Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact: 509.495.2189 1.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Roles and Responsibilities network owners system operator(s) regulators Infrastructure brokers power exchange(s) Market Places generatorsconsumerssupplierstraders.
Technical Conference Avoided Cost Modeling January 6, 2015.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
2014 Northwest Hydro Operators Forum Special Thanks To Our Sponsors: 1.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Slide 1 Harnessing Wind in China: Controlling Variability through Location and Regulation DIMACS Workshop: U.S.-China Collaborations in Computer Science.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Least Cost System Operation: Economic Dispatch 1
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Integrating Renewables Gloria Godson Energy Bar Association December 3,
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 3 Overview - EAI Generation Supply Plan Requirements for 2014 Operations.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Applications and Benefits of Energy Storage Maui, Hawaii June 16, 2010 Garth P. Corey, Consultant Sandia National Laboratories Sandia is a multiprogram.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Pj Overview of Wind Energy Grid Integration in Australia ADB Wind Energy Grid Integration Workshop Sept 23, 2013 Dr Geoff James Specialist, Renewable Energy.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Transfer Service Issues Meeting Bonneville Power Administration (BPA) “Considerations” From Exhibit A, of the 20-Year Contract OTHER ISSUES AS THEY RELATE.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
1 Demand Response: A Reliability Tool Today; A Renewable Integration Tool Tomorrow Dave Waller, VP Customer Service Hawaiian Electric Company.
Tennessee Valley Authority John J. McCormick Sr. Vice President, River Operations and Renewables.
Renewables and System Services Ann Scully.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Illinois Wholesale Market Update December 10, 2003.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
PacifiCorp and CAISO Expanding Regional Energy Partnerships
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Renewable Energy Challenges: System Stability
Wind Management at MISO
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
Grid Integration of Intermittent Resources
Flexible Forward Contracts for Renewable Energy Generators
MRES Resource Operations in SPP
MIT tour of the California ISO Control Center March 31, 2015
Mid-Continent Area Power Pool
Sandip Sharma ERCOT Manager, Operations Planning
Forecasting and Operations CAISO Case
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:

Overview  System & Resource Overview  Off system sales  Palouse Wind  IRP Planning  Future Studies 2

 2,764 megawatts, 54 turbines  Two cascading hydro systems, 8 dams  Multiple 3 rd party sales and purchases contracts Avista Balancing Authority Resource Mix (megawatts)

Flexible Resource Overview Hydro:  Noxon Rapids: AGC, load following, contingency reserves  Cabinet Gorge: load following, contingency reserves  Long Lake: load following, contingency reserves Thermal  Coyote Springs 2: load following, AGC capable  Colstrip: load following  Northeast: supplemental reserves  Rathdrum CT: supplemental reserves Contracts  Mid-Columbia: AGC, contingency reserves 4

Dynamic Capacity Sales  First in nation market based rate authority for Ancillary Services Sales (Tariff 9)  Current Sales  Provide Dynamic Capacity (imbalance services) to local PUD and aluminum rolling mill - 3 rd Party Schedule hourly product, Avista serves within hour variation  5 MW dynamic sale and spin reserves to neighboring control area  Iberdrola imbalance market  Past Sales  Up to 21 MW up and 20 MW down for 41 MW range  Up to 50 MW up and 50 MW down for 100 MW range

Palouse Wind Background  Developed by First Wind, owned by Palouse Wind LLC  30-year Purchase Power Agreement  Began Commercial Operation in December 13, 2012  105 MW ( Vestas V100 turbines)  Connected to Avista’s 230 kV Benewah-to-Shawnee Transmission Line  Expected capacity factor of 40 percent  Added to Avista’s portfolio to meet Washington State’s Energy Independence Act Flexibility Implications  Contractual rights to curtail wind output with a cost  Limit ramp ups to 10 MW per minute  Typically hold 10 MW of capacity for wind following, during high winds hold 40 MW and depend on operating reserves for high speed cutouts

Palouse Wind Output April 7 th, 2013

How Avista Met April 7 th Palouse Wind Variation

IRP Planning Avista Wind Integration Study (2007) 2013 IRP Capacity Planning  Long-term L&R balance accounts for operating reserves, regulation, and load and wind following needs  Add integration costs for variable renewable options (wind/solar)  Add integration benefits for certain resources (CTs, batteries, hydro)

Future Studies  Avista is developing operations model to optimize generation for day ahead and real-time dispatch, the model will help traders with decision making.  The model will suggest how to optimize generating units to hold reserves, set dispatch levels, make day ahead commitment decisions, and market transactions.  Patent pending hydro algorithms are used to real-time dispatch hydro facilities based on unit level engineering level representation, including operating constraints.  The model can also be used for resource planning, such as wind/solar integration costs and valuation of flexible resources (battery/LMS100).