDM Investors Forum UNEP-RISO, CD4CDM Project Apex-Conseil, Jerba-Tunisia, Sept 2004.
“Baselines for Small-scale CDM " Jørgen Fenhann, UNEP Risø Centre National CD4CDM workshop Casablanca January Content of the presentation: Present.
Solar Water Heating for Climate Protection: The Role for Carbon Finance Presented At: COP11 MOP 1, Montreal Canada 30 November 2005 By: Steven Kaufman.
1 Status of and Outlook for Coal Supply and Demand in the U.S. Imagine West Virginia Spring 2010 Board of Governors Meeting April 13, 2010 Scott Sitzer.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Sustainable Energy options for Northern Ireland European Studies Project.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Greenhouse Gas Emissions Data Request Form Instructions for completing the form NICSA.
Development Alternatives Baselines, Additionality & Monitoring Methodologies For Orientation Workshop on March 25-26, 2004 Udit Mathur Climate Change Centre.
Paul Scherrer Institut 5232 Villigen PSI WEC Oct. 01 / EM01/JA01 18 th World Energy Congress Round Table 6: Sustainability (Living in One World) Wednesday,
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Chapter 3 Wind Power of the world. 3.1 Development and utilization of wind energy in China  Wind power generation  Wind farm construction.
Alternative Energy Take a look at how electricity is made
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Efficiency in industry through electro-technologies Paul Baudry, EDF / R&D The future of Energy in Enlarged Europe, Warsaw 7-8th october 2004.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
Key Findings Utility & Environmental Implications Table 5b: Generation capacity mix at selected energy tax rates in year 2025 Issue 1 Energy Tax Power.
Global Energy Supply and Use. The Sun: Source of Earth’s Energy The Sun is the primary (> 99%) source of heat for the planet Direct Indirect: –Wind –Water.
El Gallo Hydroelectricity Project PDD Analysis
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
NFFO and SRO Features: - Scope limited to grid-connected electricity generation Fixed-term, fixed-price contracts offered for purchase of electricity Support.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
City Carbon Neutral CEC Financial Analysis Feb. 10, 2009.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Public Name: François Bruggemans Dept: New Business - Heating Carbon footprint of heating systems Lowering GHG emissions by the use of heat pumps.
Updated Energy Year 2011 Electricity Finnish Energy Industries
The Second Capacity Building Workshop on “Low Carbon Development and Nationally Appropriate Mitigation Actions” Alternative Policy Scenarios For Renewable.
Science A Physics – P1 Science A Physics – P1 Topic 1: Electricity Generation - 3 Topic 1: Electricity Generation - 3.
UNIT 7: POWER AND ENERGY Renewable and Nonrenewable Energy.
Pennsylvania Electric Supply GHG Forecast 1 Victoria Clark Stockholm Environment Institute - US Center 5/29/09.
CDM PROJECT OPPORTUNITIES, STATUS AND TREND IN PROJECT DEVELOPMENT IN SAMOA CARBON EXPO MELBOURNE, AUSTRALIA 7-9 NOVEMBER 2012.
Communities Renewable Energy Study
Betül Özer, Erdem Görgün, Selahattin İncecik
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
Energy Resources.
RENEWABLE ENERGY POTENTIAL OF INDIA A REVIEW
Energy Year 2017 Electricity
Highlights of the Ethiopian Energy Sector
Energy Year 2017 Electricity
Presentation transcript:

CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example

CD4CDMCD4CDM On Emissions from Power Plants: Power Generation (MWh) Emission Factor (Tons CO 2 /MWh) X = CO 2 Emissions (tons CO 2 ) = X 44g/moleCO 2 12g/moleC X 1 ton C 1 kgC TJ vol unit of fuel X kgC TJ X vol fuel consumed Mwh output conversion factors Plant based - actual data Carbon emission factor, per fuel type - IPCC Net calorific value, country specific, per fuel type - IPCC Emission Factor (Tons CO 2 /kWh) GHG = EFA X

CD4CDMCD4CDM Power Generation (MWh) Emission Factor (Tons CO 2 /MWh) X = CO 2 Emissions (tons CO 2 ) On Emissions from Power Plants : Power Generation (MWh) = Installed Capacity (MW) X Plant Capacity (%) 8760 hours in a year X On Emissions from a Power Grid : Total CO 2 Emissions (tons CO 2 ) =  t Op * P t *CEF t Emission factor for specific technology and or fuel type(tons CO 2 /MWh) Total electricity generation output of grid (MWh) Percentage contribution to grid (%)

