Beyond T&E Jack Ring Educe llc Presentation to Enchantment Chapter, INCOSE April 10, 2013 Certified for Public Release. Is that system still Fit For Purpose?

Slides:



Advertisements
Similar presentations
Training and Education
Advertisements

Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Chapter 5 Transfer of Training
Presentation Title | Date | Page 1 Extracting Value from SOA.
Introducing Instructional Expectations
©2011 1www.id-book.com Evaluation studies: From controlled to natural settings Chapter 14.
OWASP CLASP Overview.
No 1 IT Governance – how to get the right and secured IT services Bjorn Undall and Bengt E W Andersson The Swedish National Audit Office Oman
1 System Engineers Toolbox 1 Compliance Automation, Inc. INCOSE: NM Enchantment Chapter By Cheryl Hill August 12, 2009.
Systems Security Engineering An Updated Paradigm INCOSE Enchantment Chapter November 8, 2006 John W. Wirsbinski.
Introduction to Product Family Engineering. 11 Oct 2002 Ver 2.0 ©Copyright 2002 Vortex System Concepts 2 Product Family Engineering Overview Project Engineering.
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Strategic Planning & New Activity Development September 2013.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
1 When DAP Meets GAP Promoting Peaceful Coexistence between Developmentally Appropriate Practice & the Need to Address the Achievement Gap International.
Sensor Web Enablement and GEOSS Presented by: Terence van Zyl.
Multimission Ground Systems & Services MOS 2.0: A View of the Next Generation in Mission Operations Systems Duane L. Bindschadler, Carole A. Boyles, Carlos.
Page 1 Copyright © 2010 Data Access Technologies, Inc. Model Driven Solutions May 2009 Cory Casanave Architecture of Services SOA for E-Government Conference.
Presented to: By: Date: Federal Aviation Administration Registry/Repository in a SOA Environment SOA Brown Bag #5 SWIM Team March 9, 2011.
1 2 nd Shanghai, 19/02/06 Architecture for Next Generation Grids Kostas Tserpes, NTUA Shanghai, 20th of February 2006.
Universität Innsbruck Leopold Franzens Copyright 2006 DERI Innsbruck LarCK Workshop, ISWC/ASWC Busan, Korea 16-Feb-14 Towards Scalable.
Cyber Defence Data Exchange and Collaboration Infrastructure (CDXI)
1 © Development Dimensions Intl, Inc., MMV. All rights reserved. 1 Succession Planning Overview STATE ACTION FOR EDUCATION LEADERSHIP PROJECT Follow-up.
Illinois Department of Children and Family Services, Pathways to Strengthening and Supporting Families Program April 15, 2010 Division of Service Support,
Career and College Readiness Kentucky Core Academic Standards Characteristics of Highly Effective Teaching and Learning Assessment Literacy MODULE 1.
Assessment Literacy Kentucky Core Academic Standards Characteristics of Highly Effective Teaching and Learning Career and College Readiness MODULE 1.
1 Facilitating Restorative Group Conferences Lesson 5: Further Development of Conferencing Skills Minnesota Department of Corrections with the National.
Making the System Operational
Gaining Senior Leadership Support for Continuity of Operations
Performance Management and Appraisal
1 SESSION 5- RECORDING AND REPORTING IN GRADES R-12 Computer Applications Technology Information Technology.
1 Kentuckys Public Safety Awareness Initiative Program Coordination and Partnerships August 23, 2005.
Configuration management
Chapter 7 Process Management.
IBM Corporate Environmental Affairs and Product Safety
Change Management Overview. 2 Objectives Overview of the change management approach Clarity on how the tools support the change approach Apply the change.
CCHSA Accreditation: New Standards for Managing Medications
best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
Chapter 5 – Enterprise Analysis
A Roadmap to Successful Implementation Management Plans.
Leadership and Strategic Planning
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Testing Workflow Purpose
1 Elevators, Airbags & FM Radio Communication Planning Innovation and Next Practice Division (DEECD) Design Teams Professional Development Workshop February.
1 INCOSE Chesapeake Chapter Enterprise SE Panel Discussion L. Mark Walker/LMC 21 March 2007.
Goals of Workshop District Education Technology Plan Goals 8 goals aligned to State/National Education Technology Plans Strategies to meet challenges.
Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
Component-Based Software Engineering Main issues: assemble systems out of (reusable) components compatibility of components.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Chapter Two Company and Marketing Strategy
IS-700.A: National Incident Management System, An Introduction
How to commence the IT Modernization Process?
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
The 20th International Conference on Software Engineering and Knowledge Engineering (SEKE2008) Department of Electrical and Computer Engineering
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Software processes 2.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 27 Slide 1 Quality Management.
Lecture 5: Requirements Engineering
The Rubric Reality Cobb Keys Classroom Teacher Evaluation System.
CUPA-HR Strong – together!
25 seconds left…...
We will resume in: 25 Minutes.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
05/19/04 1 A Lessons Learned Process Celebrate the Successes Learn From the Woes Natalie Scott, PMP Sr. Project Manager.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
1 Cloud Computing Prof. Ravi Sandhu Executive Director and Endowed Chair April 12, © Ravi Sandhu World-Leading.
© Prentice Hall CHAPTER 11 Facilitating User Computing.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Systems Engineering in a System of Systems Context
Presentation transcript:

