Nick Small, Shawn Boughey, Karolina Latkoska SPQM / SEP 1.

Slides:



Advertisements
Similar presentations
Lesson 15: Closing the Project Topic 15A: Close Project Procurements Topic 15B: Close the Project or Phase Administratively.
Advertisements

Facilitated by Joanne Fraser RiverSystems
Calyxinfo Walking through Calyx Info The Organisation.
Get in touch with Microsoft Dynamics Sure Step Saied Alhamwi, PMP Business Application Manager ACWA Holding
ETT 429 Spring 2007 Microsoft Word III. Reviewing Function of reviewing Function of reviewing Inserting comments Inserting comments Student application.
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Copyright © 2001 Bolton Institute Faculty of Technology Multimedia Integration and Applications Lecture 9: Production Management Damien Markey.
Communication and the Team. Communication Issues A common problem with most development projects are communication issues These can be present in a number.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
FUNDAMENTAL TEST PROCESS
Avoiding Common Project Management Pitfalls – A Guide for Super PMs Yvette Soliz Rivers, PMP Director, Project Management November 14, 2012 Disaster Averted!
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Project Management Design specifications
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management Phases Class 6. Initiation & Planning – Agenda Overview of the project management phases Midterm paper details.
Using UML, Patterns, and Java Object-Oriented Software Engineering Chapter 3, Project Organization and Communication.
Web Development Process Description
S/W Project Management
Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1.
Implementation & Integration Phase Implementation, then integration: Implementation, then integration:  Each module is implemented by member of programmer.
Conquering Complex and Changing Systems Object-Oriented Software Engineering Art for Chapter 11, Project Management.
Project Management Life Cycle Katy Koenen 05/07/2013.
Karolina Muszyńska. Reverse engineering - looking at the solution to figure out how it works Reverse engineering - breaking something down in order to.
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
© Mahindra Satyam 2009 Defect Management and Prevention QMS Training.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Quality Knowledge Area
Resources Performance time. resources Performance time 2.
LOGO 1 Club League Management Software Our software was designed from hands on experience. Our staff has worked with soccer clubs similar to yours not.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
Second SEED Workshop SEED Phase 2. Plan of Activities.
Tripharn Teki, Nick Small, Shawn Boughey, Karolina Latkoska SPQM / SEP.
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
Chapter 2 Iterative, Evolutionary, and Agile You should use iterative development only on projects that you want to succeed. - Martin Fowler 1CS
Nick Small, Shawn Boughey, Karolina Latkoska SPQM / SEP 1.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Tripharn Teki, Nick Small, Shawn Boughey, Karolina Latkoska PG Project Maniacs SPQM / SEP.
Tripharn Teki, Nick Small, Shawn Boughey, Karolina Latkoska PG Project Maniacs SPQM / SEP.
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Reviews mae, fall 11. Review What: – Have skilled people assess your work –Requires that you have work product that is reviewable Why: – Find problems.
Jonathan Drake, Neil Howerton, Katie Kester, Doug Siemon.
Bryan Proctor, Account Manager. Tips and Tricks  Version of ClientSpace  Password Configuration  Document Management  Task Enhancements  Systems.
QMS Training TM Module.
Team-Based Development ISYS321 Managing the Information Systems Project.
Project Deliverables CIS 4328 – Senior Project 2 And CEN Engineering of Software 2.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Nick Small, Shawn Boughey, Karolina Latkoska Project Briefing 1.
Project Management PTM721S
Architecture Review 10/11/2004
Standard Operating Procedure
Project management Software development typically includes:
Project Management Processes
ITS Strategic Planning Guidelines
TechStambha PMP Certification Training
SPQM / SEP.
Chapter 1 (pages 4-9); Overview of SDLC
Project Management Processes
Data Groupings: File File: a group of related records
Monitor & Control Project
Executive Project Kickoff
Presentation transcript:

Nick Small, Shawn Boughey, Karolina Latkoska SPQM / SEP 1

Nick Small, Shawn Boughey, Karolina Latkoska What? Project Planning Project Charter Project Management Plan Risk Mgt Plan Change Mgt Plan Project Quality Plan Communication Plan Configuration Plan Project Closure Document Requirements Analysis Use Case Diagram Use Case Narratives SSDs DFDs Domain Diagram Design Functional Specifications System Architecture Database Design Specification Data Migration Strategy GUI Specification 2 Complete In Progress Legend

Nick Small, Shawn Boughey, Karolina Latkoska When? 3

Nick Small, Shawn Boughey, Karolina Latkoska Risks Limited time Unclear requirements Inability to convey requirements Reduced team Changes Reduced team Issues Reduced team 4

Nick Small, Shawn Boughey, Karolina Latkoska What are we doing about it? Option 1 (1) 5 Revisit project tasks and schedule Reassign deliverables across the team

Nick Small, Shawn Boughey, Karolina Latkoska Option 1 (2) 6 Project Planning Project Charter Project Management Plan Risk Mgt Plan Change Mgt Plan Project Quality Plan Communication Plan Configuration Plan Project Closure Document Requirements Analysis Use Case Diagram Use Case Narratives SSDs DFDs Domain Diagram Design Functional Specifications System Architecture Database Design Specification Data Migration Strategy GUI Specification Karolina Nick Shawn Karolina Nick Shawn

Nick Small, Shawn Boughey, Karolina Latkoska Option 1 (3) 7 Planning, Requirements, and Design Karolina PMP Quality Plan Change Plan Config Plan DB Design Nick Risk Plan UML Models Issues Register Data Migration Shawn Requirements Modelling System Requirements Functional Specs Architecture GUI

Nick Small, Shawn Boughey, Karolina Latkoska Option 1 (4) 8 Face to Face ~3 hr/pp/pw Client questions, discussion and clarification, of issues, action items, task allocation, presenting to client Online ~2 hr/pp/pw Monitoring changes, team communications, client questions Individual ~8 hr/pp/pw Writing deliverable documents, reviewing documents from team members

Nick Small, Shawn Boughey, Karolina Latkoska What are we doing about it? Option 2 9 Reduce scope

Nick Small, Shawn Boughey, Karolina Latkoska Data Migration 10 Consult on importance of database fields Characterise, quantify data problems Examine feasibility of correcting data problems Analysis Develop and agree on migration acceptance criteria and tests Agree on new platform architecture Develop code for data extraction and testing Develop plan for freezing data structures during migration Design Freeze data structures Migrate data to new platform Run quality and acceptance testing Activate interfaces on new database otherwise rollback Deployment

Nick Small, Shawn Boughey, Karolina Latkoska Data Migration - analysis 11 FieldImportance Reliabilit y Business SignificanceCharacteristicsIssues AddressMediumLow Useful for postal correspondence (e.g. reminders, promotions) Almost all rows have values Mix of upper and lower case Unicode characters Numbers Some superscript characters A number of special characters 4 empty rows Most rows appear to contain foreign addresses PhoneHighLowNeeded for contacting customers to advise on progress with work Useful for contacting clients for inspection reminders Almost all rows have values All values are numbers, hyphens, full-stops or parentheses No letters Some empty rows Mixed formatting in the form of use of hyphens, full-stops and parentheses What appear to be ISD country codes do not correspond reliably to values in Address, City, Region or NewPCode