CD4CDMCD4CDM On Emissions from a Power Grid : Total CO 2 Emissions =  t Op * P t *CEF t = Op tt P t *CEF t = Op* CEF wt.ave

CD4CDMCD4CDM

CD4CDMCD4CDM Total CO 2 Emissions = Op* CEF wt.ave

CD4CDMCD4CDM Conversion Factors 1 kiloton = 1000 tons = 1,000,000 kg 1000 tons = 1 kiloton = 1 Gigagram 1 GWh = 1000 MWh = 1,000,000 kWh 1 ton = 1000 kg = 1,000,000 g Kilo = 10 3 Mega = 10 6 Giga = 10 9

CD4CDMCD4CDM Example 1: Aquarius Hydroelectric Project Description of the project activity: Host country: Brazil generate electricity using hydroelectric resources to sell to the power grid. Hydroelectric power with 4.2 MW installed capacity = 25,755 MWh/year categorized as I-D (Renewable Energy Project - renewable electricity for a grid) baseline methodology - baseline is average of “operating margin” and “build margin” crediting period is 7 years - renewable twice

CD4CDMCD4CDM Aquarius Hydroelectric Project

CD4CDMCD4CDM

CD4CDMCD4CDM Step 1. Determine expected annual electricity production of project Step 2. Determine expected project emissions Step 3. Determine baseline emissions i) determine baseline methodology ii) compute for emission factors iii) compute for baseline emissions Step 4. Determine annual emissions reduction

CD4CDMCD4CDM Step 1. Determine expected annual electricity production of project X Plant Capacity Factor (%) Annual Plant Electricity Output (MWh/yr) = Installed Plant Capacity (MW) X Hours year X Plant Capacity Factor (%) =4.2 MW X 70% X 8760Hours year = 25,755 MWh/year Annual Plant Electricity Output how much electricity the hydropower project will deliver annually how much amount of electricity will be displaced from the grid by the hydropower

CD4CDMCD4CDM Step 2. Determine expected project emissions Power Generation (MWh/year) Emission Factor (Tons CO 2 /MWh) X = Annual CO 2 Emissions (tons CO 2 ) = 25,755 MWh/year X Zero (0) Zero project emissions = Annual CO 2 Emissions (tons CO 2 )

CD4CDMCD4CDM “approximate operating margin” - grid mix of all generating sources serving the system, excluding hydro, geothermal, wind, low-cost biomass, nuclear and solar generation “build margin” - grid mix of recent capacity additions (newly installed plants) defined as lower of most recent 20% of plants built or the 5 most recently built plants EF base = (EF operating + EF build )/2 * Baseline and Monitoring Methods Workshop on July 17 Step 3. Determine baseline emissions i) determine baseline methodology

CD4CDMCD4CDM GRID Hydro Diesel Coal Wind Geothermal Nat Gas Solar Priority Source Dispatched to Grid Sources most likely to be displaced by Project Back

CD4CDMCD4CDM ii) compute for emission factors EF = Calorific value X Carbon EF X Specific consumption X Conversion factors * page 30 of Aquarius PDD (Liter/MWh) - errata

CD4CDMCD4CDM ii) compute for emission factors operating margin - mix composed of diesel-fueled (199.3 GWh) and natural gas-fueled (420.5GWh) power plants diesel EF = kg CO 2 /kWh (32.16%) nat gas EF = kgCO 2 /kWh (67.84%) weighted EF = kgCO 2 /kWh build margin mix composed of natural gas-fueled ( GWh) and hydroelectric ( GWh) power plants nat gas EF = kgCO 2 /kWh (44.85%) hydro EF = 0 kgCO 2 /kWh (55.15%) weighted EF = kgCO 2 /kWh * Aquarius PDD typographical error - 883,008GWh

CD4CDMCD4CDM EF base = (EF operating + EF build )/2 = ( )/2 EF base = kgCO 2 /kWh ii) compute for emission factors iii) compute for baseline emissions (annual) kgCO 2 /kWh X 25,755 MWh = Annual CO 2 Emissions (tons CO 2 ) X 1000kWh 1MWh X 1tonCO kgCO 2 = 14,942 tons CO 2 Annual CO 2 Emissions (tons CO 2 )

