Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 SOAR Preliminary Interface.

Slides:



Advertisements
Similar presentations
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR) USP-IAG Universidade de São Paulo 18-19th June 2008 Team Management (Claudia & Keith)
Advertisements

Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 iBTF module Prototyping Version.
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 FEA Analysis Summary Version.
LBT AO Progress Meeting, Arcetri Walter Seifert (ZAH, LSW) The LBT AO System and LUCIFER 1.Requirements for the commissioning of LUCIFER:
National Research Council Canada Conseil national de recherches Canada Observing Efficiency and Reliability of Gemini South MCAO Glen Herriot Herzberg.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 BTFI Data Reduction (Keith.
FMOS Observations and Data 14 January 2004 FMOS Science Workshop.
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
PSWG March Adaptive Optics Systems Engineering on GMT Peter McGregor.

Memorandam of the discussion on FMOS observations and data kicked off by Ian Lewis Masayuki Akiyama 14 January 2004 FMOS Science Workshop.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Etalon Controller (Luiz Cavalcanti/Jean-Luc.
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Software Giseli Ramos.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
AMICA Antarctic Multiband Infrared CAmera Favio Bortoletto INAF – Osservatorio Astronomico di Padova on behalf of the AMICA collaboration Telescope and.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Generic Approaches to Model Validation Presented at Growth Model User’s Group August 10, 2005 David K. Walters.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 BTFI Optics (Keith Taylor)
OC, June 3, SAM – SOAR Adaptive Module Andrei Tokovinin Nicole van der Bliek.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
K. G. Strassmeier, Polarimetry with ELTs, Utrecht, Nov./Dec Smart Focal Plane Spectropolarimetry with the E-ELT Klaus G. Strassmeier, Leibniz-Institute.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Julian David Rodriguez Javier.
Vancouver, June Models of the ground layer and free atmosphere at some sites A. Tokovinin, CTIO Need for OTP “models”: Adaptive Optics!
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Requirements Flow-down (Keith.
The Prime Focus Imaging Spectrograph Design and Capabilities
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Institute for Astronomy Herson Bagay Mentor : Garry Nitta Advisor : Jeff Kuhn.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
Space Time Codes. 2 Attenuation in Wireless Channels Path loss: Signals attenuate due to distance Shadowing loss : absorption of radio waves by scattering.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Fernando Luís Fontes Emulator.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
Application of a Charge Transfer Model to Space Telescope Data Paul Bristow Dec’03
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
This has been created by QA InfoTech. Choose QA InfoTech as your Automated testing partner. Visit for more information.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Digital Light Sources First introduced in 2001.
SOAR Data Reduction Pipelines
Jay Elias1 1plus bits plagiarized from Steve Heathcote and others
TEMPO Instrument Update
Alistair Walker Version 3 December
KOSMOS Design Considerations
USP-IAG Universidade de São Paulo
HERD Tracker Layout Considerations
High Throughput Route Selection in Multi-Rate Ad Hoc Wireless Networks
FourStar 4K x 4K JHK imager
USP-IAG Universidade de São Paulo
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 SOAR Preliminary Interface Review SOAR/CTIO) (Keith Taylor) Version 1.0

Rene Laporte & SOAR (12 th - 14 th May, 2008) Management – Steve Heathcote – Brooke Gregory – Andrei Tokovinin Electronics – Ricardo Schmidt – Manuel Martinez – Esteban Parkes Software – Marco Bonati – German Schumcaher Mechancial – Patricio Schurter – Eduardo Serrano Optical – Roberto Tighe

