Schedule meeting May 2011 1 23 May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule.

Slides:



Advertisements
Similar presentations
FIRST Pneumatics Team 1425 Wilsonville Robotics. Agenda Components Components Basic System Design Basic System Design Applications Applications Tricks.
Advertisements

Finally, a compressed air piping system so simple…it’s EZ!
Air Muscle Robotic Tiger P Presentation Agenda Specs and Customer Needs Concept Summary Design Summary System Testing Results Successes and Failures.
PISTON ENGINES Part 6 Piston Engine Operations (Ignition)
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Larox Pinch Valves T HE S OLUTION Y OU ´ VE B EEN L OOKING F OR.
Couplings Nizwa College of Technology.
1 Feb 2011 Actuators (4) Optical sensors DIFFUSER CM29 Irises.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Brakes Yes, they are Important!
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Microcontroller Hands-on Workshop #3 Ahmad Manshad New Mexico State University Institute of Electrical and Electronics Engineers November 7, 2009.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
Three-phase Cage Rotor Induction Motors Resource 2 Three-Phase AC machines.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
HIRADMAT tungsten powder experiment Presented by Ottone Caretta Presented by Ottone Caretta
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
CM25 Engineering 1 4 Nov 2009 DIFFUSER Carousel (~50kg) Driven by air motors – 3 separate ‘actions’ 1.Carousel rotation 2.“30 degree rotation’’ Transfers.
The HCAL barrel absorber structure
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
PRESENTATION ON CAMLESS ENGINE
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Prepared By Rohit G. Sorte M.Tech
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Piston Engine Propulsion Ignition. Ignition in a piston engine requires: Spark plugs Magneto Condensers Distributor Contact breakers electronic systems.
Straw man layout for ATLAS ID for SLHC
Automotive Engines Theory and Servicing
52 CRANKING SYSTEM CRANKING SYSTEM.
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Presentation on Actuators.
Fixture.
Clutch Fundamentals.
Design of the Injection Can
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Manufacturing of the first FCC-hh beam screen prototype for ANKA
INDUSTRIAL HYDRAULICS
Molecular Beam Epitaxy Shutter System
Start.
LumiCal mechanical design, integration with LDC and laser alignment
Asahi/America Electric Actuators Series 94.
Sensors May 25, 2013.
Valves.
Diffuser V. Blackmore CM32, RAL, 10/02/
Induction Motor. Induction motor Main parts are Stator Rotor.
Done By: J.Johnny Hudson ( ) E.Jude Livingstone ( )
Transmission system of Automobile
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Asahi/America Electric Actuators Series 94.
1.11: Robot Controller.
as a prototype for Super c-tau factory
Automotive Engines Theory and Servicing
Introduction to Electro-pneumatic
Electric Machine Design Course
By Ashvani Shukla Manager(C&I) BGR ENERGY
Pneumatic System Components
Presentation transcript:

Schedule meeting May May 2011 THE DIFFUSER 1.Requirements 2.Description 3.Components 4.Trials 5.Schedule

Schedule meeting May May 2011 PHYSICS REQUIREMENTS Purpose –Inflate emittance of beam before cooling i.e. heat the beam Introduce up to ~3 radiation lengths high Z material at upstream end of upstream Spectrometer Solenoid –Ability to vary amount of material –Steps of 0.2 radiations lengths

Schedule meeting May May 2011 OPERATIONAL REQUIREMENTS 1.Remote control from outside high-field region of Solenoid 2.Manual (local) control 3.Condition available to EPICS system 4.Minimal operation time 5.Minimal maintenance 6.Maximum expected number of operations < 20,000 (?) 7.Long periods when not in use

Schedule meeting May May 2011 SPECIAL CONSIDERATIONS 1.Must operate in high magnetic field (~4T) Precludes: Electric motors or actuators Magnetic sensors Any ferromagnetic materials Some grades of stainless steel 2.Possible forces for short periods of time (a few seconds) due to eddy currents if solenoid quenches. Avoid loops of high conductivity materials e.g. aluminium

