Phoenix Convention Center Phoenix, Arizona Army Reserve Metering Program Integrated EnergyMetering Strategies Marcus De La Rosa Pacific Northwest National.

Slides:



Advertisements
Similar presentations
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Advertisements

Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
DOE O 430.2B Metering Requirements and Status
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
North American Operations Kalamazoo Plant Welcome to Kalamazoo.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Authors: Mateusz Jarus, Ewa Kowalczuk, Michał Madziar, Ariel Oleksiak, Andrzej Pałejko, Michał Witkowski Poznań Supercomputing and Networking Center GICOMP.
Load Shifting and Peak Load Reduction using Building Thermal Mass
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
Phoenix Convention Center Phoenix, Arizona Building Teams and Procuring Services Agency Energy Manager Building Teams and Procuring Services Butch Wallace.
License No Innovative Solutions. Enduring Principles.
DELIVERING ENERGY INNOVATIONS AT SCALE THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY BRETT GOODYEAR – HEAD OF OPERATIONS
Phoenix Convention Center Phoenix, Arizona Keys to Energy Behavior Change Solution Showcase Retained Energy Savings: Putting It into Practice Mike Van.
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific.
Phoenix Convention Center Phoenix, Arizona Data Center Energy Management Strategies Edwards AFB Data Center Consolidation ESPB Building Performance Data.
Phoenix Convention Center Phoenix, Arizona Professional Development and the Agency Energy Manager Agency Energy ManagerProfessional Development Brian Gilligan,
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Sustainable Operations Summit USDA Forest Service Forest Products Laboratory November 18, 2008 Environmental Footprint Concurrent Session Energy I: Existing.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
Phoenix Convention Center Phoenix, Arizona Federal Water Efficiency Sustainability TrackWater Efficient Operations Kate McMordie Stoughton Pacific Northwest.
Phoenix Convention Center Phoenix, Arizona CHP using Combustion Turbines Track 6 Integrated Energy“Combined Heat & Power” Chris Lyons Solar Turbines Incorporated.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Phoenix Convention Center Phoenix, Arizona Engaging and Empowering Building Occupants to Meet Energy Goals Track 9: Institutional Change August 12, 2015.
Challenges of Localized Cooling Systems
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Phoenix Convention Center Phoenix, Arizona Metering Guidance & Best Practice Integrated EnergyMetering Strategies Saralyn Bunch Federal Energy Management.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Phoenix Convention Center Phoenix, Arizona Army’s Net Zero Initiative Sustainability Getting to Net Zero: Energy, Water and Waste Alicen Kandt National.
Basics of Lighting Controls U.S. Department of Energy Rebuild America And Novitas, Inc.
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Phoenix Convention Center Phoenix, Arizona Taking a Holistic Approach to Energy Strategy Integrated Energy TrackIntegration of the Energy Industry Chris.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Phoenix Convention Center Phoenix, Arizona Reducing Scope 1, 2 and 3 Greenhouse Gas Emissions Track 4: Sustainability August 13, 2015.
Phoenix Convention Center Phoenix, Arizona Inventory of Federal Greenhouse Gas Emissions, Reductions to Date, and Potential Reductions Sustainability Reducing.
Phoenix Convention Center Phoenix, Arizona Retrofits of Existing Distributed and District Systems: Case Studies [Track Title][Session Title] Robert R.
Phoenix Convention Center Phoenix, Arizona Greening the Federal Government Track 1: Solution Showcase August 11, 2015.
Sustainable Laboratory Design: Challenges and Solutions
Phoenix Convention Center Phoenix, Arizona The Federal Buildings Personnel Training Act What It Means To You Institutional ChangeThe FBPTA & What It Means.
Phoenix Convention Center Phoenix, Arizona Utility-Based Technology Demonstration Programs Track 10Session 8 Phill Consiglio, Senior Manager Federal, Energy.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Phoenix Convention Center Phoenix, Arizona Compliance Reporting Systems Track 2: Agency Energy Manager August 13, 2015.
Phoenix Convention Center Phoenix, Arizona Energy Service Provider Perspective Agency Energy Manager Track Building Teams and Procuring Services Kevin.
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
Phoenix Convention Center Phoenix, Arizona Using Alternative Financing to Enhance Energy Performance in Renovation Projects Track 1: Solution Showcase.
Phoenix Convention Center Phoenix, Arizona Legislative Drivers, Compliance, and FEMP Services Track 2: Agency Energy Manager August 11, 2015.
Phoenix Convention Center Phoenix, Arizona HVAC Technologies Track 3: Energy Technologies August 12, 2015.
Phoenix Convention Center Phoenix, Arizona Green Buildings: Architecture, Landscape and Operations Track 4: Sustainability August 13, 2015.
Phoenix Convention Center Phoenix, Arizona Integrated Assessment for Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS)
Building Lighting Controls
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Metering and Monitoring  The Business Case.  Implementing the project.  Benefits – accurate data and data analysis.  On-going challenges.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
The UC Project Management Institute is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion.
Phoenix Convention Center Phoenix, Arizona Case Studies of Institutional Change at the Campus Level Track 9: Institutional Change August 13, 2015.
Phoenix Convention Center Phoenix, Arizona Aligning with an Organizational Mission to Drive Energy Savings Track 9: Institutional Change August 11, 2015.
Energy and Water Reduction English Martyrs’ Catholic School Lee Jowett Environmental Education Coordinator Leicester City Council.
Phoenix Convention Center Phoenix, Arizona The Next Network: Lighting, Controls and the Internet of Things Track 3: Energy Technologies August 12, 2015.
Sustainability Left click to advance $200 Billion
Solution: IDSM for SMB and MDU Markets
The Engineering and Maintenance Division
Insert installation name
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona Army Reserve Metering Program Integrated EnergyMetering Strategies Marcus De La Rosa Pacific Northwest National Laboratory August 13, 2015

