What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR-08-06656.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Checking & Corrective Action
[Organisation’s Title] Environmental Management System
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Environmental Management Systems An Overview With Practical Applications.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
FPSC Safety, LLC ISO AUDIT.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Genesis Solar Module Brochure ™
EHS Management System Elements
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Module 7: Construction Phase
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
1 Project Management, Support Functions, and Integration David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management.
HOW TO DO Pollution Prevention & Good Housekeeping NC STATE UNIVERSITY.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
WG3 Leader: Michelle Bush International Working Forum for Regulatory Supervision of Legacy Sites (RSLS) – Technical Meeting October 2013.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Construction Site Best Management Practices and the Project Design Process.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Stormwater Control & Design
Hazards Identification and Risk Assessment
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Lessons Learned from Past MS4 Audits 1/3/20161 Lessons Learned from Past MS4 Audits.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Using the MS4 Program Evaluation Guide 1/28/20161 Using the MS4 Program Evaluation Guidance.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
OHSAS Occupational health and safety management system.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Pollution Control: For Field Office Construction Sites.
Introduction to Energy Efficient Design
ODOT District MS4 Liaison Training: Why are we here?
Clinical Engineering Lecture (3).
Planning and BMPs for Large LUPs
Safety and Security- From Assessment to Implementation
Planning and BMPs for Capital Improvement Projects
Planning and BMPs for Capital Improvement Projects
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Construction Management Services April 16, 2018
Presentation transcript:

What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR

Background Los Alamos National Laboratory 40 sq. mi. DOE facility High altitude – ft asl Semi-Arid Climate –19” annual precipitation –45% in Jul-Sept High UV LA-UR

Background LA-UR Steep topography Mountain & high desert vegetation

Background Los Alamos National Laboratory Inspection Program NPDES Construction General Permit & Multi-Sector General Permit (Industrial) Sites Energy Independence & Security Act (EISA) requirements –> 5000 sq ft: maintain or restore pre-development hydrology Not an MS4 Year-round, ongoing construction –Linear projects, new facilities, D&D, environmental monitoring & remediation Over last 5 years: –Avg. 600 inspections per year LA-UR

Fundamentals To establish a well-functioning inspection program: 1.Inspectors need to both identify issues and work with others as a team to solve problems. 2.The basis for a successful teamwork approach is solid technical background in BMPs. 3.Inspectors must use BMP knowledge to effectively work with designers, contractors, and owners So… LA-UR

Fundamentals What do inspectors need to know about BMPs and how do they use this knowledge? –Roles & Responsibilities –Technical Background –BMP Issues –How to Interact with Others –Elements for Continued Success LA-UR

Roles & Responsibilities Designer: –Develops site design and possibly SWPPP –Designs drainage features, BMPs, and stabilization measures –Works to design standards/criteria –Communicates with the contractor and possibly with the inspector through the contractor LA-UR

Roles & Responsibilities Contractor: –Implements project design and SWPPP –Maintains day-to-day control of the site –Implements schedule and performs field changes –Installs and maintains BMPs –Communicates directly with the designer and inspector LA-UR

Roles & Responsibilities Owner: –Plans and executes facility budget –Implements new BMPs –Maintains existing BMPs –Implements preventative maintenance program –Adapts processes to new regulations –Communicates directly with the inspector LA-UR

Roles & Responsibilities Inspector: –Assesses and reports on SWPPP implementation and regulatory compliance –Identifies compliance problems in the field –Evaluates construction and post-construction BMPs –Works with contractor to solve problems and identify issues to be resolved by designer –Communicates directly with the contractor or owner and may communicate directly with designer LA-UR

Working Together Designer ContractorInspector Redesign BMPs if inspection shows not effective Interact to ensure BMPs correctly implemented Communicate BMP design changes and needs All three work together to ensure proper design and effectiveness LA-UR

Technical Background In-depth understanding of regulations General knowledge of hydrology Knowledge about the erodibility of soil types Understand vegetation establishment concepts How to read design drawings and details associated with the installation of BMPs Professional certification (i.e., CISEC, CMS4S) LA-UR

Technical Background Knowledgeable about BMP product types and features –Function, operational limitations, and maintenance requirements for BMP categories Staying abreast of new products and technology When learning about and evaluating BMPs, inspectors need to identify and consider the following: –Where was it developed? –Under what conditions was the performance data generated? –Has this product been used or applied under the site and climate conditions similar to my locale or site? LA-UR

BMP Issues LA-UR Designers lack knowledge and experience for adequate BMP design Designers not on site and aren’t aware of the field conditions. Maintenance requirements aren’t factored into the design Design drawings only identify final site conditions and BMPs at that phase

BMP Issues Contractors may have inexperience or indifference toward BMP installation and maintenance Contractors may be innovative with BMPs where no BMPs are specified or designed Designed or constructed BMPs are incorrect or inadequate LA-UR

BMP Issues Design-build projects can facilitate construction activity before grading, drainage, and BMP designs are fully finalized. Temporary BMPs are specified and utilized where permanent BMPs could be used. Communication can be a challenge with both contractors and designers. LA-UR

How to Interact with Others Be an effective communicator –Listen (2 ears & 1 mouth) Be able to identify deficiencies and problems with BMPs Specify or design BMPs only if you are qualified to do so LA-UR

How to Interact with Others Meet with contractors and designers to help correct problems Be used as a resource and work with others as a team Understand the contractor, owner, and designer’s perspective –Listen (2 ears & 1 mouth) LA-UR

How to Interact with Others What do you do when the specified BMPs are inappropriate or ineffective? Identify and report the issue Don’t redesign the BMP or mandate a specific alternative Identify the type of replacement needed Discuss the issues and alternatives with the contractor or owner and possibly the designer LA-UR

How to Interact with Others LA-UR How can you recommend, design, or redesign BMPs? Discuss potential options with the contractor/owner Assist the contractor with the Request For Information Has long-term maintenance been considered? Work with the designer to help identify solutions. Provide product and vendor information and data

How to Interact with Others If asked which specific BMPs should be used, what type of information should you provide? Specific BMP information if you know how it will perform with the site climate and conditions BMP options compatible to available contractor resources and product availability. Alternative BMPs if modifications cannot be implemented within the permit timeframes. LA-UR

How to Interact with Others If you have the qualifications to design BMPs, can you make recommendations to change a design without being liable? Work with the designer and contractor as they have been hired to complete their job within a set of conditions. Follow proper design protocol. Avoid designing in the field with little or no documentation. LA-UR

Elements for Continued Success Qualified inspectors Training – stay current Function as part of the team Establish & practice good communication –Listening (2 ears, 1 mouth) –Writing/documentation LA-UR

Summary At LANL we have learned that an inspection program is most successful when inspectors: Possess appropriate technical knowledge of BMPs Effectively interact and communicate with designers, contractors, and owners LA-UR