CD4CDMCD4CDM Step 4. Determine annual emissions reduction E redn = E base - E project =14, 942 tons CO = 14,942 tons CO 2

CD4CDMCD4CDM Example 2: Burgos Wind Farm Project Description of the project activity: Host country: Philippines (Burgos, Ilocos Norte) generate electricity using wind energy to sell to the Luzon power grid. First commercial wind power with approximately 120 MW total capacity * divided into different phases - Phase 1 = 42MW installed capacity = 107GWh/year categorized as I-D (Renewable Energy Project - renewable electricity for a grid) * as per Japan External Trade Organization (JETRO) feasibility study

CD4CDMCD4CDM Example 2: Burgos Wind Farm Project Assumption: crediting period: 10 years start of crediting period: 2004 baseline methodology: fossil fuel mix of 2000 will be the same mix as crediting period constant annual emissions reduction for the entire crediting period no leakages considered, no other direct or indirect emissions covered

CD4CDMCD4CDM Annual Plant Electricity Output (MWh/yr) = Installed Plant Capacity (MW) X Hours year X Plant Capacity Factor (%) = (42 MW) x (29%) x (8760hours/year) = 107 GWh/year Step 1. Determine expected annual electricity production of project Step 2. Determine expected project emissions Power Generation (MWh/year) Emission Factor (Tons CO 2 /MWh) X = Annual CO 2 Emissions (tons CO 2 ) 107,000 GWh/year X Zero (0) = Annual CO 2 Emissions (tons CO 2 ) = Zero Project Emissions

CD4CDMCD4CDM Step 3. Determine baseline emissions i) determine baseline methodology a) operating margin and build margin average b) recent capacity additions c) power generation mix of 2000 d) projected energy mix ii) compute for emission factors - collect data on fuel consumption and power generation per fuel type to get specific consumption (volume consumed/kWh generated) Assumption: table of emission factors on next page:

CD4CDMCD4CDM ii) compute for emission factors Greenhouse Gases from Local Communities: An Inventory Manual - Page 14 Source: DOE

CD4CDMCD4CDM Final Weighted Emission Factor = kgCO 2 /kWh

CD4CDMCD4CDM iii) compute for baseline emissions (annual) kgCO 2 /kWh X 107,000 MWh = Annual CO 2 Emissions (tons CO 2 ) X 1000kWh 1MWh X 1tonCO kgCO 2 = 64,906 tonsCO 2 Step 4. Determine annual emissions reduction E redn = E base - E project =64,906 tons CO E redn =64,906 tons CO 2

CD4CDMCD4CDM If at $3 per ton CO 2 $1, 947, 180

CD4CDMCD4CDM Exercise: Wigton Wind Farm Project Description of the project activity: Host country: Jamaica generate electricity using wind energy to sell to the grid. First commercial wind power with approximately 20.7 MW capacity = 62.97Million kWh categorized as I-D (Renewable Energy Project - renewable electricity for a grid) baseline methodology - “Recent Additions to the Grid (10 years)” crediting period - 10 years

CD4CDMCD4CDM Exercise: Wigton Wind Farm Project

CD4CDMCD4CDM

CD4CDMCD4CDM Steps in computing for the emissions reduction: 1. Compute for the project activity emission. 2. Compute for the weighted carbon emission factor for baseline scenario. 3. Compute for the baseline emission. 4. Compute for the annual emissions reduction and the cumulative emission reduction for the crediting period. 5. Estimate total sales of CERs based on US$3 per ton of CO 2 for the entire crediting period.

CD4CDMCD4CDM Exercise: Wigton Wind Farm Project 1. Compute for the project activity emission. Annual Plant Electricity Output (MWh/yr) = Installed Plant Capacity (MW) X Hours year X Plant Capacity Factor (%) =20.7 MW34.7% X 8760 X = 62.97GWh =62,970MWh Power Generation (MWh/year) Emission Factor (Tons CO 2 /MWh) X = Annual CO 2 Emissions (tons CO 2 ) 62,970MWh X Zero (0) = Annual CO 2 Emissions (tons CO 2 ) = Zero Project Emissions

CD4CDMCD4CDM 2. Compute for the weighted carbon emission factor for baseline scenario. 3. Compute for the baseline emission. 4. Compute for the annual emissions reduction and the cumulative emission reduction for the crediting period. 5. Estimate total sales of CERs based on US$3 per ton of CO 2 for the entire crediting period.