Tysons May 8, 2012 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Corner.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion (Continued) Board Transportation Committee February 14, 2012.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
County of Fairfax, Virginia Department of Transportation Transportation Funding Alternatives and Outreach Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Department of Transportation R esidential T raffic A dministration P rogram Traffic Calming Program Status July 20, 2010.
Prince William County Government Prince William County Department of Transportation Road Program DATA June 23, 2010.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Silver Line Rail Project Update
Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Tysons 1 Tysons Corner Interim Metro Parking December 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Construction Impacts Overview of Policy Changes Shuttle Changes Enforcement Faculty/Staff Changes Visitor & Event Parking Changes Resident Student Changes.
BB|DD: Bubbly Bright Daring Dark Fashion Promotion Campaign.
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
June 20, 2013 CSSC Transportation Update. APG Traffic Counts Tuesday (2/26/13)Wednesday (2/27/13)Thursday (2/28/13) 6:00 – 7:00 AM :00 –
Insert the title of your presentation here Presented by Name Here Job Title - Date A reduction in fatal casualties Who, why and what does this mean? Louise.
PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.
Douglas Biesecker NOAA/Space Environment Center Chair of Solar Cycle 24 Prediction Panel.
Operating Systems Operating Systems - Winter 2012 Dr. Melanie Rieback Design and Implementation.
© 2012 National Heart Foundation of Australia. Slide 2.
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Current Construction Projects Major Projects Pinellas County.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Interstate 95 Corridor Improvement Program June 20, 2012.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
School Year Calendar Options Presentation – Board of Education October 10, 2007.
County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Integrating Transit and Highway Solutions In High Volume Corridors
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
The Oakton Condominium Association September 12, 2017
Seasons.
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Major Initiatives in Hampton Roads
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

Tysons May 8, Operational Analysis of Dulles Toll Road Ramps to Tysons Corner

Tysons Agenda Review of Progress Preferred Options Public and Stakeholder Outreach Schedule Next Steps 2

Tysons Review of Progress Study KickoffMay 24, 2011 Data Gathering & AnalysisJune - August 2011 Alternatives WorkshopSeptember 23, 2011 Monthly Progress MeetingsOngoing (Included representatives from FCDOT, VDOT & MWAA) Selection of Preferred Options March 21,

Tysons Preferred Options Developed nine scenarios including providing upgrades to existing Route 7 and Spring Hill Road Interchanges Improvements to existing Route 7 and Spring Hill Road Interchanges were not cost effective based on the minimal capacity added Compared three preferred alternatives against the No Build Alternative Measured the Network Performance of each preferred option and compared traffic operations 4

Tysons DTR & Route 7 Diversion Diamond DTR & Route 7 Diversion Diamond DTR & Route 7 Modified Interchange (Flyover Ramp) DTR & Route 7 Modified Interchange (Flyover Ramp) 2030 No Build Preferred Option 2030 No Build Compare 2030 No Build vs. Preferred Interchange modification Option Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Boone Blvd. Ramp & Jones Br. Dr. Ramp Preferred Option Combined with Boone Blvd. Ramp & Jones Br. Dr. Ramp 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Urban Frontage Road Preferred Option Combined with Urban Frontage Road Preferred Option Combined with Urban Frontage Road Preferred Option Combined with Urban Frontage Road 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp Preferred Options 5

Tysons Preferred Options Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Greensboro Dr. Ramp & Boone Blvd. Ramp Preferred Option Combined with Urban Frontage Road Preferred Option Combined with Urban Frontage Road 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp 2030 No Build Combined with Boone Blvd. Ramp & Greensboro Dr. Ramp & Jones Br. Dr. Ramp 2030 No Build 6

Tysons Preferred Options 7 Preferred Option 1 – Boone Boulevard, Greensboro Drive

Tysons Preferred Options 8 Preferred Option 2 – Urban Frontage Road

Tysons Preferred Options 9 Preferred Option 3 – Boone Boulevard, Greensboro Drive, Jones Branch

Tysons 10 Network Performance Comparison AM PM

Tysons Next Steps 11 Tysons Partnership BriefingMay 23, 2012 Public Information MeetingMay 30, 2012 Evaluate ImpactsSummer 2012 Second Public Information Meeting Fall 2012 Study Completion Winter 2012