Energy Exchange : Federal Sustainability for the Next Decade AGENDA Intro to the Army Reserve Army Metering Program Army Reserve Meter Data Evaluation –Meter Data Management System –Army Reserve Solution Army Reserve Acceptable Parameters Army Reserve Metering Program Process –Challenges Backup Slides 2

Energy Exchange : Federal Sustainability for the Next Decade Intro to the Army Reserve 3 # BuildingsBldg (SF)Land (Acres) OwnedLeasedOwnedLeasedOwnedLeased 4, M2.6M272,270182,534

Energy Exchange : Federal Sustainability for the Next Decade Typical Army Reserve Training Complex 4 Army Reserve Center Training Facility Army Reserve Center Training Facility Storage Organizational Maintenance Shop Organizational Maintenance Shop

Energy Exchange : Federal Sustainability for the Next Decade 99 th RFOS and AFOS 5

Energy Exchange : Federal Sustainability for the Next Decade AMP and MDMS Army Metering Program (AMP) –Army Reserve Portion 789 Meters Installed on 410 Facilities 393 Meters Reporting on 212 Facilities (FEB 2015) –Electricity –Natural Gas –Water Army Meter Data Management System (MDMS) –AR Meters 100% connected & reporting to central location by 30 DEC,

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program What to do with data? –Value Energy Reduction = Cost Savings –Scale 800 meters –Time Regular review Answer: Evaluate Building Operations 7

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Army Reserve Process –Download 15 min interval data from MDMS –Process data –Upload data to PNNL server –Perform data analytics –Generate graphics –Analyzed meters in groups and individually –Write Meter Data Evaluation Report –Issue ELAS Tasker –Track responses to Tasker & repeat 8

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Four Operational Characteristics 1.Does the building have proper night and weekend setbacks? 2.Are the start times appropriate? 3.Are the shut off times appropriate? 4.Does the building have a high base load? 9

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 10 Electric Meter

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 1.Night and weekend setbacks –Identified by a change in consumption patterns between night, weekday, and weekend hours 11 No SetbacksNight and Weekend Setbacks

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 2.Early start times –Identified by an increase in consumption before 0600 hrs 12 Poor SetbacksEarly Start & Late Shutoff

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 3.Late shut off times –Identified by a lack of reduction in consumption after 1900 hrs 13 Poor SetbacksEarly Start & Late Shutoff

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 4.High Base Load –Identified by the baseline consumption during unoccupied hours compared to either: The occupied consumption periods, or Other buildings in the same RSC/Installation 14

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Meters Grouped by RSC and Installation –Finding Outliers 15

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 16

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Meter Data Evaluation Report Analysis of every meter 17 State / Installati onSite Building Name Night time set backs Early Start Times Late Shutoff Times High Base Load Data Every Month?Specific Notes NORTH CAROLINA NC004 - ASHEVILLE, NORTH CAROLINA 1 Walter Hatch Lee Reserve CenterNO YES No night or weekend set backs evident. NORTH CAROLINA NC007 - CHARLOTTE, NORTH CAROLINA 15 Charlotte Reserve Center #3NO YES Night set backs are not evident, but weekend set backs are. NORTH CAROLINA NC007 - CHARLOTTE, NORTH CAROLINA 1 Charlotte Reserve Center #1 (HQ 108th Division)YES NOYES Night and weekend set backs are in place, but HVAC turns on at 0300 hrs every day. NORTH CAROLINA NC026 - GREENVILLE, NORTH CAROLINA 2 CPT Christopher S. Cash AFRC----NONo data for 2014 NORTH CAROLINA NC027 - HICKORY, NORTH CAROLINA 1 D.W. HUDSON USARCNO YES No night or weekend set backs evident.

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Meter Data Evaluation Tasker Questionnaire –Describe planned corrective action, or –Explain why building must operate outside normal parameters Building Identification Information Meter Data Evaluation Questionnaire RegionInstallationSiteBuilding Name Building Number Describe planned corrective actionOR Explain why outside normal parameters Additional Comments 63rdARIZONA BARNES HALL USARC P0002 BARNES HALL USARC/AMSA 96(G)P rdARIZONA BARNES HALL USARC P0006 BARNES HALL USARC/AMSA 96(G)P0006 Building operates within acceptable parameters. No response required. 63rdARIZONA HERREA HALL USAR CENTER 100 HERRERA HALL USARC100 63rdARIZONA HERREA HALL USAR CENTER 200 HERRERA HALL USARC200 63rdARIZONA HERREA HALL USAR CENTER 602 HERRERA HALL USARC602

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Challenges –Manual process for large number of meters ( ) Download, Process, Upload, Perform analytics, Visualize, Analyze, Write report, Issue Tasker, Track, Repeat Team of 1,2,3,4,5,6,7 people –Determining where and how to direct change in building operations –Who has the authority to make changes to the operating schedule in the building controls systems? AFOS PM Contractor Building occupants 19

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 20 THANK YOU Marcus De La Rosa Pacific Northwest National Laboratory

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 21 Water Meter LEAK!

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Water Meter Looks like Natural Gas Meter Why? Boiler Feed Boiler Setpoints 22

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Natural Gas Meter On/Off switch? Certainly no night/weekend setbacks! 23

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Natural Gas Meter Maintaining Constant Setpoint 24

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Electric Meter Parking lot lights? 25

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program Electric Meter Malfunctioning Meter 26

Energy Exchange : Federal Sustainability for the Next Decade ARIMD Metering Program 27 FIN