1 Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record Keeping NOT Submittal

2 Learning Objectives n Identify activities occurring after completion of construction n Identify maintenance responsibilities n Identify record keeping requirements

3 Post-Construction BMP Maintenance n MDT responsibility (primary) n Contractor responsibility (very limited) n Regulatory Agency responsibility (compliance)

4 BMP Monitoring n Water quality monitoring (can occur under special circumstances) n Hydraulic evaluation (required to ensure performance) n Timeframe  Weekly  Prior to predicted storm event  Soon after storm event (0.5 inches)

5 Water Quality Monitoring n Only under special circumstances n Urban setting n Influent and effluent concentration monitoring n Treatment BMPs n In mine waste areas n When contaminated soils are present

6 Hydraulic Evaluation n Evaluate field performance of BMPs n Determine if BMP can sustain additional storm events n Evaluate downstream areas for impact

7 BMP Maintenance n Frequent and periodic cleanout of accumulated sediment n Replacement of deteriorated BMP materials

8 BMP Maintenance (cont.) n Access to BMPs needs to be maintained n Wintertime maintenance required

9 BMP Reporting and Record Keeping n Form submitted to MDT Environmental Services Bureau n MDT will create a database

10 Temporary BMP Removal After Stabilization

11 Notice of Termination (NOT) n NOT form located in Appendix G of the Reference Manual n NOT form requires signature certifying that “final stabilization” has been achieved n NOT submitted to DEQ

12 Erosion and Sediment Control Post-Construction Phase Tools n Checklists are provided in BMP Manual

13 Project Location BMP Post-Construction and Monitoring Schedule Post-Construction Monitoring Schedule

14 Monitoring/Maintenance Checklist

15 Monitoring Report Form Project Location BMP Monitoring Report Form

16 BMP Maintenance Record Project Location BMP Maintenance Report Form

17 BMP Removal Checklist

18 Conclusions n Monitoring of BMPs by MDT is required n Maintenance of BMPs by MDT is required n Record keeping is required n After final stabilization has been achieved, a Notice of Termination (NOT) is submitted to DEQ

19 Discussion and Questions

20 You have completed training on MDT’s new Erosion and Sediment Control Best Management Practices Manual Thank you for your participation in today’s course.


Download ppt "Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record."

Similar presentations


Ads by Google