Beyond T&E Jack Ring Educe llc Presentation to Enchantment Chapter, INCOSE April 10, 2013 Certified for Public Release. Is that system still Fit For Purpose?

You dont know Jack 1955 – Present. Proctor: College Physics Lab System Test & Evaluation (Atlas ICBM Radio Guidance System) System Engineering (State-determined Stochastic Non-deterministic Systems). Inaugural chair, GE-wide workshop on Software Engineering More than 50 systems, most including humans as active components. Involved Newbies, Crossovers, Remedial cases, Geniuses and wonderful Mentors. GE 20, Honeywell 10, Edelbrock 3, Ascent Logic 2, IBM OTP 1. Tutorials, Papers and Panels; INCOSE, INCOSE IL, ITEA, ICSEng, ISSS, IEEE SMC, IEEE SysCon, NIST. Co-chair, INCOSE WGs for – Intelligent Enterprises, – Motor Sports as learning environment, 2008 – – Autonomous Systems T&E, Kennen Technologies LLC, OntoPilot LLC, Educe LLC. ? 2

Measure Range, Azimuth, Elevation, Udot, Vdot, 20/sec Apply corrections, e.g. refraction Predict impact if thrust continues t+0.05 seconds Predict uncertainty of Impact prediction (size of red ellipse) ? Issue abort command? Real-time Range Safety MOE = P(injuring indigenous native) < > 250 launches of Atlas, Titan, Minuteman I & ZERO DEFECTS. ? 3

Example F4P ConOps Anticipated Engagement 6 System Realization & Resilience Inventory of Components Effects Capabilities MOEs Operational System Engineering 3 Acquisition Phase Application Knowledge Base Problematic Situation 1 Operators e.g., Warfighters F4P? 7 Y N 4

System Operators Deserve To Know POSIWID: the purpose of a system is what it does, regardless of designer or operator intent. 5 The Mean Time to Configuration Change of a brigade-scale system or $ billion/yr. industrial supply chain may be < 15 minutes. Is This System Still F4P? F4P is not Proof of Correctness, IV&V, or Live, Virtual, Constructive

Current T&E Shortfalls Goal: Sufficient user knowledge and trust regarding the dynamic and integrity limits of multi-node networks of heterogeneous, autonomous systems. Status: The T&E we know, teach and practice a) Finds only errors, not all faults, not limits. b) Is 10X – 100X too expensive and time consuming Talent: T&E community competencies have dwindled toward instrumentation and data technicians, e.g., which of you are fluent in Design of Experiments? Scenario Generation? Mission Effects Evaluation? Data Visualization? Remediation: The current recipes for system engineering and system of systems engineering do not provide for adequate, accurate and timely T&E and Fit For Purpose Readiness Assessment. 6

Our Opportunity X Better, Faster, Cheaper Fit 4 Purpose Effects, Modes, Limits Design of Experiments Test System Design/Architect Test Readiness (Preclude Aborts) Blue Force Red Force Grey Force Green Force Necessary and Sufficient Cadre of Systemists

Key F4P Principles 1)Systems exist only when deployed and activated. 2)Effects & Capabilities > Requirements and Functions. 3)Orchestration of N self-adapting systems. 4)The dynamic and integrity limits of any system are determined by a)Progress properties: starting from some state reach a desired state in a finite number of steps. b)Safety properties: maintain invariants that ensure correct progress. 8

Anticipated Engagement Dimensions --- E = Extent: # of cognates V = Variety: # of unique cognates, semiotic and temporal A = Ambiguity: fog, conflicting data, indeterminate context. Cognitive Overload Underconceptualization Ring, J., Modeling a Systems Engineering Enterprise, 2007 Conference on SE Research, Hoboken, NJ Low Medium High E V A 9 Classic T&E IV&VT Readiness Assessment

Extent

- - - Variety

- - - Ambiguity p- content/uploads/2011/02/Mazein MyMind.jpg Cognitive Overload indeterminant systems territory 12

The High EVA Case Low Medium High E V A 13 Agile, indeterminate enemy operating multi-node networks of heterogeneous, autonomous systems. Tens to hundreds of asynchronous changes by system administrators.

