Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.

Similar presentations


Presentation on theme: "Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power."— Presentation transcript:

1 Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power and Conservation Council Portland, OR August 21, 2008

2 July 17, 2008 2 System Flexibility Defined in Terms of Ancillary Services: Continuous Response: –Regulation –Load Following Contingency Response: –Spinning Reserve –Non-spinning Reserve –Replacement (Supplemental) Reserve Other Services: –Voltage Control –Black Start

3 July 17, 2008 3 Regulation Services: Regulation is the use of online generation that is equipped with automatic generation control (AGC) to track the moment-to-moment fluctuations in customer loads and generation –Compensates for short-term largely random fluctuations in load and generation –Automatic: Requires AGC –Response Speed: ~ 1 minute –Duration: minutes

4 July 17, 2008 4 Load Following Services: Load Following is the use of online generation to track the intra- and inter-hour changes in customer loads and generation –Compensates for larger, slower and generally predictable swings associated with the daily load cycle or wind generation ramping events –Can be manual –Response Speed: ~ 10 minutes –Duration: 10 minutes to hours

5 July 17, 2008 5 Scheduling and Load Balancing in the Pacific Northwest: Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up 0 10 20 30 40 50 60 70 80 90 -20-15-10-505101520253035404550550510 MW Previous ScheduleFinal ScheduleActual Generation

6 July 17, 2008 6 Control Area Operation: Operators focus on maintaining the net interchange with neighboring Control Areas at the final scheduled amount –Accurately measuring net load is difficult because of large number of loads and system losses –Easier to accurately measure flows on tie lines to neighboring Control Areas because of small number of lines

7 July 17, 2008 7 NERC Control Performance Standards: Impossible to perfectly match generation and load NERC has established Control Performance Standards (CPS) to determine the amount of imbalance the is permissible for reliability purposes System frequency is the fundamental indicator of Interconnection health –Frequency drops when load > generation –Frequency rises when load < generation –Target = 60 Hz

8 July 17, 2008 8 NERC Control Performance Standards: Area Control Error (ACE) is a measure of a Control Area’s contribution to Interconnection health –ACE is negative when load > generation (under-generation) –ACE is positive when load < generation (over-generation) –ACE is zero when load = generation CPS1 is an annual standard that measures the relationship between the Control Area’s ACE and the Interconnection frequency. CPS2 is a monthly standard that limits the Control Area’s maximum ACE.

9 July 17, 2008 9 Implications of NERC CPS for the Provision of Incremental System Flexibility: Load and generation volatility is important to a Control Area if it affects CPS performance and the costs of staying within NERC CPS bounds CPS compliance is Pass/Fail –Must simultaneously satisfy both CPS1 and CPS2 –Reducing ACE is of little benefit unless the reduction moves the Control Area from non-compliance to compliance CPS compliance is measured over long time frames –Good performance can offset poor performance

10 July 17, 2008 10 Does the Region Need to Augment Power System Flexibility? Continued growth of wind generation is likely to increase the need for incremental system flexibility –Typically adds generation volatility at the seconds to minutes time scale increasing the demand for regulation –Increases the frequency and sometimes the magnitude of sub- hourly and hourly ramping events increasing the demand for load following –The need to shape wind output to load over longer time scales may increase the value of some energy storage alternatives Environmental constraints are likely to continue to constrain existing hydro system flexibility –The tradeoff between system flexibility and environmental protection is not well-understood Appears to be the most significant factor

11 July 17, 2008 11 Sources of Incremental System Flexibility See: Wind Integration Action Plan – Appendix D Generation Technologies Storage Technologies Demand-side Options System Operation Options

12 July 17, 2008 12 Generation Technologies Status Flexibility Application SCCT (e.g. LM6000, LMS100)MatureReg/ LF Reciprocating EnginesMatureReg/ LF Duct Firing Added to CCCTMatureReg Capacity Added to Existing Hydro ProjectsMatureReg/ LF

13 July 17, 2008 13 Storage Technologies Status Flexibility Application Pumped Storage HydroMatureReg/ LF Batteries - ConventionalMatureReg/ LF Batteries – Flow/RedoxBetaReg/ LF Batteries - NASEarly CommercialReg/ LF Capacitors/ UltracapacitorsIn DevelopmentReg/ LF Compressed AirMature for CavernReg/ LF Plug-in Hybrid Electric VehiclesConceptual

14 July 17, 2008 14 Demand-side Options Status Flexibility Application Load Interruption RightsMatureLF Dispatchable Distributed GenerationMatureLF Dispatchable Load CyclingMatureReg/ LF

15 July 17, 2008 15 System Operation Options Status Flexibility Application AGC Added to Existing ResourcesMatureReg ACE Diversity ExchangeIn DevelopmentReg/LF Standardized Ancillary Services ContractsReg/LF Improved Wind Prediction

16 July 17, 2008 16 Discussion Points: Have we accurately characterized the system flexibility issues? Have we listed all of the major options available to increase system flexibility? How should we prioritize our investigation of the issues and options?

17 July 17, 2008 17 Scheduling and Load Balancing in the Pacific Northwest

18 July 17, 2008 18 Scheduling and Load Balancing in the Pacific Northwest Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up

19 July 17, 2008 19 Scheduling and Load Balancing in the Pacific Northwest Inter-hour Load Following Intra-hour Load Following Regulation Down Regulation Up


Download ppt "Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power."