The Big Picture SAM development time-scales: – Natural guide-star (NGS) operations: Sep’09 – Laser guide-star (LGS) operations: ~Sep’10 (tbc ) Consequences … – The predicted delivery of BTFI ~ SAM in NGS mode; – SAM in NGS mode not common-user -- development path to full LGS ops; – BTFI science limited by the small sky coverage offered by SAM in NGS mode; – The development time-scales for AO systems are notoriously difficult to predict Conclusions: – IBTF on IR-Direct ISB port for first 1 or 2 years of ops Fixed, stable configuration - what about Phoenix? No problems with CryoTiger cooling line swaps – Commissioning of SAM & BTFI independent – minimize interference of commission teams Worries: – BTFI’s major science impact is with GLAO

Optimal Instrument Configuration for SAM (BTFI advantages over SAMI) iBTF mode allows for continuously variable filtered imaging as opposed to SAMI’s limited set of interference and B-B filters; iBTF gives 5 > R > 5,000 cf: SAMI where R <500 range with a semi-infinite no. of filters; iBTF’s wavelength PSF is ~Gaussian profile; SAMI is ill- defined and limited to current interference filter set; iBTF allows observations of arbitrary red-shifts and rest-frame wavelengths without the need for new interference filters; BTFI has two complementary outputs giving (eg) matched pairs of line/continuum observations with the same PSF and  ; BTFI uses EMCCDs which allow for optimum use of variable GLAO PSF thus maximizing benefit of SAM’s performance.

Optimal Instrument Configuration for SAM (BTFI disadvantages over SAMI) SAMI is a simple camera with 12-position filters in a simple filter wheel. BTFI can only support a <8. SAMI is operationally simpler than BTFI. SAMI has no optics and hence will have a superior efficiency to the iBTF mode of BTFI. BTFI suffers an efficiency loss averaging around ~20%. However it has 2 channels and hence more than recovers from any losses in its optical train. Conclusions (personal) BTFI is better than SAMI in almost all respects BTFI is highly complementary to SIFS, so SIFS+BTFI should be a winning combination for SAM.

SAM/GLAO issues: SAM’s PSF is highly variable: – by factors >>2 – in time-scales of a few minutes or shorter EMCCD on BTFI allows time-resolution of ~2s – Select frames of good PSF for incorporation into data-cube in pipe-line data reduction? – Avoids averaging PSF over integration time multiple sweeps using EMCCD – Much superior to convolving to worst PSF single sweep using conventional CCD output

Weight / Moment constraints Pre-PDR: – BTFI alone, assuming SAM as a rigid body done - see Santoro’s report Post-PDR: – SAM alone, with loads representing BTFI and SIFS; – SAM plus BTFI as an integrated unit With SIFS as a load Final ratification by SOAR Board

Seeing measures (Tokovinin)

Detector Cooling System (LN 2 -vs- CryoTiger) Initial motivation for visit to SOAR - visits to CTIO labs, Telescope, LCO offices. CTIO labs: – Example LN 2 dewars (weight/size/hold-time issues) – Notional solution using LN 2 semi-autofill with reasonable sized dewars SOAR Telescope: – Goodman S’graph CryoTiger cooling line routing – Static config - cf: BTFI swaps between SAM and IR-Direct port LCO offices (with David Osip): – Frequent IMAX camera swaps – connectors a problem but not insurmountable – Lots of great advice – including stand-offs at detector (see next slide) Summary: – No strong arguments either way (both feasible) – Decision to base-line CryoTigers for size/weight/(maintenance) reasons PDR

Backend of IMAX (LCO)

Other interface issues Calibration unit is readily adapted to supply fibre feeds to BTFI (as well as large-field illumination); – Flexure in BTFI is monitored semi-continuously, – Flexure in SAM will have to be measured and open-loop corrected SAM/BTFI mechanical interface resolved ISB port/BTFI mechanical interface - no obvious problems BTFI mounted on SAM interferes with Nasmyth support truss in similar way as SAM itself; – Problem resolved in principle but needs Patricio to follow through Electronics cabling clarified Handling requirements discussed Control system architecture agreed (Bonati – see Giseli’s talk) Support for CCCP-v2 & Etalon Controllers – Training and spares Outstanding GLAO questions for Andrei