Necessary and Sufficient Systemists c)Executable models enable system composition. d)Ensures requisite information is provided by acquisition programs. e)Accelerates co-learning of all involved. 14 a)Conduct person expeditions that implement ConOps. 3X100 day cycles. 20 teams in five years. b)Adept at all degrees of Extent, Variety, Ambiguity.

Work Program of Complexity, WPOC Discovery: Resolution: Diagnosis is done by an experienced individual professional, who iterates with the group until the description is fully understood and accepted. UNDERSTANDING COMPLEXITY: THOUGHT & BEHAVIOR, 2002, A HANDBOOK OF INTERACTIVE MANAGEMENT, 1990/1994, Implementation is carried out by whatever means the design specifies. Description is done in a group process. focus on problematic situation and underlying problem system. Design is done in a group process. involves both formal logic and behavioral pathologies. 15

Model-based SE v.2 Intended: Emergence & Prevention of Emergence The truth, the whole truth, and nothing but the truth. Informatics Thermodynamics Biomatics Teleonomics Social Dynamics Economics Ecologics Model must be directly executable. based on a formal ontology. reflexive. Minimal Implicate Order 16

Confirm Coherent Change X, d(X)/dt, d 2 (X)/dt 2 Thermodynamics: mass, momentum and energy Informatics: data, information and knowledge Teleonomics: skills, rate of learning, and rate of invention Human social dynamics: trust, enthusiasm, co-evolution Economic: Investment, ROI, Liquidity Ecology: Waste, Fads, Unintended Consequences Within Dynamic and Integrity Limits Adjust: Gradients on relationships Arrange: Pattern of relationships Co-align: Content of system with context and resources. Copies permitted with attribution

Design for Prevention Precludes Unintended Consequences 18

Interoperability of Systemists RelationshipMeaningMediators Co-evolve Morphing toward Win-Win-Win Joy-enabled Level of Consciousness Co-facilitate Value Out/Value In e N Stewardship by N participants Co-learn Meaningful reflectionShared knowledge claims Collaborate Help one anotherDesire to serve Co-celebrate En-joying one anotherTime & Space, F2F Cooperate Compatible ActionsWilling to wait Commit Principled relationshipCourage to plan Converge Common compelling purpose Shared self-respect Communicate Share interests and valuesCommon language Connect Two discover one anotherAccessible attributes 19

Beware of Re-use?

Readiness Assessment 1)Ensure Acquisition a) describes progress properties and safety properties of components and b) Includes sufficient self-test of their systems. 2)Leverage new technology to automate System Integrity Assessment. c.f., Fellows Issue #3, INCOSE INSIGHT, June, 2010 c.f., System of Systems Readiness Assessment, The T&E of System of Systems Conference, ITEA, 1/24/2012, El Paso, Texas 1)Apply from Day 2 of a new project through Year N of the system usage/evolution cycle. 21 T&E IV&V

Readiness Assessment Benefits 1)Fit For Purpose: Continuous Estimate across multiple engagement scenarios. 2)Software problems: Reduced by > 100-fold 3)System Integration cost/time: Reduce 80%. 4)Test aborts: Reduce 40% of T&E costs. 5)Cybersecurity: Reduce vulnerability. 6)T&E of dynamic and integrity limits: Inform Design of Experiments. 22

Outlook 1)Effective in at least defense, aviation, homeland security, industry supply chains, knowledge discovery/vetting networks, and human activity systems. 2)Free. Return >> Investment. 3)Initial cadre of next generation of systemists. 23

Remember --- The Readiness Assessment challenge concerns both the fielded system and the whole realization system. 24 Anticipated Engagement 6 System Realization & Resilience Inventory of Components Effects Capabilities MOEs Operational System Engineering 3 Acquisition Phase Application Knowledge Base Problematic Situation 1 Operators e.g., Warfighters F4P? 7 Y N

8/21/12Educe LLC25 Clarifications? Questions? Comments? The castle, Jack, besiege the CASTLE! Thank you!