Presentation is loading. Please wait.

Presentation is loading. Please wait.

California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.

Similar presentations


Presentation on theme: "California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman."— Presentation transcript:

1 California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman

2 California Independent System Operator PG Certification Process Overview –Contracts –ISO Metering & Energy Communication Network –Telemetry –Ancillary Services Certification –Automated Dispatching System –Certified Scheduling Coordinator

3 California Independent System Operator PG Certification Process Applicable to: –New Generators –Restarts/Repowers –“QF conversions” upon release from IOU Standard Offer contract * ISO expediting PG Certification for Summer 2001 Reliability Generation

4 California Independent System Operator PG Certification Process Execution of Contractual Agreements with the ISO –Participating Generator Agreement –Meter Service Agreement for ISO Metered Entities –http://www.caiso.com/clientserv/agreements/

5 California Independent System Operator PG Certification Process ISO Metering Installation –Metering Guidelines (http://www.caiso.com/clientserv/metering/guid elines/index.html) –Installation of ISO Specification Metering by a certified installer –Certification of meters by an independent certification company –ISO Energy Communications Network (ECN) “ExtraNet” Connectivity

6 California Independent System Operator PG Certification Process Energy Management System (EMS) Visibility – SCADA/Telemetry –Required of ALL generators 10 MW or greater –Required of generators 1 MW or greater participating ISO Ancillary Services (A/S) Markets –Telemetry Standards (http://www.caiso.com/thegrid/operations/gcp)

7 California Independent System Operator PG Certification Process Ancillary Services (A/S) Certification –Required of generators participating in ISO Operating Reserves Capacity or A/S Markets –A/S Certification Testing and Request Form (http://www.caiso.com/thegrid/operations/opsdoc/gcp) –ISO Operating Procedure G-213 - “Management of Ancillary Services Certification Testing” –Pmax, ramp rates, AGC response

8 California Independent System Operator PG Certification Process Automated Dispatch System (ADS) Connectivity –ISO “Electronic Dispatch” system (http://www.caiso.com/clientserv/ads) –Required of all “dispatchable” resources, participating in ISO Real Time (RT) Energy Market

9 California Independent System Operator PG Certification Process Select a Certified Scheduling Coordinator (SC) to Schedule Unit’s Operation within California ISO Control Area - SC schedules generator’s power flow - ISO reads meter via ECN - ISO settles grid charges with generator’s SC

10 California Independent System Operator ISO Market Services For information on the ISO Participating Generator Certification Process, please contact Client Relations at: –916-608-7059 –http://www.caiso.com/clientserv/certification/


Download ppt "California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman."

Similar presentations


Ads by Google