P5: UJ56 Relocation Study Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE

Slides:



Advertisements
Similar presentations
UJ56 Iron Shielding Attenuation M. Brugger (FLUKA Team)
Advertisements

Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
News and Introduction from CERN June 15th, 2005
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
CLIC Civil Engineering Update
Identification of the unused cables
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
East Hall under construction
Tunnel Cross Section Studies
Background B513 built in early 1970’s for mainframe era.
CMS Area Working Group Meeting
Helium spill in LHC tunnel
Accelerator and Experiment Interface Session: LS2, LS3
GIS Portal Racks Project
Review of UJ56 relocation options
Collimator Control (SEUs & R2E Outlook)
Extract from today’s talk given to DCB
RDR Baseline Layouts for Interaction Region
Presentation transcript:

P5: UJ56 Relocation Study Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE

Project overview and scope Current knowledge: → Expected levels of radiation in UJ56 are known → Shielding along the LHC side of the tunnel will not provide a long term solution to avoid single event upset in the electronics systems installed in the UJ56 → We cannot wait until the second long shutdown (~2014) without major risks to the electronics → Relocation of equipment has to be considered Purpose of study: → Identify what can be done during the next shutdown in 2012 → Identify potential showstoppers

What equipment is at risk? Gnd floor: Infrastructure electronics for EN-EL, EN-CV and GS-ASE S Maridor EN-MEF

Power converters 24 racks What equipment is at risk? S Maridor EN-MEF

→ First attempt – build a shielding wall on the tunnel side of the UJ56 → Initial assessment made in 2009 and presented on Feb 9 th Is there any quick fix?... No Shielding Effectiveness: - Ground floor: ~10 - First floor: ~2 Without shielding With shielding © R. Versaci et al.

→ Goal: Find a permanent solution to relocate the electronics currently in the UJ56 during the 2012 shutdown → Limitation: For some equipment the cable length is critical (compensators) → Priority: Racks located on the first floor should be taken care of first since they are the most vulnerable → Asset: CMS has offered to assist in finding space in its experimental area → Synergies: Opportunity to improve accessibility to equipment during operation Introducing the relocation effort

Proposal → Move sensitive equipment from 1 st floor and GND floor → Use the UJ561 personnel galley as much as possible → Choice of escape route for CMS/LHC personnel to be revisited → Use parts of the USC55 when needed → Use UL55 Bypass tunnel when needed

Scenarios → Common approach: use the UJ561 and USC55 S4 → 3 options for the CMS escape route → Scenario A: use space UL55 bypass tunnel in addition → Scenario B: use space in USC55 control room in addition S4 CTRL UJ561 UL55

Investing the space in UJ561 → Step 1: Assess what pieces of equipment need to move All power converters 17 racks Some racks will stay, others will be merged or eliminated

Investing the space in UJ561 → Step 1: Assess what equipment needs to move 5 Components of the safe room targeted for relocation in the UJ561

Investing the space in UJ561 → Step 2: suggest a layout Philippe Orlandi, JC Guillaume, N Dos Santos [EN-EL] Equipment organised by cable length limitations New safe room Rack Area Power converters Evacuating the UJ561 might require new openings to the Bypass

Investing the space in UJ561 RQX.R5 RTQX2.R5 RYCA01-02 GYPOS 01 à 03 DYPG01 & 02 CYCIP01 CYNET01EYC01 à 03 EYU01 – EYP01 RYMCB01 à 05 RYLB01 RYLC01 RYSC01 → Step 3: Assign location to equipment Philippe Orlandi, JC Guillaume, N Dos Santos [EN-EL]

→ Remarks: → If adequately equipped, UJ561 could be accessible through the USC55 at all times → Sectorisation scheme would have to be revisited → Space left between the power converters and the wall is ~1m. → Cooling will require demineralised water → Ventilation scheme would include fan coils with a chilled water link → New cable tray capacity will have to be found → Cable ducts to be created using coring techniques → Impact on the CMS escape route to be assessed Investing the space in UJ561

Insertion of service ducts through coring Cooled cables Ctrl cables DC Power cables Bottle neck Ø=350mm L<12m From 1 st floor

