GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR-01779-01 Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 7.1 Stress Analysis 1 GLAST Large Area Telescope:
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
General idea of a couple of check rod system and adjustments
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
GLAST Large Area Telescope:
GLAST LAT ProjectOct. 23, 2003 Page 1 EM-1 I & T Lesson’s Learned Need to define all documents / training required for I&T personnel –LAT-MD ,
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
LAT-PR Section 33-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
LAT-PR Section 55-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 3 - Page 1 GLAST Large Area Telescope: I & T Peer.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
GLAST Large Area Telescope:
Mechanical Integration
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
1. Introduction and Overview
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
GLAST Large Area Telescope:
Bunker Wall Design Wall ESS
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer Review Mechanical Ground Support Equipment Brian Grist SU-SLAC Subsystem Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 2 Outline MGSE Development Plan –Hardware Development List / Rationale –Design Factors –Proof Testing LAT MGSE List –EM-Single Bay Hardware –CU and Flight –Shipping Container Status

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 3 LAT MGSE Development Plan LAT-MD-01462, LAT MGSE Development Plan –Summarizes Assembly Sequence, Precedence document is LAT-PS –Defines MGSE Hardware and Tooling Elements –Defines provision responsibility –All MGSE Designs to Meet EWR 127.1, as Tailored by SLAC Material Yield not more than 85% of Ultimate Design Factor of Safety (No Earth Quake) > 3 Proof Test about 2 times maximum expected load Earth Quake per SLAC-I-720-0A24E-001, Specification for Seismic Design at SLAC. –Design for 5% Damping to reduce G loading to 1.5 G at 45º –Does not apply to temporary (crane) operations

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 4 LAT MGSE List 1.EM-Cal Rotation / Support Stand (in house) Also Used to Rotate EM Single Bay, CU 1 x 4 and then Calorimeter 2.EM Lifting Fixture*1 3.EM ACD Scintillator Support Fixture 4.Calorimeter Lift Fixture *2 ( in house) 5.Calorimeter Alignment Tool*2 (in house) Includes 0.45 m long Alignment Rods (in house) 6.Calibration Unit (1 x 4) to Rotation Stand interface plates (Design Complete) 7.CU Integration Stand Proof Test Article (Design Complete) 8.Calibration Unit Lift Fixture (in work) 9.Calibration Unit ACD Support Fixture 10.Calibration Unit X, Y, θ Movement System (for Beam Test) 42” Troyke Rotating Table in house ( major find ! ) 11.Thermal – Dew Point Control Tent (Double Walled) for Beam Test 12.CU & LAT Thermal Control Cart Ducting, Hoses, Cold plates 13.Grid Perimeter Ring (GPR) Supports Grid Through Entire Integration & Test at SLAC Supports LAT in Shipping Container (To Protect SC Bus Interfaces) Note:*1 - Tracker Tower Lift Fixture Supplied by Tracker Sub-System *2 – Successful Installation Demonstration completed Nov. 02

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 5 LAT MGSE List 14.Tilt Over Stand Two LAT-GPR Support Box Frames tied together by pivot bearing brackets TBD counterweights to adjust Cg along Z axis during sequential build up Practice will be required to obtain Tilt Over Certification 15.Special Crane Attachment to GPR (for Tilt Over Operations) Includes addition of load cell to crane’s lift cable for feedback to operator during tilt over 16.Tilt Over Stand Proof and Protocol Test Article 17.ACD Integration Frame 18.ACD Lift Fixture 19.ACD Lift Fixture Proof Test Article 20.LAT Shipping Container Insulated for Thermal Cycling Tests Includes Electrical Feed Throughs to Power up & Receive Data from LAT Includes Ducting for Thermally Controlled Air Circulation May Include transits for use of cold plate on X-LAT Heat Plate Container Cover Lift Fixture (Same as LAT Lift Fixture (TBR)) 21.Staging Table (in house) Preparation / Sub-System Functional Tests

