GLAST LAT Project ACD CDR Jan 7-8, 2003 1 Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Advertisements

GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Particle Physics and Astrophysics (PPA) Mechanical Engineering Ken Fouts.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectSept 3, 2003 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator Assy1 GLAST Large Area Telescope: Mechanical.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Overview.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT ProjectPMT Procurement Review May 24, 2002 AntiCoincidence Detector Design Overview 1 GLAST Large Area Telescope: AntiCoincidence Detector (ACD)
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Gamma-ray Large Area Space Telescope
Integration and Test GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope
Introduction and Overview
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical Ground Support Equipment Thomas E. Johnson, ACD Instrument Manager (301) NASA Goddard Space Flight Center Gamma-ray Large Area Space Telescope

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment MGSE Requirements  Provide safe methods to lift, move, position, and transport the Instrument  Design and test per NASA requirements  Design MGSE to be compatible in all Integration and Test (I&T) areas  Design loads to incorporate worst case static weight and Center of Gravity (CG)  Design factors of safety are 5:1 for ultimate and 3:1 for yield  Proof test factor of safety 2:1  Meet contamination requirements of cleanrooms and Thermal Vacuum Facilities  Position and support the ACD as required during all tests  Provide adequate access to integrate and test all components  Lifting sling requirements  No critical welds  Meet stability requirements  Proof test annually  NDE on all lifting hardware  Components color coded or tethered to prevent interchangeability ACD-REQ-7002, ACD MGSE Requirements General Requirements Summary

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment MGSE Overview Specific Pieces of MGSE Multi-Purpose Lift Sling ACD/BEA Dolly TSA Dolly Multi-Purpose Test Fixture Rotation/Tilt Device Templates Mass Simulators ACD Shipping Fixture Micrometeoroid Shield/Thermal Blanket Mockup

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment Multi-Purpose Lift Sling Basic Requirements –Lift TSA, BEA, and ACD 4-leg lifting sling with spreader bar Using existing spreader bar corner fittings from a SMEX lift sling Lifting below center of gravity –Stability analysis shows lift to be stable ACD Lifting Configuration Lift Fitting (4 corners) Upper bridle Spreader Bar

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment ACD/BEA Dolly Basic Requirements –Provide transportation of BEA and ACD during I&T –Make four sides and interior of ACD easily accessible for integration and test. –Support both the BEA and ACD –Flatness shall emulate the LAT interface (i.e. LAT Grid) Located 3 dollies that would be suitable for our use with minor modifications –2 GLAS Dollies –Swift Dolly GLAS Dolly

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment TSA Dolly Basic Requirements –Provide transportation of Shell and TSA during I&T –Make four sides and interior of ACD easily accessible for integration of Tile Detector Assemblies One of the three dollies located will work as the TSA Dolly Interface to shell flexures needs to be designed –Similar design as shell template

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment Multi-Purpose Test Fixture Basic Requirements –Vibration fixture Simulate the LAT Grid mechanical interface –Thermal Vacuum Fixture Simulate LAT Grid temperatures using thermal control Simulate LAT Tracker thermal boundary conditions by using radiative temperature controlled panels –Support the ACD during rotation and tilt operations Status – Requirements defined, design not started Tilt 90 degrees

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment Tilt/Rotation Device Basic Requirements –Tilt the ACD 90 o Required to maximize cosmic ray muon flux normal to the side TDA’s –Rotate 360 o about the Z-axis while tilted 90 o Enables full coverage on all 4 sides Status – Ransome table ready for use, interface fixture (i.e. Multi-Purpose Test Fixture) required ACD shown tilted 90 o Use existing hardware –Ransome Table Model 100P Ransome Table shown with GLAS Engineering unit installed

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment ACD Mass Simulators & Templates Mass Simulators Required –Tiles For ACD Mech. Verification Testing –Electronics Chassis Assembly For ACD Mech Verification Testing –ACD For ACD Shipping Qualification Templates Required –Shell Also used for Shell Flexures –BFA Two places –For Shell Flexure Attachments –For BEA Corner I/F to LAT

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment ACD Shipping Use Existing Hardware from GLAS project GLAS BAP Designed for a 300 kg payload Load isolation system included Very easy to use – Does not require hazardous operations Roll onto truck, raise casters, tie down and go Bag and Nitrogen purge ACD during shipping Transport via environmentally controlled air-ride trailer GLAS BAP with Load Isolation System (shown during load testing) GLAS BAP installed in trailer (shown during road testing)

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment Micrometeoroid Shield/Thermal Blanket Mockup Use existing ACD Mockup as a template to build the Micrometeoroid Shield/Thermal Blanket (MS/TB) All MS/TB attachment points to be simulated ACD Mockup

GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment MGSE Summary Extensive use of existing hardware will save the ACD both cost and schedule Requirements fully defined Design and Analysis needs to be completed MGSE will be ready when required