Alternative to study for water cooled cables Length ~ 15m, Ø=350mm Similar jobs were done between UA and RA UP56 UJ56 1 st floor 2 nd floor Insertion of service ducts through coring If excavation could start from bypass: Better for schedule Allows work in UP56 in parallel

→ Feasibility studies will have to be carried out by GS-SEM → Impact on neighbouring equipment to be assessed → Impact on overall schedule to be assessed Insertion of service ducts through coring

→ 3 options should be considered 1.Keep the CMS escape route going through the UJ561  Presence of flammable material  Small clearance between equipment and wall ~1m  Escape route would go through a safe room  No need for civil engineering  Identical to existing path CMS escape route – Option 1

→ 3 options should be considered 2.Use the UL55 Bypass as escape route  More complicated and longer escape path  Less favourable for ALARA (breezing of potentially activated air)  Limited need for civil engineering work  No need to enter the UJ561 CMS escape route – Option 2

CMS escape route – Option 2 J Bos PH-CMX New blast door

→ 3 options should be considered 3.Create a new escape gallery Width >1.2m Height=2.3m  Civil engineering work required for ~ 3 months  Insertion in PM56 to be defined  Shorter and safer escape route  Fully compliant with standard emergency routes CMS escape route – Option 3

UXC55 USC55 Pillar Wall UPX56 Shelter PM56 09/06/ UP56 UJ561 UJ561? A B C UJ56 3 routes considered at first Only limited tooling can be used CMS escape route – Option 3

CMS escape route – Option 3.a Formal request from CMS to consider a different position for the junction gallery The new gallery should not introduce any risk to compromise the classification of the USC55 as a non designated area Meeting with DG-RP (S Roesler) on Possibility that the new junction gallery could introduce RP risk in the USC55 No time to produce simulations before the workshop JP Corso EN-MEF

B CMS escape route – Option 3.b Services difficult to relocate

CMS escape route – Option 3.c CV equipment To relocate for R2E BRAN Gas Can be moved 6.92m J Bos PH-CMX

→ Connection of route3 inside the UJ56 allows keeping most of the services in place CMS escape route – Option 3.c J Bos PH-CMX

→ Remarks: → CMS would like route 3.c to become the baseline → Impact of CE work on the overall work sequence to be assessed → Where should the excavation start from? → How to remove the spoil? → How to ventilate the work site? → How to seal off CMS and sensitive equipment in the UJ56? CMS escape route Likely configuration of CMS during the 2012 shut down

Relocation in USC55 S4 TYCFL02 DYXF01 YYACS01RYSA CYCIB01 → Some rack users wish to group their electronics in the USC55 S4 Philippe Orlandi, JC Guillaume, N Dos Santos [EN-EL]

Relocation in USC55 S4 S Maridor EN-MEF Link between Bypass and USC55 is nearing saturation But should still be OK S4 area is part of the USC55 AUG network

→ In addition to the UJ561 and the USC55S4 area, the UL55 bypass would be used. Because of the existing cable trays, smaller racks would have to be used  Equipment installed there would not be available during operation  Using space for future upgrade projects  No need for additional CE work  Work in an area relatively empty Relocation scenario A

ERD1/56 EOD1/56 - EOD3/56 EBS1/56 - UPS machine QYC RYSA CYTIM01 – CYFRE01 Relocation scenario A Philippe Orlandi, JC Guillaume, N Dos Santos [EN-EL]

→ In addition to the UJ561 and the USC55S4 area, the USC55 control room area would be used  Need for new metallic structures  Need for 1 service duct (CE work) between UJ561 and USC55  Additional mixing of LHC/CMS networks (already the case in S4)  Equipment available at all times  Work on the metallic structures could be done during operation => no penalty for schedule  Space in Bypass remains available for future projects such as inner triplet upgrade  Synergies with CMS upgrade programs Relocation scenario B

LHC EL ROOM 6 LHC racks Relocation scenario B JP Corso EN-MEF

A second emergency exit has to be foreseen for the Evacuation of personnel in the new control room