Schedule meeting May May 2011 GENERAL DESCRIPTION Four in-line irises in ‘cassettes’ stacked in a drum inserted into bore of solenoid. Irises opened or closed by pneumatic rotary actuators at upstream end of drum. Irises of 0.2, 0.4, 0.8 and 1.6 radiation lengths give 0 – 3 radiation lengths in 16 steps of 0.2 Optical sensors on operating shafts give state (open/closed) of irises Irises (4) Actuators (4) Optical sensors (4)

Schedule meeting May May 2011 IRIS CASETTES Each cassette contains two sets of four ‘petals’ supported by an ‘outer ring’. Pins on an ‘inner ring’ engage with slots in the ‘handles’ of the petals The inner ring has a short toothed section which engages with a gear Rotation of the gear (~120 degrees) will open / close petals Petals are adjacent to minimise longitudinal gaps Tufnol (proprietary SRBF) used for outer ring to minimise weight Four sets of petals: 3 & 6mm brass, 3 & 6mm tungsten Gear

Schedule meeting May May 2011 CASSETTE COMPONENTS Only seven different types of component required for all four cassettes

Schedule meeting May May 2011 CONTROLS 1.Pneumatics Re-use air crate of old design Have more than enough solenoid valves &c Rebuild & rewire crate New front panel 2.Electronics Re-use electronics crate Some rewiring New front panel (push buttons & indicators) Reprogram FPGA 3.Controls Modify existing LabView Code Eventual migration to EPICS Control required is minimal – only whilst changing setting

Schedule meeting May May 2011 PROTOTYPE CASSETTE Stainless steel petals used for prototype ~0.3 Nm torque required to open/close Light hand-operation

Schedule meeting May May 2011 ACTUATORS Need four pneumatic rotary actuators: 120 degree rotation & ~1Nm at 3 bar Non-magnetic components not commercially available Commercial custom manufacture probably very expensive Make our own (~Chinese copy) Works as expected (torques v. hard to measure) But ~1.5 bar of ‘stiction’

Schedule meeting May May 2011 OTHER COMPONENTS DrumFinished ActuatorsMade; need better piston seals Optical sensorsFinished, tested CassettesAll made SS innner Rings2 to make Flatness difficult to achieve Brass petalsFinished TungstenNot cut Electronics crateReady; needs new front panel Air crateSimple; have solenoid valves Waiting until we know pressures required; may need some reducers

Schedule meeting May May 2011 PETALS Petals cut with spark eroder & wiring machine Easy for SS & Brass Brass electrode for spark eroder won’t cut tungsten I am assured that copper electrodes will work…

Schedule meeting May May 2011 TRIAL ASSEMBLY & TESTING

Schedule meeting May May 2011 TRIAL TESTING 3mm Brass iris + Actuator Solenoid valve + oscillator –Cycle automatically –Few hundred operations Operates happily at ~2 bar –1.5 bar for actuator stiction for iris Right kind of lubrication is important –Grease too thick –“3 – in – One” seems to work

Schedule meeting May May 2011 PLAY WITH IT

Schedule meeting May May 2011 PLAY WITH IT

Schedule meeting May May 2011 KNOWN UNKNOWNS Piston seals for actuators –Bought some proprietary seals Too stiff –Currently not using seals but close-machined pistons Must find suitable – soft – seals –Service kits for commercial actuators?? Tungsten –Have not yet cut it… Go outside if necessary (would cost) –Friction –How to scale operating pressure? Scaling by mass  x 0.5 = 4 bar –Have ~6 bar available

Schedule meeting May May 2011 INSTALLATION Should be plug-and-play: 1.Install crates 2.Install pipes & cables 3.Install drum on patch panel & solenoid 4.Insert cassette assembly into drum May need simple jig (bar) for support 5.Mount actuators 6.Connect pipes & cables 7.Test 8.Test with field 9.Quench test ?? Have allowed 16 days in schedule

Schedule meeting May May 2011 SCHEDULE Man & boy enterprise Progress determined by availability of Self * JT * Machines in workshop Most recent estimate “350 man hours of effort” in mechanical workshop

Schedule meeting May May 2011 THE END