G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz 8-4-2002) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.

Slides:



Advertisements
Similar presentations
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Advertisements

24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
first results from EMCal test beam
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Comparison of different chamber configurations for the high luminosity upgrade of M2R2 G. Martellotti - LNF - 13/03/2015 Roma1 + Alessia.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
MICROMEGAS per l’upgrade delle Muon Chambers di ATLAS per SLHC Arizona, Athens (U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul (Bogaziçi, Doğuş),
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
Production ad Quality control of RPCs for the CMS muon barrel system
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
A proposal to equip the high eta muon stations with High Rate GRPC
SHiP straw tracker prototype tests
CMS muon detectors and muon system performance
The Beam Test at Fermilab:
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
Results from a preliminary analysis of the MWPC test at the GIF
LHCb Muon Detector MWPC & GEM
Cosmic ray test of RPC for the ATLAS experiment
Presentation transcript:

G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1 144 R3 M1,M2,M3 48 R2 M4,M5 24 R1 M4,M5 Production rate/lab : 2–3 chambers / week

G. Martellotti CERN 22/04/20022 OPERATIONS INSIDE CLEAN ROOM (Responsibility of production centers) 1- Wiring ~ 2 hours / 2 gap 2- Glueing / soldering. - Control wire pitch 3 - cut in two mono-gap layers 4 - Wire tension test< 1 hours / gap (< 1 min / wire, wires in parallel) 5 - HV test in air on single gap with open chamber 6 - assembling 4 gap chamber

G. Martellotti CERN 22/04/ gas leakage test. < 1 hour / chamber Give over-pressure, close gas pipe, measure pressure decrease with time. Record pressure and temperature. 2 - chamber conditioning (Gas mixture and HV) ~ 24 hours (parallel operation for several chambers is needed) 3 - Gain uniformity measurement < 1 hour / chamber with radioactive source Record source position, total current 4 - cosmic rays test days/chamber measure efficiency plateau, time resolution (parallel operation for ≥ 4 chambers) OPERATIONS OUTSIDE CLEAN ROOM ( Tools developed by Roma1)

G. Martellotti CERN 22/04/ ) - gas leakage test 2) - chamber conditioning 1) can be done in air/argon in a short time 2) require a long time and the right gas mixture Tests outside the clean room need several working areas (problems of space, number of gas subsystems).  Try to reduce working areas - perform 1) and 2) on the same station (with final gas mixture?) Digital manometers and readout cards are being ordered. Three flow-meters are available…

G. Martellotti CERN 22/04/20025 Tentative layout for test stations

G. Martellotti CERN 22/04/ Gain measurement with radioactive source - We assume that a spot ~ 5cm diameter on the farthest gap is ok to monitor gain uniformity - a minimum current of >20-30 nA should be measured (assumimg a maximum acceptable dark current of order of 10 nA) - the most suitable source seems Ce137, mCurie intensity. According to Cern safety rules, 4-5 cm Pb screening is needed. - Best solution: screen with a layer of 4 cm Pb below the chamber. This implies about 500Kg Pb and a quite heavy table structure. (second option: eliminate the lead plate and protect operators from irradiation by closing the access to the table all around). To be recorded : source position, total current Current readout : digital nA 16 channels home made (G. Corradi)

G. Martellotti CERN 22/04/20027

8

9

cosmic rays test Measure efficiency plateau, time resolution - Trigger : two layers of scintillator counters - Muon tracking with an hodoscope of 6 same-size chambers (top and bottom chamber used as reference) - Readout through DIALOG. Measure the efficiency of all front-end channels running with two DIALOG configurations. ( 2 runs of > 24 hours) (test single gap switching off HV ?) - A maximum of 96x6 channels must be readout. - Multiplexing by a factor 6 with a delay of ~ 200ns/chamber (home made V. Bocci) allows to use only one TDC (128 ch). # Estimated cost of ReadOut : - with multiplexing E / ch - with more TDC modules 55 E / ch

G. Martellotti CERN 22/04/ movable chambers