→ Whatever scenario is chosen the UJ56 will still host some equipment → Radiation Hard or Radiation Tolerant → The space freed by the relocation will allow the erection of a shielding wall inside the UJ56, possibly with a roof → Such a wall might not be needed after all, depending on tests to be performed on EN-EL equipment at CNGS State of the UJ56 after relocation

State of the UJ56 after relocation Work method to be used to assemble the shielding wall still to be designed

ESD2/56 ESD3/56 ESD1/56 Commutation et distrib. 48 Vdc Chargeurs et bat. 48 Vdc 4 racks patch pannel Tabl. HT 18 kV Transfo 18/.4 kV EBD1/56 EBD2/56 EAD1/56 Ep. 1 m State of the UJ56 after relocation Philippe Orlandi, JC Guillaume, N Dos Santos [EN-EL]

State of the UJ56 after relocation → During relocation work, essential services would be powered through temporary switchboards installed on the 1 st floor of the UJ56 Space left free by relocation of Power Converters

State of the UJ56 after relocation → Should all equipment in the safe room be made radiation tolerant or be relocated, substantial cost saving would be made on both the inner and outer shielding of the UJ56

Remaining issues to study → Installation/construction methods and impact on schedule/cost → Shielding wall → CE work gallery/ducts → CV work (Water cooling and ventilation) → Cable tray capacity → Impact of work on CMS & LHC (loss of services, dust..) → Requests of a few racks owners

Very first draft time estimates Time window for CE and shielding work Total EN-EL work ~ 14.5 MonthsCE gallery ~ 3 months

Very first draft time estimates → Once the work methods will have been designed, opportunities to work in parallel could emerge. → Many pieces of information are still missing. This prevents the design of a reliable schedule. → It looks reasonable to assume that the work could not take less than 15 months.

Very first draft cost estimates → EN-EL work: ~ CHFM2.3 → Not including work to be done by other service groups contributing to the relocation of EN-EL equipment → GS-SEM work: → Escape gallery: < CHFM1 → Service ducts: CHF4,000/m → E.g: 15m link between UJ56 and bypass = CHF60,000 → Costs of fire doors, smoke detection, metallic structures, cooling and ventilation, re-commissioning still not assessed

Summary → The relocation program at point 5 is a major undertaking. → It will remain a cross department effort → It will be a multimillion CHF project → It will be difficult to fit it into a 1 year shutdown → Many pieces of information are still missing → Defining a baseline scenario is urgently needed to focus the few resources available on detailed studies

CERN, February 9 th Extended R2E Seminar & Workshop Preparation CERN, February 9 th Extended R2E Seminar & Workshop Preparation F. DELSAUX ENVIRON 18 M HT LIBRE 2600 mm CHICANE UJ R562 VERS UJ56 VERS UJ57 UJ56 Shielding Option 46

CERN, February 9 th Extended R2E Seminar & Workshop Preparation CERN, February 9 th Extended R2E Seminar & Workshop Preparation BLINDAGE UJ56 MUR FIXE ACIER HAUTEUR 2000mm COMPLEMENT BRIQUETTES ACIER HAUTEUR 600mm BLINDAGE ACIER DEMONTABLE EP. 400mm HAUTEUR 2000mm MONORAIL RAIL DE MANUTENTION DES BLOCS DE BLINDAGE 300mm 800mm 300mm 400mm xz view UJ56 Shielding Option F. DELSAUX 47 Added shilding

CERN, February 9 th Extended R2E Seminar & Workshop Preparation CERN, February 9 th Extended R2E Seminar & Workshop Preparation xz view UJ56 Shielding Option Assuming 1 year of operation at nominal luminosity (100 fb -1 ) Shielding Effectiveness: - Ground floor: ~10 - First floor: ~2 Upstream weak-point could be improved, so could be the maze … BUT 48 © R. Versaci et al.

CERN, February 9 th Extended R2E Seminar & Workshop Preparation CERN, February 9 th Extended R2E Seminar & Workshop Preparation Assuming 1 year of operation at nominal luminosity (100 fb -1 ) Shielding Effectiveness: - Ground floor: ~10 - First floor: ~2 w/o shielding UJ56 Shielding Option with shielding 1 st Floor-Shielding can hardly be improved -> First Floor Critical 49 © R. Versaci et al.