1 PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011

2 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 2  BRENNILIS REACTOR BRENNILIS REACTOR  DECOMMISSIONING DECOMMISSIONING  SCOPE OF WORK SCOPE OF WORK  MAIN REQUIREMENTS MAIN REQUIREMENTS  MAIN DESIGN PROBLEMS MAIN DESIGN PROBLEMS  DESIGN SOLUTIONS DESIGN SOLUTIONS

3 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 3  Brennilis reactor is an experimental reactor moderated with heavy water and cooled with carbon dioxide (HWGCR). The reactor was to have a power of 70 MW.  The startup occurred in 1967.  In 1985 the reactor was decommissioned.

4 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 4 Brennilis marks the first dismantling of a complete nuclear power station in France. EDF and CEA announced intention to make a transparent process so that it can be used as a model for dismantling of other plants later. The process is divided into 3 phases: Phase 1 This phase was launched in 1985, similar to a refueling outage the fuel is moved to the spent fuel pool, but new fuel is not loaded, and the fuel on site is evacuated. Phase 2 Phase 2 started in 1997, consisting of: decontamination and disassembling of the buildings except for the reactor itself. evacuation of the nuclear waste. In 2005 phase 2 officially finished. Phase 3 Phase 3 which is currently underway, consist of: dismantling of the heat exchangers. dismantling of the Reactor pressure vessel (RPV) – ONET TECHNOLOGIES leader of consortium ONET TECHNOLOGIES/NUKEM TECHNOLOGIES. demolition of the containment (Reactor building).

5 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 5 The equipment is designed for operation in a chamber for treatment of radioactive waste (CDI) and will be installed in place in the Brennilis nuclear power plant in France. The equipment will perform specific operations and is designed to comply with the requirements of individual technical specifications prepared by consortium GМЕ (ONET TECHNOLOGIES/NUKEM TECHNOLOGIES).

6 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 6 The scope of work assigned to PMC by ONET TECHNOLOGIES is the executive studies, manufacturing, factory acceptance tests and delivery on site for following equipment: Elevator; “Renard” trolley; 5m 3 trolley; Characterization trolley; Hoisting devices and rack; Sorting table.

7 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 7 The main designing requirements are the following: Several types of packages (weight and dimensions); Interface with civil construction; Low speed for all movements; Operations in remote control; Maintenance of equipment; Life time of equipments; Operation in radioactive environment; High accuracy of positioning; Equipment to be designed in accordance with Machinery directive 2006/42 and FEM.1.001.

8 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 8 Lack of sufficient input data for the civil construction – considering the specific conditions due to the place of operation and considering the specific technological processes due to the functions of the whole system for treatment of radioactive waste it is necessary to modify and change the use of some areas of the reactor building. Difficulties with limited space – the tight equipment overall dimensions are predetermined by the limited space assumed for operation execution and incorporation of the systems in the design.

9 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 9 High dose rate – operation in environment with high ionizing radiation, protection of the equipment, endurance to frequent decontamination treatment, structure designed form units which are convenient for maintenance.

10 PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 DESIGN SOLUTIONS DEVELOPMENT OF THE DESIGN CONCEPTS IN COMPARISON TO THE ONET TECHNOLOGIES TECHNICAL SPECIFICATIONS

11 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 11 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

12 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 12 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 10 t Speed of movement 2 m/min Overall dimensions 2190 x 1600 x 16450 mm Platform dimensions 1450 x 1450 mm Platform height from the floor 860 mm Elevator is designed to carry three types of containers between four levels in the rector building.

13 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 13 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

14 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 14 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

15 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 15 “Renard” trolley performs transportation of three types of containers. The loading/unloading operations are performed by the trolley itself and are controlled from control room. Basic trolley “Renard” Load carrying capacity 10 t Nominal lifting capacity 5,5 t Lifting height 2250 mm Lifting speed 1 m/min Maximum traveling speed 4,47 m/min Rail span 1,2 m Trolley traveling distance 28,7 m Overall dimensions 3091 х 1430 х 2188 mm Small trolley “Renard” Load carrying capacity 10 t Lifting height 150 mm Lifting speed 0,13 m/min Traveling speed 3,76 m/min Trolley traveling distance 8 m Overall dimensions 1300 х 1340 х 365,5 mm Main technical characteristics

16 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 16 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

17 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 17 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 23 t Lifting height 103 mm Lifting speed 0,12 m/min Traveling speed 5 m/min Rail span 1,4 m Trolley traveling distance 22 m Overall dimensions 2555 x 1800 x 1291 mm The 5m 3 trolley is designed for operation with two types of containers: container 5m 3 and container R73.

18 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 18 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

19 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 19 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES The Characterization trolley is designed for operation with seven types of containers. Main technical characteristics Load carrying capacity 3 t Platform rotation speed 5 rpm Traveling speed 5 m/min Rail span 1,5 m Trolley traveling distance 4,7 m Overall dimensions 2151 x 1694 x 1524,5 mm

20 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 20 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Five hoisting devices are designed. Each hoisting device is designed for operation with a specific type of basket. The weight of the heaviest basket is 3 t.

21 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 21 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES The rack is designed for storage of these 5 hoisting devices and protection lid for auxiliary coupling mechanism intended for their attaching to the crane. ONET TECHNOLOGIES DESIGN

22 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 22 ONET TECHNOLOGIES DESIGNPMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES

23 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 23 PMC DESIGN IN COLLABORATION WITH ONET TECHNOLOGIES Main technical characteristics Load carrying capacity 1,6 t Dynamic loading of the grid 1 t Overall dimensions 1200 x 2270 x 600 mm The Sorting table is designed for containing the waste unloaded from the baskets OT and NUKEM.

24 International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 PARTNERS MAINT COMPANY LTD 24  The main control mode of the whole equipment during the process of nuclear reactor dismantling is intended to be from control room via Ethernet communication.  The reliable and synchronized operation of the devices is realized by utilization of contemporary technologies and concepts.  The equipment is also able to operate in maintenance mode and emergency mode during which the control is accomplished by local control panels.

25 PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011 THANK YOU FOR YOUR ATTENTION !