CRITF Update ISAS Vegas January 11, 2006. Action Items -Work on items that need tag identification under both existing MORC and ORSTF proposal -Define.

Slides:



Advertisements
Similar presentations
2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Advertisements

1. ***Confidential*** Concerns Tag Non Firm Option October 10, 2010 Bert Bressers 2.
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
E-Tag 1.8 An industry tutorial. e-Tag 1.8 The basics features of e-Tag 1.8 are much the same as in the current version The tag author uses Agent.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
Business Practices Subcommittee Update February 2, 2010.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
NAESB Coordinate Interchange Standard, Version 1 / 0
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Operating Reserves --- Again A Discussion Primer
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Primary Objectives of WIT
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
Load Responsibility in the NWPP Footprint
WECC BAL-STD-002 Workshop February 6, 2008
OC ORSTF Position WECC Board Meeting December 8, 2006.
INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Contingency Reserve Standard Drafting Team Presentation before the WECC Board Technical Conference David Lemmons Standard Drafting Team Chair December.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Presented to the WECC MIC June 15, 2007
POTF Status update.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
FERC Order minute Scheduling.
Overview of CAISO Stakeholder Process for FERC Order 764 Compliance Implementation of 15 minute scheduling and settlement Jim Price, CAISO Presentation.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
IWG Update April 2014 ISAS Danielle Johnson. WIAB Test – Still looking for other volunteers for the WIAB Fall 2014 – Volunteer as of Today WAPA Rocky.
Generation Dominated Areas Oliver Day 5 April | Energy Networks Association - DCMF.
Reporting GHG Emissions from Power Purchases CPUC/CEC Workshop on Load-Based Reporting Mike McCormick, Policy Director April 13, 2007.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Recallable Tag Discussion Bud Freeman When are they used? What are the implications?
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
WSPP Reserves Issue Educational Webinar February 26, 2008.
Calculation of Net Energy for Load COPS. 2 2 Outline  Definition of Net Energy for Load  How Net Energy for Load is calculated in ERCOT.
Standards Review Subcommittee Update August 17, 2010.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
1 EEA Workshop 3 April 2, /3/2015For the purpose of discussion only.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
CMTF Tariff Language Clarification 1. Parking Lot Question Is the Planning Reserve Margin requirement meant to be maintained throughout the whole calendar.
Wind Management at MISO
Congestion Management and Ramp Rate for Delivering Ancillary Services
Rich Hydzik, Avista NWPP RSGC Vice-Chair
Steve Rueckert Director of Standards WSC Meeting Overview
Presentation transcript:

CRITF Update ISAS Vegas January 11, 2006

Action Items -Work on items that need tag identification under both existing MORC and ORSTF proposal -Define a calculation for Contingency Reserve Obligation under ORSTF -Wait for ORST proposal to work through process -Take next steps if not adopted or STOP

Old CR calc Operating CRR= ½(Max(MSSC,.05*hydro gen +.07*thermal gen)) + interruptible imports + on demand exports Where: –interruptible and On demand transactions are limited to those that can be activated in 10 minutes or less Spinning CRR = ½(Max(MSSC,.05*hydro gen +.07*thermal gen)) + spin exports

Under ORSTF CRR=Max(MSSC,.05*Control Area load) –½ of which must be spinning How a BA determines MSSC is not universally agreed upon at this time

What that really means No change as to what is counted as reserves Activated in 10 minutes or less counts as operating reserves

Operating Reserve Resources Load that can be interrupted within 10 minutes Reserve purchases where energy can be delivered within 10 minutes Exports that can be interrupted within 10 minutes Generation that can be ramped up within 10 minutes

Reliability Check When reserve commodities are exchanged within WECC between BAs it must not reduce the amount of reserves carried within WECC

Operating Reserve Reductions Interchange imports that are counted as a reserve resource by the source that can be decreased within 10 minutes by the source Reserve sales where you must deliver energy within 10 minutes

BA Calculation The amount of reserves available in a BA is the sum of Reserve Resources minus the sum of Reserve Resource Reductions

The Spin Spinning Reserve Resources are increased by a purchase of Spinning Reserve and decreased by a sale of Spinning Reserve

Obviously Nonspinning Reserve Resources are increased by a purchase of Nonspinning Reserves and decreased by a sale of Nonspinning Reserves

Operating Reserve Commodities That Can Be Exchanged Between BAs Interchange that can be increased by the source within 10 minutes on request of the sink Interchange that can be decreased by the sink within 10 minutes

Difference between Spin and Non Interchange that can be increased by the source within 10 minutes can be further divided into Spinning (unloaded generation that is synchronized and ready to serve additional demand) and Nonspinning reserve

G-F? Interchange that is Firm, non-firm, unit contingent, etc. are all treated exactly the same (i.e., no impact on reserve resources)

Trinity of Reserves Interchange that can be increased within 10 minutes at the request of the sink that is Spinning at the source (C-SP) (BP-15) Interchange that can be increased within 10 minutes at the request of the sink and need not be Spinning at the source (C-NS) (BP-15) Interchange that can be decreased within 10 minutes at the request of the source and is included in the sources reserve resources (C-RE) (BP-11)

CRITFs Objective These interchange transactions must be uniquely identified in the e-tag so that BAs may correctly calculate their reserve resource and reserve resource reductions

Identify by PC C-SP (spinning) C-NS (non-spinning reserve or supplemental reserve) C-RE (Reducible Export)

New Business Practices CRITF commented on the capacity BP and wrote a new BP Request… The new BP request was accompanied by a draft BP which has become BP-11

Additional Issues Need a standard for non-reserve capacity transactions (adjusted > 10 min) Need to expand scope of WSPP to include reserve transactions Need to expand scope of WSPP to include loss transactions MSSC needs further discussion and definition, including how interchange transactions may impact MSSC

Possible Survey WECC may request that bas provide e-tags for a specific day for all transactions that add directly to or subtract directly from contingency reserves WECC will then tally whether source and sink agree on the treatment The theory is that currently they frequently do not