The Roads Ahead Leroy D. Alloway, Director Community Development.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
May 13 th, 2014 City of Akron, Ohio Intersection Safety Study State Route 59 / Main Street / Howard Street.
OPEN HOUSE PUBLIC MEETING FOR LA 86 & LA 320: ROUNDABOUT IBERIA PARISH State Project No. H Federal Aid Project No. H
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
New I-65 Interchange at Worthsville Road Welcome!.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Hardin County Engineering Department September 12, 2006.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Exit Quiz Road Signs Recognition
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Signs, Signals and Pavement Markings
Characteristics of an Expressway Brandon Dye Wednesday October 24, 2007.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Southern Bridge Project Brown County Executive
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Signs Signals and Pavement Markings
STA Safety Project PID #76439 December 12, 2006.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
AND TRAFFIC SETTINGS ENVIRONMENTS. RESIDENTIAL STREETS FACTORS???? DRIVING PATTERNS SPEED PEDESTRIANS PARKED CARS TRAFFIC LAWS.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Introduction Study area Existing problem Objective Methodology Results and Conclusions Recommendations.
The Mobility Authority Story: Building for our Future.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
TALKING FREIGHT SEMINAR: Truck Separated Lanes/Truck Tolling MARCH 16, 2005 DARRIN ROTH DIRECTOR OF HIGHWAY OPERATIONS AMERICAN TRUCKING ASSOCIATIONS.
ENVIRONMENTS AND TRAFFIC SETTINGS CHAPTER NINE. FACTORS AFFECTING RES. STREET DRIVING EXPECT SURPRISES, DRIVE THE SPEED LIMIT! PEDESTRIANS HAVE RIGHT-OF-WAY.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Pioneer Road Relocation and Reconstruction Project
UNIT 3 Foundations of Effective Driving
The I-465 West Leg Reconstruction Project
Fordham at Columbia as a Grade-Separated Intersection
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
lesson 16.1 CLASSIFICATION OF HIGHWAYS
Fordham at Columbia as a Grade-Separated Intersection
Presentation transcript:

The Roads Ahead Leroy D. Alloway, Director Community Development

2

3

Photo from San Antonio Express-News – John Davenport 4

5

How is the Super Street working? 6

Are more trips being made on the 281 Super Street? Location2010 Count2011 Count% Increase South of Evans Road 74,000 vehicles per day 81,526 vehicles per day 10.17% increase in traffic North of Evans Road 60,100 vehicles per day 63,552 vehicles per day 5.74% increase in traffic 7

8 US 281 / Loop 1604 Interchange Project 281 North to Loop 1604 West Est Traffic Vehicles Per Day 281 North to Loop 1604 East Est. 2013Traffic Vehicles Per Day Loop 1604 West to 281 South Est Traffic Vehicles Per Day Loop 1604 East to 281 South Est Traffic – Vehicles Per Day

9

Why undertake environmental studies?  Answer the environmental questions once and for all – what impact could improvements have on the environment  Examine both non-toll and toll project alternatives through the Draft Environmental Impact Statement  Two estimated cost for the 2 Environmental Impact Statements is approximately $17 Million 10

US 281 Environmental Impact Statement Want more information? Visit the official US 281 EIS Pages online at 11

12 Limited access highway… means less construction cost less need for additional right-of-way less impervious cover But with limited access roads…  new driveways and intersections could occur  costs, right-of-way and impervious cover would increase if some access roads are provided  access rights for some properties may have to be acquired  the highway would be more congested and operate at lower speeds

13 But with main lanes and continuous one-way frontage roads…  construction costs are higher  additional right-of-way is needed  more impervious cover is required Main lanes with continuous one-way frontage roads… provide safe access for driveways and side streets separate local traffic from through (main lane) traffic allow the main lanes to be less congested and provide higher speeds reduce high speed conflict points and lower crash rates

14 But main lanes on continuous bridges…  mean higher construction cost  fewer on- and off-ramps for the elevated main lanes Main lanes on continuous bridges… mean less additional right-of-way and impervious cover allow most of the existing pavement to remain as access roads separate local traffic from through (main lane) traffic allow the main lanes to be less congested and operate at higher speeds reduce high speed conflict points and lower crash rates

Loop 1604 Environmental Impact Statement Want more information? Visit the official Loop 1604 EIS Pages online at 15

16

Loop 1604 Potential Alternatives – No Build 17

Loop 1604 Potential Alternatives – Expand lanes to the center 18

Loop 1604 Potential Alternatives – Add Managed Lanes to the Center 19

Loop 1604 Potential Alternatives – Add Elevated Managed Lanes 20

Funding - Where is it going to come from? 21

Stay Informed, Stay Involved! Want to see more of the animation files? Want to stay up to date on the proposed projects? - Follow us online!