1 MATERIAL MANAGEMENT Emond Olivier BR3 Dismantling project Group Leader D&D material management SCKCEN Emond O. SCK-CEN chapter 6.

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Pollutant Valuation Cost Containment Calculation of Damaged Assets Eddie Leung Secured Environment.
Decommissioning Plan for Kozloduy Nuclear Power Plant Units 1 & 2 E
H. Sterner E. Thurow Energiewerke Nord GmbH
© Fraunhofer UMSICHT Asja Mrotzek, Fraunhofer UMSICHT / Energy Technology International Forum of R&D for Eco-innovation: Research for combining environmental.
Nuclear Graphite Research Group University of Manchester, UK
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
ATLAS Utility Management Software BobComm 2004 January
Production Efficiency Guidance notes January 2010.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
1 Special technique at KRB A: Decontamination of stainless steel parts with phosphoric acid quick processing time reliability less secondary waste maximal.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
ENGINEERING PROJECT PROPOSAL MASTER OF ENGINEERING IN MECHANICAL ENGINEERING DAN FLAHIVE Analytical Method to Predict Primary Side Steam Generator Pressure.
The Production Process
Information Storage and Retrieval CS French Chapter 3.
NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
Energy & Materials Flow & Cost Tracker (EMFACT) Terri Goldberg, NEWMOA.
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. Gerard van Noordennen September 29, 2014.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
Chapter 8 Transaction Processing, Electronic Commerce, and Enterprise Resource Planning Systems.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
State Nuclear Regulatory Inspectorate of Ukraine SE “Information Technologies Center for Use of Nuclear.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Chapter 12 The Network Development Life Cycle
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
IBM Global Services © 2005 IBM Corporation SAP Legacy System Migration Workbench| March-2005 ALE (Application Link Enabling)
Nuclear Power Plant How A Nuclear Reactor Works.
CS 350 – Software Design A Problem That Cries Out for Flexible Code – Chapter 3 Imagine you want to extract information from a CAD system to feed an expert.
Cardiovascular System Heart Functions. Functions of the Heart Keeps O2 poor blood separate from O2 rich blood. Keeps the blood flowing in one direction.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Additional Problems (1) A wet paper pulp is found to contain 71% water. After drying it is found that 60% of the original water has been removed. Calculate.
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Beryllium Waste Management (non radioactive)
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
‚WF-RepTool‘ structure and database application to monitor WEEE treatment results key points – start up & how to use update: June 2014.
State Nuclear Regulatory Inspectorate of Ukraine
9I Energy and Electricity
Cardiovascular System
Traceability of Gas Pipeline Materials Research & Materials Manager
14 Bin location management
Query-by-Example Transparencies
Presentation transcript:

1 MATERIAL MANAGEMENT Emond Olivier BR3 Dismantling project Group Leader D&D material management SCKCEN Emond O. SCK-CEN chapter 6

2 The BR3 pilot Project (10Me PWR) Shut down in 1987 after 25 years of operation. The main achievements of the decommissioning project are : Full system decontamination of the primary loop in 1991 Dismantling of the high active internals Construction and exploitation of efficient decontamination processes (MEDOC, ZOE..) Dismantling of the Reactor Pressure Vessel in 1999/2000 Decontamination of the Steam Generator 2002 Evacuation of the spent fuel 2002 Still underway and continue up to 2008

3 Work Organization Dismantling Cutting Temporary storage Sorting TreatmentCharacterizationEvacuation Identification

4 Objective Tracability of material from production to evacuation From the point of view of external services  Asked by the regulatory authority  Information flow between the exploitant and the contractant (others services)

5 Tracability From the point of view of the exploitant:  Improvement of decommissionning experience  Allow the right treatment process in function of type material or component  Allow the right evacuation route in function of the history of the material  Allow the calculation of decomissionning cost

6 Tools History of the plant Inventory of material (components, circuits and building) Database QA program related to waste management Specific tools (weighting pallet jack,drum scanner,sticker)

7 Working methodology followed during the actual dismantling Dismantling Cutting, sorting and identification Temporary storage Treatment Characterisation Temporary storage Evacuation Data acquisition

8 Creation of “batches” Batch : Group of materials which will follow the same evacuation route A batch can be:  300 l container  200 l drum  400 l drum  Single large piece e.g. a reservoir Every batch carries a unique label  unique number  content of the batch

9 Description  Dismantling instruction  Inventory records  Loop, pieces of …,  Dimensions - diameters  Type of material (stainless steel, carbon steel, painted, …)  Origin (area, place in area, …) Identification of a BATCH

10 Data acquisition The content of a batch, its status and its location must be known at each moment.. All relevant information is on a label All this information is put into a database including the location of the batch Implementation of a Quality Assurance system

11 DATABASE

12 EVACUATION ROUTES

13 Evacuation of Radwaste

14 Evacuation of Free released materials

15 Evacuation to Melting Facility

16 UPDATING DATABASE UPDATING INVENTORY’S RECORDS AFTER EVACUATION