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 6 LAT MGSE List 22.Vibration Test Fixture Provides Interface Between NRL Vibration Table and LAT to SC Bus Attach Points Single Stand Will Support All Three Axes 23.Thermal Vacuum Support Kit Vibe Test Fixture (VTF) with side support arms for Z axis horizontal Radiator Support Frame attaches to bottom of VTF and provides lower attach strut interface LAT Perimeter Heat Exchanger (to help drive to next temp) 24.Acoustic Test SC Simulator, Very Low Fidelity (TBR) Open Frame with attach points at – Z end of Radiators 25.Van de Graaff Support Stand (in house) 26.Calibration Unit Transport Box Includes Dry Air Purge for Humidity Control 27.EM Single Bay Transport Box For EM transport to Germany (GSI)

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 7 Critical LAT MGSE Integration Steps / Req’ts Grid handling –Grid Perimeter Ring provides attachment points at each of 4 corners; Consistent with current Radiator Support Structure design –Grid Perimeter Ring includes SC Bus attach bracket interfaces (i.e., all eight attach points used during shipment; FEA required to validate approach) Calorimeter-to-Grid mating –Chosen concept uses alignment tool that interfaces with Calorimeter’s GSE Support Posts and is lowered into position using Precision Crane Tracker-to-Grid mating –4 attachment points at corners of TKR top plate –Plan to mate Tracker to Grid with alignment tooling (provided by Tracker) and precision crane operation ACD-to-Grid mating –4 Three Bolt attachment points at corners of BEA, 4 two bolt attachment points mid span on BEA sides –Plan to mate ACD to Grid using alignment tooling and precision crane operation –Low Profile Lift Fixture Has Been Added to Hardware List (including needed funding)

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 8 Critical LAT MGSE Integration Steps / Req’ts SLAC Beam Test –De-humidification/cooling system for SLAC Beam Test –Calibration Unit Grid ( 1 X 4), Remote X, Y, Θ Movement System True Position Tolerance with respect to Beam is ± 1 mm [0.040”] in X and Y and ± 0.5º in Theta SLAC Reference Comprehensive Test / Airborne Cosmic Test (TBR) –De-humidification/cooling/heating system for shipping container –Ship w/o radiators (to fit in aircraft with LAT +Z up) NRL Environmental Tests –EMC/EMI – LAT in GPR on Box Stand or LAT on Vibe Test Fixture on TBD –Random Vibe / Sine Sweep* – Vibe Test Fixture –Acoustic Test – Vibe Test Fixture with Radiator Attach SC Interface Simulator –Thermal Balance & Cycling in Vacuum – Vibe Test Fixture with SC Attach Interface Simulator and Side Support Braces

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 9 LAT Transport Container –Requires Vibration / Shock Isolation System Initial Concept allows mm (6”) travel in X, Y and Z for Isolation Theoretical Isolation Assessment indicates good loads filtering above 3 Hz –Baseline Review (July 02) Concept 2159 mm (85”) Tall by 2921 mm (115”) Wide by 2667 mm (105”) Deep Sized with LAT on GPR that attaches to Isolation Frame Footprint can be reduced if LAT is on VTF, but at the expense of increased height; Under Evaluation Fits in the following Aircraft, Upper Cargo Deck Only: –Boeing F, C, Commercial –McDonnel Douglas MD-11, DC-10, Commercial –C130, C141 and C5A, Military Transport Will Require a Dedicated (Full Charter) Flight

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 10 LAT Transport Container, Initial Concept mm (6”) Clearance between GPR and inside surface perimeter mm (6”) Clearance between ACD and Top Side Stiffeners in work Fits through aircraft doors mm (114”) Across [ 9.5 ft ] 2667 mm (105”) Wide [ 8.8 ft ] mm (4”) x mm (4”) x 6.35 mm (1/4”) Wall Box Section AL LAT with GPR rests on Shock Isolation Frame mm (83”) Total Height [ 6.9 ft ] Electrical & Thermal Control feed throughs in work Weight Estimate Container ~ 635 kg (1,400 lbs) GPR ~ 408 kg (900 lbs) LAT ~ 2903 kg (6,400 lbs) Total ~ 3946 kg (8,700 lbs) ~ 513 kg/m 2 (105 lbs / ft 2)

