Kenneth J. Andrews EMP-5179-4-1 Manufacturing Systems: EMP-5179 Module #4: TQ Tools & Techniques Dr. Ken Andrews High Impact Facilitation Fall 2010.

Slides:



Advertisements
Similar presentations
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Advertisements

Chapter 8: Project Quality Management
June 2003Dr. Joan Burtner Industrial Engineering1 A Six Sigma Student Success Program Presented to:  Dr. Horace Fleming Executive Vice President and Provost.
Project Storyboard Template
Kenneth J. Andrews EMP Gen-X: Manufacturing Analysis What is the process?Build & test of AXIS machine for a specific Customer Who is the customer?MegaPower-
Total Quality Management
Control Charts for Attributes
Chapter 7 Controlling - To Ensure Results
Quality Management, Process Capability and Six Sigma MGMT 311
Chapter 10 Quality Improvement.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Chapter 8: Project Quality Management
What is Six Sigma? A goal of near perfection in meeting customer requirements A sweeping culture change effort to position a company for greater customer.
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Total Quality Management And Six Sigma
SIXSIGMA An Introduction LSSU - IAB 30 January 2002 creating value for our customers.
Quality Control and Improvement
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
“Safety is a Measure of Success”
MANAGING QUALITY SIX SIGMA SPC
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
© 2005 Wiley1 Total Quality Management Chapter 5.
Overview of Total Quality Tools
Σ Six Sigma: Process Perfection Customer Satisfaction through Error Elimination.
Introduction & Implementation of TQM Introduction & Implementation of TQM By -Fuad Al- Ruhaili -Mohammed Al-hosawi -Talal Al-Hawsawi -Mohammed Al-Otaibi.
Explain Six Sigma Simply (Football story from SSDSI) Six Sigma Simplicity.
Project Quality Management Lecture # 14 Six Sigma Ghazala Amin.
Capability Assessment Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 10 Quality Improvement.
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Introduction to Process Technology Unit 7 Principles of Quality.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
9. Applying scientific tools & techniques for improving customer satisfaction.
Introduction to Kaizen Introduction Kaizen Facilitation.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
What is it? “Six Sigma”: What is it? “A comprehensive and flexible system for achieving, sustaining and maximizing business success. Six Sigma is uniquely.
Chapter 16 Managing costs and quality
Copyright ©2005 by South-Western, a division of Thomson Learning. All rights reserved Chapter 4 1 Management’s Commitments to Quality and Productivity.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Concept Generation & Problem Solving Tools by Özlem Aydın Çivi.
PRINCIPLES OF SIX SIGMA. Six Sigma? It is a set of techniques and tools for process improvement. Introduced by engineer Bill Smith at Motorola in 1986.
8.1 Plan Quality Management
5.4 Quality Assurance Chapter 33.
Control Charts for Attributes
Chapter 11 TQM & Quality Tools.
Statistical process control
Quality Improvement: Problem Solving
OPS/571 Operations Management
Title: Owner: Ver: Date:
Quality Improvement: Problem Solving
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Quality Management Lecture 9 1/2/2019.
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
An Introduction LSSU - IAB
Six Sigma Introduction 1 1.
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Kenneth J. Andrews EMP Manufacturing Systems: EMP-5179 Module #4: TQ Tools & Techniques Dr. Ken Andrews High Impact Facilitation Fall 2010

Kenneth J. Andrews EMP EMP-5179: Module #4  Introduction to Total Quality (TQ)  Cycle-Time Reduction  Six Sigma & Defects  TQ Tools  Process Management & Improvement

Kenneth J. Andrews EMP Total Quality’s Goals Use Total Quality to create a new culture of Continuous Improvement  Never satisfied with the way things are.  Know & be driven by your Customers’ requirements.  Improve processes to exceed expectations……and improve productivity  Measure improvements over time. Deliver these goals with Teamwork.

