Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.

Slides:



Advertisements
Similar presentations
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
Advertisements

WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
1 Network Packet Generator Characterization presentation Supervisor: Mony Orbach Presenting: Eugeney Ryzhyk, Igor Brevdo.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
Term Paper – CSC 557 “Contemporary Software Development Using Cloud Resources” By: Richard Appiah.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Stephane Deghaye (AB/CO) ATC/ABOC days.
MRF & Cosylab on timing system: integration support Joze Dedic the best people make cosylab … Head of Hardware.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
NAos new Analog observation system Stephane Deghaye AB/CO/FC section meeting 22 January 2003.
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Controls renovation workshop Standardized Hardware Modules Javier Serrano, AB-CO-HT MJD
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
ICALEPCS 2007 The Evolution of the Elettra Control System The evolution of the Elettra Control Sytem C. Scafuri, L. Pivetta.
Experimental Areas Controls Review  AB/CO Viewpoint Vito Baggiolini (on behalf of the CESAR team and several people in CO)
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
Questions & Answers. Why we choose the CAN? Why not MAN? Measure of confidence IT university (KTH) would reflect to Telia (proof of concept) If failure.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
CLIC NI Acquisition and Control Module update CLIC Module Working group meeting Adriaan Rijllart EN-ICE-MTA.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
AB-CO Review Controls for BDI
Software and Communication Driver, for Multimedia analyzing tools on the CEVA-X Platform. June 2007 Arik Caspi Eyal Gabay.
V4.
SPS Applications Software issues - startup in 2006 and legacy problems
CONS and HL-LHC day Analysis of needs from BE-CO
Controls & software Andy Butterworth.
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Injectors BLM system: PS Ring installation at EYETS
The Software Framework available at the ATLAS ROD Crate
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Photon beamline crates
Presentation transcript:

Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard

Controls renovation WorkshopFE Software 2 Agenda Motivations Work Packages –Scope –Objectives –Budget & Human Resources –Some issues Conclusions

Controls renovation WorkshopFE Software 3 Motivations Replace all legacy Front-End software by FESA for all systems (unless short-lived) –Justified by loss of knowledge on GM or SL- Equip and by missing features required by upper layers (‘Notify’, cycle stamp…) Integrate new HW boards (on new PC platform, or replacing old VME boards) – cf J.Serrano’s talk

Controls renovation WorkshopFE Software 4 Scope Front-end GM classes implemented by CO in PS complex and which are not taken over by other equipment groups due to: –Their general use (with Std CO boards) –System responsibility is inside CO (Timing, Video, Oasis…) –Or no software competence exists in the equipment group (to negotiate…) (responsibilities: cf CO3 meetings & ) SPS legacy FE SW under CO responsibility ( Equipment Bus, generic data modules on gpsbax…) which needs to be kept for more than 2 years New FESA classes supported by CO ( new hardware ) NB: Excludes central timing generation sw (other project)

Controls renovation WorkshopFE Software 5 Existing GM classes in PS Complex

Controls renovation WorkshopFE Software 6 Global estimates Of the existing 44 GM classes under CO responsibility, about half refer to obsolete hardware (Camac,..) or systems, ~20 remain to be ported: – Generic I/O (9), Video (3), Central timing (8) CO has agreed to port some GM classes (5) made by CO when no sw competence can be found in the eq group (ABP, AT). However the group in charge of the associated system must be in charge of sw configuration and first-level diagnostics. SPS & Exp.areas: several classes if we need to keep old HW running with remote access (Equipment Bus or 1553-controlled crates) for several years [ between 6 and 20… to be worked out]

Controls renovation WorkshopFE Software 7 Work Packages Package StartsEnds FTEComments PS-GM FESA CO ( 9 classes ) 01/0902/102.0Mostly generic classes, Video, PS-GM FESA -> EqGrp (~5 classes?) 07/0902/111.0For ABP (sources) / AT-MEI (field meas) FESA/ Timing 10/09?02/111.0Depends on INCA reqs & OpenCBCM FESA for New HW 01/0902/101.0Extend generic classes EqGrp support 01/0902/110.5Knowledge Transfer SPS CO Legacy ?0.5?f( replacement plans) [ATB motor ctl,..]

Controls renovation WorkshopFE Software 8 Resources & time plan Year: total FTE KCHF ---- Plan to be refined w.r.t. dependencies on: New HW needs support libraries (CO/HT) FESA3.0 needed features (class inheritance/composition) Eq Group FEs renovation using Generic CO classes

Controls renovation WorkshopFE Software 9 Integration: examples Each specific implementation relies on a set of hardware/software choices: form factor (VME/PC), cpu (RIOx/Intel), I/O modules [drivers, libraries f(cpu)], FESA Classes. An integration plan must thus be made for each case. As example, CO plans for early 2009: VME with new Function Generator (CVORB) PC-based control of 1553 & RS-422 power supplies

Controls renovation WorkshopFE Software 10 Comments, Issues New requests (e.g. RexTrap) and gray responsibility areas not counted ( this may increase the given estimates ) For efficiency, one could organise a development team ( of additional manpower ) shared with other groups?

Controls renovation WorkshopFE Software 11 Conclusions CO commits to provide generic FESA classes for Eq Groups ( provided a renovation plan is made available in time ) This assumes all equipment groups take charge of the SW porting under their responsibility –as agreed in CO3 - within the time frame CO starts an assessment of SPS legacy FE software under present CO support for Q2-09 Ref: CO3 meetings &