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 11 LAT MGSE, Van de Graaff on Stand Van de Graaff is Ready to Use Out Riggers for Earthquake Stability Adjustable Feet to Allow Beam Pipe Height Adjustment

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 12 LAT MGSE, Calorimeter Alignment Alignment Tool and Alignment Rods available and ready to use Alignment Rods Handling Fixture Engagement Feature Handling Fixture Engagement Lever Jack Screws – Holds Tool Above TEM Connectors

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 13 LAT MGSE, Calorimeter Lift Fixture Available, Proof Tested and Ready to Use Lift Fixture Turnbuckles Allow Leveling Adjustment with 10 kg (22 lb) Alignment Tool Attached Alignment Tool Weight Reduced to about 4 kg (9.0 lbs) Calorimeter Mass / Outermost Features Mock Up ~ 93 kg (205 lbs) EM-Single Grid Bay In Modification to Support EM Integration and Test

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 14 LAT MGSE EM-Cal Rotation / Support Stand –Multi-Function, Support EM and CU Integration, Then Acts as Calorimeter Rotation Stand Calorimeter Rotation Interface 1 x 4 Grid Interface Plate Also Interfaces with the CU Lift Fixture 1 x 4 Grid, Empty Level Fine Tune Adjust Tool, Removed Before Powering Up Drive Motor (Designed to Fall Away When Person Lets Go of it)

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 15 LAT MGSE CU Integration Stand Proof Test Stand with kg (3,000 lbs) Install 1 st Tracker, Attach Calorimeter to Rotation Interface with + Z Up Rotate 1x 4 with Tracker and Calorimeter, Then Attach SLAC Lift Fix Use SLAC Lift Fix and Alignment System to Install Calorimeter Calorimeter Alignment System Not Shown for Clarity Proof Test Cal Rotation Interface to kg (450 lbs)

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 16 LAT MGSE CU Integration Stand EM-Cal Rotation / Support Stand Weldment – In House & Under Assembly

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 17 LAT MGSE, LAT MGSE, Calorimeter Rotation Stand Calorimeter Interface Assembly Calorimeter Latches Shown in Lock Down Position (Handles Point Inward) Motor Rotation About 40 Seconds for 180º Level Fine Tune Adjust Tool, Removed Before Powering Up Drive Motor (Designed to Fall Away When Person Lets Go of it) Double Worm Gear Reduction Prevents Rotation When Motor Not Powered After CU Processing is Complete, 1 x 4 Extension Frame and Driven Side Removed; Calorimeter Rotation Interface Assembly Re- Attached to Become the Calorimeter Rotation Stand

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 18 LAT MGSE, Rotation Concepts / Status Three concepts under evaluation Universal Support Stand –Operationally nice; Provides Up, Down and Rotation –Analytically expensive to manage Seismic Loads Tilt Over Stand –See next slide for discussion –Must manage changing Cg along Z during build sequence –Requires personnel access platforms Scaled up version of EM-Cal Rotation / Support Stand –Operationally nice, but anticipated to be fairly high off the ground –Several personnel access platforms would be required

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 19 LAT MGSE, Tilt Over Stand Concept Concerns and Mitigations –Tilt Over Shock as LAT passes 90º Position GPR along average Cg Z (Study In Work) Guide Ropes, Counter Balance Weights, Stop Brackets –Over Lift of LAT + Stands at High Point Add load cell to Crane’s Lift Cable to provide feedback to operator –Available hook height can not support ACD Installation without special ACD Integration Stand

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 20 LAT MGSE, Tilt Over Stand Concept Safety Aspects –All Crane Operations are classified as Hazardous Operations Due to suspended loads –Tilt Over Crane Operations are considered Critical Crane Operations Critical Crane Operations require more Safety Review Oversight –Special operator training –Demonstration of correct protocol performance –SLAC Site Certification for the specific tilt over operations with the specific required equipment »Coordination with SLAC Riggers TBW

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 21 Supplemental Slides

GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 22 LAT MGSE Grid Perimeter Ring Depiction of LAT Center of Gravity as a Function of Build Sequence –From CDR Mass Properties