Kenneth J. Andrews EMP Elements of TQM  Top management commitment and involvement  Customer involvement  Design products for quality  Design production processes for quality  Control production processes for quality  Developing supplier partnerships  Customer service, distribution, and installation  Building teams of empowered employees  Benchmarking and continuous improvement

Kenneth J. Andrews EMP Quality Drives the Productivity Machine  If production does it right the first time and produces products and services that are defect-free, waste is eliminated and costs are reduced.  Estimated that 20-25% of COGS in the US is spent on finding and correcting errors.  Quality management programs today are viewed by many companies as productivity improvement programs.

Kenneth J. Andrews EMP Steps to complete a task using people, equipment, and/or procedures. Material or information is changed for a specific result.  Definable  Repeatable  Measurable Outputs Inputs What is a Process?

Kenneth J. Andrews EMP Cycle time reduction:  fulfills customer expectations  increases responsiveness  reduces defects  reduces waste Through Process Simplification Defect elimination reduces: process defects product & service defects cycle time waste Cycle Time Reduction and Defect Elimination

Kenneth J. Andrews EMP Baseline Entitlement Benchmark Where you are today? How good you can get? Best in world A measure of the current performance of a process Best possible performance with current resources The world-class process, a reference for improvement World Class The Journey to Cycle Time Reduction

Kenneth J. Andrews EMP A step adds value if: The Customer recognizes the value It alters the ‘thing’ in the process It is done right the first time It is required by external law, regulation, policy.. or by health and safety considerations Defining Value-Added Work

Kenneth J. Andrews EMP The Facts: Shorter Cycle Time  Improves customer responsiveness –Delivers on-time –Meets customer needs before they change  Improves quality –Reduces opportunities for defects –Increases cycles of learning  Increases profit –Gets to market first –Uses fewer resources

Kenneth J. Andrews EMP “A comprehensive and flexible system for achieving, sustaining and maximizing business success. Six Sigma is uniquely driven by close understanding of customer needs, disciplined use of facts, data and statistical analysis, and diligent attention to managing, improving and reinventing business processes.” -- The Six Sigma Way, by Pande, Newman and Cavanaugh creating value for our customers “Six Sigma”: What is it? 

Kenneth J. Andrews EMP Sigma - the lower case Greek letter that denotes a statistical unit of measurement used to define the standard deviation of a population. It measures the variability or spread of the data.  What is Sigma?

Kenneth J. Andrews EMP The Statistical Tools of Six Sigma:

Kenneth J. Andrews EMP Cure Time of Silicone Sealant Number of Samples Lower Specification Limit (LSL) Upper Specification Limit (USL)

Kenneth J. Andrews EMP The Statistical Tools of Six Sigma:

Kenneth J. Andrews EMP PPM 100K 10K 1K Average Company Best in Class Restaurant Bills Doctor Prescription Writing Payroll Processing Order Write-up Airline Baggage Handling Domestic Airline Flight Fatality Rate Tax Advice (Phone In) Sigma Sigma as a Measurement of Defects

Kenneth J. Andrews EMP creating value for our customers Impact of Six Sigma

Kenneth J. Andrews EMP Net Result of 4 Sigma Performance  Warranty expense is unacceptably high.  Service engineers are stretched.  Sales force spends most of its time keeping Customers pacified, instead of selling more products.  Customers are dissatisfied & unhappy.  Competitors are very happy. 

Kenneth J. Andrews EMP creating value for our customers The Six Sigma Way (ISBN ) by Pande, Neuman, and Cavanaugh The Power of Six Sigma (ISBN ) by Subir Chowdhury Six Sigma (ISBN ) by Harry and Schroeder. The Six Sigma Handbook (ISBN ) by Pyzdek is more technical and becoming the 'handbook' for Black Belts. Text References

