Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
CDOT WATER QUALITY PROGRAM
Designing More Contractor- Friendly Storm Water Pollution Prevention Plans April 6, 2005 Joan M. Meitl.
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Future of the Construction and Post Construction Water Quality Program
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Field Application Training for Erosion and Sediment Control BMPs on Caltrans Construction Sites.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Stormwater Quality Enhancement
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Applying for the VT Multi-Sector General Permit
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
Christine Krall, SW Region Environmental Winter 2015.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Introduction Soil erosion research is a capital-intensive and time-consuming activity. However, the advent of computer technology leads to a new approach.
Module II Soil Stabilization (SS) and Sediment Control (SC) BMPs
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Welcome to training on Best Management Practices for Erosion and Sediment Control.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Level IB: Advanced Fundamentals Seminar
Construction Site Best Management Practices and the Project Design Process.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Estimating Soil Erosion From Water Using RUSLE By: Andrea King USDA-Natural Resource Conservation Service.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Low Impact Development (LID)
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
San Rafael, California November 12, 2015
Stormwater Permits Review for WMAC – June 2009 Angus Eaton NYSDEC Division of Water.
Part 5 - Good Housekeeping
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
Iowa BMPs for soil erosion prevention. BMP context BMPs needed for managed land (duh!) Strategies differ by land- use – Ag/crops (>71%) +/- CRP, etc –
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Storm Water Pollution Prevention Plan Development
Nutrient Abatement Erosion and sediment control and urban stormwater program and Flexible options for nutrient management – point source. Sandra Avendano,
Soil Erodibility Prof. Dr. EHSANULLAH. Soil Erodibility Prof. Dr. EHSANULLAH.
EPA Public Meeting Dallas, Texas May 10, 2005
INDOT Storm Water Management
Presentation transcript:

Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and Grade Review Erosion and Sediment Control Plan Sheets for Plan-in-Hand Erosion and Sediment Control Plan Sheets for Plan-in-Hand Finalization of Preliminary NOI Package and Other Applicable Permitting Documents Finalization of Preliminary NOI Package and Other Applicable Permitting Documents Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets) Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets) Plan-in-Hand Review Finalization of Erosion and Control Plan Sheets Reference Manual Page 187

n Integrate BMPs into the Design Process n Identify Design Tools for BMP Selection Learning Objectives

Erosion and Sediment Control MDT Design Process n Consider BMPs early in the design process n Design process outcome should be completed NOI package and SWPPP

Preliminary Field Review n On-site n Field scoping n Identification of issues n Integration of BMP considerations

Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package n Vicinity map n Delineation of potential erosion and sedimentation areas n Preliminary soil investigation n Generate erosion and sediment control schedule n Identification of existing control practices n Prepare preliminary NOI package (NOI form and SWPP)

Alignment and Grade Review n Incorporate preliminary erosion and sediment control design n Incorporate preliminary NOI and SWPPP

Erosion and Sediment Control Plan Sheets for Plan-in-Hand n Select BMPs that best apply to the reduction of erosion and sedimentation n Incorporate geotechnical information into preliminary plans n Identify existing stormwater control measures

Erosion and Sediment Control Plan Sheets for Plan-in-Hand (cont.) n Revise preliminary erosion and sediment control plans n Revise preliminary NOI package and SWPPP n Identify additional stormwater permits necessary n Prepare preliminary erosion and sediment construction schedule

Plan-in-Hand n Incorporate revised preliminary erosion and sediment control design. n Incorporate revised preliminary NOI and SWPPP n Additional stormwater permitting documents

Finalization of Erosion and Sediment Control Plan Sheets n Incorporate revisions from plan-in-hand n Incorporate final revision from other sections

Finalization of Preliminary NOI Package and Other Applicable Permitting Documents n Finalize preliminary NOI n Finalize preliminary SWPPP n Finalize additional stormwater permitting documents n Revise preliminary erosion and sediment control construction schedule

Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets) n Incorporate erosion and sediment control plans into construction plans package n Incorporate NOI and SWPPP into construction package

Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and Grade Review Erosion and Sediment Control Plan Sheets for Plan-in-Hand Finalization of Preliminary NOI Package and Other Applicable Permitting Documents Finalization of Preliminary NOI Package and Other Applicable Permitting Documents Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets) Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets) Plan-in-Hand Review Finalization of Erosion and Control Plan Sheets Reference Manual Page 187

Erosion and Sediment Control Design Tools n BMP Selection Guideline n Rules of Thumb n NOI Package Tools n BMP Unit Cost Rate Schedule (Appendix A of the Reference Manual)

Erosion and Sediment Control Design Process Identify site specific erosion concerns n Assess if erosion is likely to occur at the site

BMP Selection Guidelines Erosion by Water Reference Manual Page 193

BMP Selection Guidelines Available computer model RUSLE Model used to estimate average annual soils loss BMP selection guidelines design tools A=RKLSCP

BMP Selection Criteria n Identify type of erosion that could occur n Use the BMP selection guideline table in the Erosion and Sediment Control BMP manual (page 196 in the Reference Manual) n Select appropriate BMPs for the construction site

BMP Selection Criteria Example from Table of the BMP Manual (page 196)

BMP Selection Criteria n Use a “toolbox approach” for selection of BMPs for each site n Use multiple BMPs in conjunction with each other to create an integrated design n Integrate surface stabilization with sediment control BMPs

BMP Vegetation Considerations n Protect existing vegetation whenever possible n Phase vegetation disturbing activities to minimize duration of exposed soil

BMP Selection Considerations Snowmelt vs. Intense Rainfall

RAIN vs SNOW EAST vs WEST.html Weather Impacts

Western vs. Eastern Montana Western Montana n Extensive snowmelt runoff n inches of precipitation per year Eastern Montana n Rainfall events can produce significant runoff n inches of precipitation per year

n Unprotected cut slope n Significant erosion n Significant off site sedimentation Case Study

Possible Implementations n SS-9 along top of slope n SS-3, 6, 7, 8, 12, 13, or 15 on slope n SC-5 or 6 on slope n SC-4, 6 or 11 in ditch n SC-2 or 3 at outfall Case Study Conclusion

Erosion and Sediment Control Rules of Thumb n Slope measurement tables (Page 199 in Reference Manual) n Slope inclination conversion tables (Page 200 in Reference Manual) n Seed application rate tables (Found on detailed drawings for SS4 and SS15)

Erosion and Sediment Control Design Process NOI Package Tools n Reference Manual contains NOI form, SWPPP form, NOT form n Instructions for completing forms provided

n BMP selection is required during the Design Process n Design Tools are available in the Reference Manual n BMP Selection Criteria are provided n NOI Forms and instructions are included in the Reference Manual Conclusion

Questions and Discussion