COMMERCIAL ELECTRICAL (Chapter 11)

Slides:



Advertisements
Similar presentations
Control Circuit Protection Supplementary Protectors vs
Advertisements

UNIT 31 HOME ELECTRICAL SYSTEM
Electrical Installation
Chapter 12 Transformers. Chapter 12 Transformers.
10 The Service Entrance. 10 The Service Entrance.
28 Residential Electrical Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the characteristics.
Master Examination Practice Drill # Ted “Smitty” Smith.
DAY 4 CHAPTER 3 CONDUCTOR SIZES,TYPES, ETC.. Continuous Load. A load where the maximum current is expected to continue for 3 hours or more. Continuous.
Chapter 2 ELECTRICAL POWER SUPPLY AND DISTRIBUTION IN BUILDINGS
EET Survey of Electronics
Electrical Power Systems
Master Examination Practice Drill # O Where a hotel has a stationary electric sign installed inside a decorative fountain, the sign shall be at.
Hazard - Inadequate Wiring
Master Examination Practice Drill # (16) O 1. In commercial and industrial establishments, all 15- and 20- ampere, single-phase, 125 volt receptacles.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Engineering Practice Electric Fitting Resistance Electrical resistance is the ratio of voltage drop across a resistor to current flow through the resistor.
Electrical Principles and Wiring Materials
Area of Study 2: Electricity
Objectives Review electric circuits and electricity pricing - Introduce HW5 Select conductor and conduit List electrical devices.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
MINIMUM ACCEPTABLE LEVELS OF SAFETY & RELIABILITY
Electrical Power Systems
Calculation Speed Drill # NEC
ELECTRICAL BASICS (Chapter 8) Electrical terms Electricity & magnetism Electricity Circuits Magnetism Electrical units Electric potential or eletromotive.
Section 3 Basic Electricity and Magnetism
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
Objectives Finish residential electrical systems Solve some example Compare electrical systems for residential and commercial building.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
Quiz in Progress 1)Homework 1 was? Easy Hard Easy except for problem 1
Ag. Mechanics for Beginning Teachers
SERVICE ENTRANCE EQUIPMENT
Chapter 6 Lesson 2. How can electricity flow? When an object gains of loses electrons, it has an electric charge. Similar to magnetic force, unlike charges.
ELECTRICAL INSTALLATION IN BUILDING
Starting Residential Wiring.  The most important element in wiring. Safety is proper grounding.  Grounding is the connection of all parts of a wiring.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
Installation of Heating, Cooling, and Refrigeration Systems Electricity for Refrigeration, Heating and Air Conditioning 7th Edition Chapter 8 Installation.
SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 12 BASIC ELECTRICITY AND MAGNETISM.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
ELECTRICAL INSTRUMENTS ( service and utilization )
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
Chapter 4 Electrical Systems and Protection Chapter 4 Electrical Systems and Protection.
HNC/D Engineering Science
License Examination Practice Drill
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
Smitty’s Two Minute Drill Overcurrent Protection
Smitty’s Two Minute Drill Mixed Content -05
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Engineering Project Cable Management.
Calculations: Transformers and Service Conductor Calculations
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
The Safe Use of Electricity
Conductor A material, such as copper, that permits the flow of electricity; usually refers to the a wire.
EET 323 – Electrical System Design Lecture 6: Conductors and Over-Current Protection Radian Belu, PhD.
Electric Charge Electric Charge Rules:
Objectives Learn about Electricity Pricing Electric systems.
Objectives Learn about 3 Phase vs. 1 phase F&N vs. 1 phase F&F
Objectives Review conductor and conduit selection
Objectives Finish Transformers Introduce HW5 (Pricing)
Smitty’s Two Minute Drill Varied Number 7
Calculations Review Drill
Calculation Speed Drill Varied-1
Presentation transcript:

COMMERCIAL ELECTRICAL (Chapter 11) Conduit Pathway for wiring that protects conductors Types Aluminum Plastic Fittings Size (additional information) Depends on number of conductors Minimum: ½”

COMMERCIAL ELECTRICAL (Chapter 11) Conductors Types Copper Aluminum Conductor size (additional information) lower sizes are designated by AWG (40 to 0000) higher sizes are designated by MCM (250 to 2000). cross-section of a conductor is calculated in circular mils (CM or cmil) a circular mil is the area of a circle 0.001 inch (0.001 in = 1 mil) in diameter cross-sectional area of round conductor is found out by squaring its diameter expressed in mils cross-sectional area of a conductor 0.005 inch in diameter would be 5 x 5 = 25 cmil.

COMMERCIAL ELECTRICAL (Chapter 11) Conductor Insulation (additional information) Letter designators T = thermoplastic R = Rubber H = heat resistant W = moisture resistant N = nylon reinforcing

COMMERCIAL ELECTRICAL (Chapter 11) Installing conductors Special conduits Cable tray Busway Raceway Under floor duct

COMMERCIAL ELECTRICAL Conductor ampacity (additional information) current carrying capacity of a conductor affected by the size of a conductor max. permissible insulation (operating) temperature ambient temperature Circuits Lighting circuits (additional information) Generally protected with 20 A circuit breakers Feeder circuit Circuit between a service panel or main panel and an OCPD in a sub-panel protecting a branch circuit Branch circuit Circuit between an OCPD and utilization equipment (i.e. an equipment that receives power through the circuit) Power circuits (additional information) For motors, electrical equipment, receptacles Dedicated circuits and UPS