Kenneth J. Andrews EMP Run Chart Average Time or Sequence M e a s u r e Run Chart / Control Chart Average Time or Sequence M e a s u r e UCL LCL Pareto Chart Cumulative Percent abcde 0% 50% 100% Percent Contribution Sub-Problem Costs Checksheets Defect Type Wrong Form No Approval Invalid Data Not on File Defect CountSubtotal Date: 9/9/99 Account Processing Grand Total Decision Matrix Alternatives Criteria ABC Defects Cycle Time Cost Flexibility Issues / Problems / Opportunities Prioritize Map / Flow -- Implement Process Flow Analysis Current Process Proposed Process IDEAS Histogram Frequency of Defect Type of Defect to Measure (Temperature) NGT ProceduresPeople PolicyPlant 100% 80% A Effect / Problem Major Causes Minor Causes Minor Causes Root Cause Analysis Cause and Effect Diagram Ishikawa diagram Fishbone diagram CUSTOMER I Want

Kenneth J. Andrews EMP What is Root Cause Analysis?  Find the reasons for “events” or “mishaps”  Find at least one cause that can be acted upon such that it meets our goals and objectives, and is within our control  Purpose: prevent future (negative) events “Give any good supervisor or manager a description of a problem in their area and they will most likely come up with a solution. That's what is expected of them in our traditional style of management. But most problems don't have a single root-cause. That's why they remain problems.” Arthur M. Schneiderman Analog Devices

Kenneth J. Andrews EMP Most Problems ……  Have more than a single cause  Are not resolved by the most obvious (first thought) solution  Require patience to fix  Have been ‘band-aided’ many times  Are not caused by ‘bad people’

Kenneth J. Andrews EMP Productive Root-Cause Analysis: Tips  Use a mind-map format (the ‘bone’ diagram is too restrictive)  Ask “why” to generate the first level of causes  Consider prioritizing to a manageable number  Start to ‘drill down’ on the major causes (new flip-chart)  Asking a simple ‘why?’ may not be effective; consider: “Why was that a problem? “Why did that happen?” “What caused that?”  Keep asking until you reach something you can fix  Check by backtracking:”if…then?”  Capture the conclusions (clean-up & summarize)

Kenneth J. Andrews EMP Real-World Flow-Charting: How? The neat, tidy clinical way OR The practical, useful, not-so-tidy way  Involve everyone who works the process  Record what actually happens … using Post-Its  Capture ‘wait/delay’ steps  Identify ‘hot-spots’  Avoid too much detail – start with ‘big picture’  One flip-chart is never enough  Confirm by being the thing going through the process

Kenneth J. Andrews EMP Input Output Product / Services Activity Process Management  Ensures focus on Customers  Identifies Customers / Suppliers and their requirements  Creates Customer oriented measurements  Highlights non-value add work and facilitates trade offs  Improves Teamwork - Participation  Fosters Continuous Improvement of your processes

Kenneth J. Andrews EMP Process Improvement Model Continuous Improvement “As Is” “To Be” Gap Analysis Implementation Why is the change needed? What problems are being addressed? Why are those problems there today?

Kenneth J. Andrews EMP Implement & Measure Improvements Continuous Improvement “As Is” “To Be” Gap Analysis Implementation Incremental change is more sustainable: Course corrections are easier Pilot programs increase confidence.

Kenneth J. Andrews EMP Fast Track Process Improvement What process? Customer + requirements Map current process Identify hot-spots Root-cause analysis Improvements to a) fix root causes b) meet C requirements Metrics (1-3 months) Communicate plan Implement, measure, fine-tune

Kenneth J. Andrews EMP Fast Track Process Improvement 1. Clearly identify the process to be improved (start & end); communicate with up- and down-stream process managers. 2. Who is the (key) Customer – what are their requirements? 3. Map the current process (involve all stakeholders). 4. Identify “hot-spots” – maximum Perform root-cause analysis on all hot-spots. 6. Brainstorm & confirm improvements to the process (fix root-causes and satisfy Customer requirements). 7. Agree 1-3 month plan & improvement metrics (pilot?). 8. Communicate improvement plan. 9. Implement, measure, fine-tune.

Kenneth J. Andrews EMP Preparation for Next Class  Prepare an “As-Is” flowchart for Gen-X Manufacturing, identify the ‘hot-spots’ and their possible root-causes (we’ll discuss together in two weeks)  Watch for new articles/links on the website  Download material for module #5  Ideas for your term paper??