1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

Engineering Approaches to Reducing Floor Vibration at the APS and CNM Presented by John Sidarous, Ph.D., S.E., P.E. For the NSLS-II Beam Stability Workshop.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Chris Channing P.E. Sr Project Engineer NSLS-II Conventional Facilities - Thermal Stability May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities John Hill CFAC review October 18 th, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
CEE 578 Senior Capstone Design Types of Construction Drawings
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
HVAC Replacement Case Study
St. George Infrastructure
CBETA Technical Review
Installation Global System
CF Organization & Schedule
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Maintenance at ALBA facility: Strategy for the conventional services
Technology in Architecture
CONVENTIONAL FACILITIES LCLS Office Space
Far Experimental Hall - Hutches
Heating, Ventilation and Air Conditioning HVAC
Physics Requirements for Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron Light Source – II Project October 19, 2006

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Conventional Facilities Scope Facility OverviewFacility Program Experimental Floor Central Lab Office Building Lab Office Building(s) Differential Settlement Vibration Mitigation Utility Services Temperature Stability Schedule

3 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview

4 BROOKHAVEN SCIENCE ASSOCIATES Site Plan NSLS LOB Typ 4 RF-LINAC AREA Service Bldg Typ 4 CFN CLOB Ring Bldg Future JPsi Future Guest House Conf. Center Underpass Loading

5 BROOKHAVEN SCIENCE ASSOCIATES Building Program

6 BROOKHAVEN SCIENCE ASSOCIATES Experimental Floor Concept Divided into 5 clusters Service Bldg supports all services within the cluster Six sectors/Cluster CLOB & Service Bldgs contain all Accelerator systems Ring, CLOB, LOB 1 & service bldgs are base scope LOB ’ s 2,3,4 can be added as needed w/o interruption

7 BROOKHAVEN SCIENCE ASSOCIATES Experimental Floor Arrangement

8 BROOKHAVEN SCIENCE ASSOCIATES Experimental Floor - Ring Building Section

9 BROOKHAVEN SCIENCE ASSOCIATES CLOB Features Space for 190 Offices, 8 labs Nominally 30 User Offices, 5 User labs from the total Possible 400 seat Conference Center addition w/ vendor area and three breakout rooms Lobby and User Reception area 2 nd floor viewing gallery overlooking experimental floor Bridge to electrical mezzanine and control room & RF/LINAC areas Close Proximity to future: JPSI Building Guest house

10 BROOKHAVEN SCIENCE ASSOCIATES Floor Plan – CLOB 1st

11 BROOKHAVEN SCIENCE ASSOCIATES Floor Plan - CLOB 2 nd

12 BROOKHAVEN SCIENCE ASSOCIATES Floor Plan – CLOB 3rd

13 BROOKHAVEN SCIENCE ASSOCIATES LOB Features Modular design – can be added when needed without interrupting operation 11,000 SF each – Serves six sectors 30 offices w/ conference space, interaction areas, lavs, showers 5 labs intended for shared use Shipping/Receiving/Storage area & chemical storage area Potential for expansion for more offices if needed Egress provided for personnel and large items at each LOB Loading area with exterior roll-up door Roll-up door from each lab onto the experimental floor Designed to minimize impacts to future long beamlines

14 BROOKHAVEN SCIENCE ASSOCIATES Lab – Office Building

15 BROOKHAVEN SCIENCE ASSOCIATES Differential Settlement Measures to reduce potential for differential settlement include: Thorough geotechnical analysis of site to identify problem areas Minimize footprint over disturbed areas Set finished floor elevation for maximum cut and minimum fill Early site preparation contract for maximum time to cut, fill, compact and observe settlement prior to building contract. Monolithic slab design for tunnel and experimental floor High slab stiffness, Tunnel 36 ” ; Experimental Floor 18 ” Building loads isolated from tunnel and experimental floor slab Access corridor isolated from experimental floor slab

16 BROOKHAVEN SCIENCE ASSOCIATES Vibration Mitigation Measures to be implemented in conventional design include: “ Monolithic ” slab for accelerator and experimental floor Slab thickness and section changes will be based on vibration modeling results Possible use of polymer admixtures for enhanced damping characteristics – likely use for access corridor Isolation of bldg structure from tunnel and slab Inertial bases and isolation of machinery Low flow velocity design for ducts and piping Limited use of duct and piping isolation to avoid conversion & transmission of low frequency vibration Commissioning of equipment and systems to include alignment, balancing & vibration measurement

17 BROOKHAVEN SCIENCE ASSOCIATES Utility Support Utilities run underground in center of ring and distributed to five service bldgs (one in CLOB RF/LINAC area) Minimizes pipe runs and pipe size in bldg proper Only needed service piping will be run in experimental area Minimizes potential noise and vibration impacts Services provided at each BL include: Electric Power Panel at Ratchet Wall, 75-95kW/Cell, 120/208V Cooling Water, HVAC Supply Air, Exhaust Compressed Air, LN 2, GN 2 DI Water (Copper and Aluminum) by Accelerator Group

18 BROOKHAVEN SCIENCE ASSOCIATES Utility Support

19 BROOKHAVEN SCIENCE ASSOCIATES Temperature Stability Key temperature stability requirement is tunnel +/- 0.1C at a given location with respect to time. Requires high resolution industrial grade instruments and controls with excellent repeatability. Space temp setpoint of 85 F is nominally equivalent to process cooling water supply setpoint to minimize temperature gradients Should be readily achievable provided loads to accelerator components are relatively steady-state Experimental Floor Temperature Cooling: 75 F +/- 1 F, 50% RH +/- 10% RH Heating: 75 F +/- 1F, 30% RH +/- 10% RH

20 BROOKHAVEN SCIENCE ASSOCIATES Experimental Floor Air Distribution

21 BROOKHAVEN SCIENCE ASSOCIATES Schedule Construction sequencing will enable Availability of Ring Bldg for LINAC, booster and storage ring installation to begin as early as March 2010 Beneficial Occupancy of Ring Building & LOB - June 2011 Control/Computer room availability & CLOB BO - August 2011 Conventional Construction complete - October 2011