COMMERCIAL ELECTRICAL Panels Receives the service electricity and distributes it to branch circuits Lighting and power panels (additional information) Required to sub-divide and protect individual circuits Contains circuit breakers Bus bars in panels facilitate connection of individual circuit breakers If there is more than one panel board, then the one receiving the supply from the service entrance may be termed as the main panel (service panel) and other panels that receive supply from this panel may be termed as sub-panels number of circuits required in the building determines the size of a service panel number of circuits to be fed by a sub-panel determines its size the panel(s) may either be surface-mounted or recessed and should be conveniently located for easy servicing and resetting of circuit breakers or fuses Switchgear

COMMERCIAL ELECTRICAL Services (additional information) Electric service: overhead service drop underground service lateral 3-phase services Three hot phase conductors and one neutral conductor The neutral only carries unbalanced load for a 3-phase connection Delta configuration: for industrial application Wye configuration: for office buildings and shopping centers In wye systems, phase-to-phase voltage is √3 or 1.73 times the phase-to-neutral connection

COMMERCIAL ELECTRICAL Transformers (additional information) Used for stepping up or stepping down AC voltages and current Available in single- or three-phase type Capacity is rated in kilovolt-amperes (kVA) Capacity of a three-phase transformer for a load of 500 A at 480 V = 500x480x1.73 = 415200 VA = 415.2 kVA Voltage coming into a transformer from a generating plant is the primary voltage, and voltage leaving the transformer is the secondary voltage Transformers operate on the principle of magnetic induction Coils are wound around a common silicon steel core Voltage is induced from primary to secondary due to magnetic induction The ratio of secondary (Vs) to primary (Vp) voltage is equal to the ratio of secondary (Ns) to primary (Ns) winding turns of the coils (i.e. Vs/Vp = Ns/Np).

COMMERCIAL ELECTRICAL Service capacity Service size Service disconnects (main disconnect) Rated in amperes Meter (additional information) required for registering the amount of energy consumed always installed electrically ahead of main disconnect

COMMERCIAL ELECTRICAL (Additional information) Overcurrent protection device (OCPD) a protective device that automatically cuts off power supply to any circuit, which is overloaded or short-circuited may either be a (1) fuse or a (2) circuit breaker The overcurrent protection devices are installed within the panel boards A fuse is a self-destructive device (containing a fusible link) that melts upon sensing an abnormal current and opens the circuit in which it is installed. It is rated in amperes. A circuit breaker acts both as an OCPD and a switch. It consists of a thermal trip that opens the circuit when there is high temperature build-up inside the CB (usually due to overcurrent), and a magnetic trip that provides short-circuit protection. A CB is also rated in amperes

COMMERCIAL ELECTRICAL (Additional information) Receptacle (convenience outlet) a contact device installed at an outlet for connection of an attachment plug used for plugging in lights and small appliances Grounding Systems grounding: Connecting neutral wire of wiring systems to earth. It establishes a neutral wire at zero potential for safety and reference Equipment grounding: Connecting all non-current carrying metal parts of wiring system to the earth

ELECTRIC WIRING DESIGN (Additional information) Electrical load Lighting HVAC Plumbing and sanitary Elevators Kitchen equipment Miscellaneous (e.g. computers, convenience outlets, etc.)

ELECTRIC WIRING DESIGN (Additional information) Available system voltages 120 V single-phase 120/240 V single phase 120/208 V single phase 120/208 V three-phase 277/480 V three-phase 2400/4160 V three-phase

ELECTRIC WIRING DESIGN (Additional information) OCPD must be placed on all ungrounded conductors all 'hot' wires are ungrounded Branch circuit design must be designed for load connected to it + expected load expansion. conduit sizes must be a minimum of 1/2". a general-purpose branch circuit should be 20 A and wired with #12AWG wire. Circuit load should not be 64% (@ 25% expansion) for lighting loads

ELECTRIC WIRING DESIGN (Additional information) What is meant by % load and % expansion? A 20 A branch circuit @ 120 V, single phase may carry an electrical load of 20x120 =2400W. A general purpose branch circuit is not allowed to carry more than 80% of this quantity, provided no future expansion of load is envisaged for this circuit (i.e. 0% expansion) Usually an expansion of 25% of current load is envisaged for a general purpose branch circuit. Under such circumstances, the actual load of a circuit shall not exceed 64% of the load it may carry theoretically. In case of a 20 A, 120 V single-phase circuit, this load would be 2,400X0.64=1536 W (say, 1500).

ELECTRIC WIRING DESIGN (Additional information) For small offices, there should be one receptacle/40 sft. for first 400 sft. subject to a minimum of one receptacle for every 10 lft. of wall length One receptacle per 100 sft. for area in excess of 400 sft. There shall not be more than 6 receptacles to a 20 A circuit in an office. Corridors should have a 20 A, 120 V receptacle every 50 ft. Each receptacle is counted as 1.5 A (180 W). Receptacles behind a counter top shall be 4 ft. o.c. Provide a min. of 2 circuits @ kitchen counter Do not connect more than 4 small appliances to a 20 A circuit. Calculate lighting load @ 125% of actual value. Provide GFCI type receptacles in bathrooms and outdoors. Allow 25% spare circuits based on number of poles and load. Allow 25% spaces based on number of poles. Calculate spare circuit loads @ the average value of the active circuit loads