EMERGENCY MANAGEMENT PLANNING. COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Practical Preparations Planning for Safety and Emergencies.
Home Owners Insurance Basics What is it and why do we need it.
Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
Barhale Procedure for Site Establishment
91 st Annual Meeting & Exposition April 1 – 4, 2012 Anaheim, California Are You Prepared for a Disaster? Nancy Brooks, Iowa State University Cory Harms,
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Revision from last week  Assumptions are potential failure points in a project. They need to be monitored and managed. At the start of the project they.
DISASTER CENTER Study Case DEMIRBANK ROMANIA “Piata Financiara” ConferenceJanuary 29, 2002 C 2002.
Florida Department of Financial Services Division of Consumer Services Bureau of Outreach Tom Gallagher, Chief Financial Officer.
Student Accommodation Centre Private Housing Talk 7 March 2011.
Project Close Out CTC-470.
ESTIMATING By Laith Jacob.
1.  Consider: What are my Hazard Risks & consequences?  Awareness to storm and flood risks ◦ Winds ◦ Floods ◦ Nor’easter ◦ Snow/Ice Storms ◦ Hurricane.
HOLMES BEACH PROPERTY MANAGEMENT, LLC MANAGEMENT PLAN INDEX I. Administration of the Association A. Officers and Responsibilities B. Meeting Schedules.
Safety and Loss Control
Rapid Response Network External Agencies Workshop 26 th January 2011 Middleton Railway Paul Armitage Tony Firth.
By Drudeisha Madhub Data Protection Commissioner Date:
BUILD WITH US. ™ Contractors
Pre-Disaster Contracts, Evaluation, Estimating and Reconstruction.
Like it never even happened. ® NATIONAL AGREEMENT Alfa Insurance SERVPRO ® Industries, Inc.
Chapter 6 Own a Home or Car.
Chapter 13 Security Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives State the major responsibility.
Reasons Why SERVPRO is a better Restoration Vendor The Premier Cleaning and Restoration Company “Nationally Known, Locally Owned” Of Birmingham.
Master Policy and Unit Owner Policy June 11, 2015 Insurance.
Lesson 13. Give examples of the three main types of business risk – economic, human, an natural Describe the elements of an effective risk prevention.
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
Insurance Institute for Business & Home Safety Even if the worst happens, be prepared to stay.
Disaster planning and management Small public offices information briefing December 2004.
Visual 1.1 An Overview Multi-Hazard Emergency Planning For Schools Unit 2.
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
Important points and activities.  The objective is to secure life, property, information in the event of a disaster and to facilitate business continuity.
Facilities Management and Design
Client Recordkeeping.  Service Agreements  Safety Partnership Letters  Hold Harmless Agreements  Worksite Evaluations  Follow-up Worksite Evaluations.
State and Local Records Management DISASTER PLANNING Presented By State and Local Records Management Division Texas State Library and Archives Commission.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
MANAGING BUSINESS RISKS AN OVERVIEW CSU, Northridge January, 2004 Chris Brady University Risk Manager.
Reasons Why SERVPRO is a better Restoration Vendor The Premier Cleaning and Restoration Company “Nationally Known, Locally Owned” Of Birmingham.
National Archives and Records Administration, Preparing for the Unexpected ESSENTIAL ELEMENTS: ANALYSIS.
Disaster Recovery - Just a beginning (notes from Denver IUG 14 Pre-conference) Christine Pouncey June 2, 2006.
Are You Prepared for a Disaster? Cory Harms, Iowa State University.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Pittsburgh Alliance for Response Risk Management, Loss Control & Insurance February 2009.
Immediate Action Plans Jay McAmis Santa Barbara County Office of Emergency Management March 6, 2012.
Essential Standard 2.00 Understand the nature of business. 1.
MODULE: 5 SALVAGE, OVERHAUL, AND SUPPORT ACTIVITIES.
Close Encounters of the DROPS Kind
AUDITING BUSINESS CONTINUITY PROGRAMS AND PLANS What to Look For Presented by: Tommye White, CBCP, DRP Chuck Walts, CBCP, CRP.
NHS England Emergency Preparedness, Resilience and Response (EPRR) Business Continuity exercise: Premises Unavailable
Reducing the Risk of Litigation. Coach Warn athletes of potential dangers involved in sport Supervise regularly and attentively Prepare and condition.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Risk Management And Insurance In a Sober Living Environment.
World War I Veteran’s Camp in 1934, Lower Matecumbe Key (Islamorada area)
Documenting Your Disaster SAA Annual Meeting Public Libraries Archives & Special Collections Christine Wiseman Aug. 3, 2016.
Module 8 Risk Management. Manager, Customer Services Module 8Slide - 2 Objective The learner will be able to: –Develop an understanding of Security Responsibility.
PUBLIC ASSISTANCE GRANTS
Utilizing Your Business Continuity Plan.
Operations Update Report
Risk Management for Perils Involving Property
A Coordinated Approach to Reduce Potential Lead Exposure
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
Risk Evaluation, Avoidance and Insurance
(With anticipated expenses over the $25,000 property deductible)
A Complete and Absolute Shambles
Crisis Planning & Strategy: Using Earthquakes as a Case Study
Preventive Maintenance Service Agreement
Presentation transcript:

EMERGENCY MANAGEMENT PLANNING

COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE

COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE RISK ASSESSMENT CRITICAL BUSINESS FUNCTION INSPECTION COMPLETE DOCUMENTS 24/7 IMMEDIATE EMERGENCY RESPONSE MITIGATE DAMAGE & LIABILITY ASSESS DAMAGE ASSESS CONTINUING BUSINESS OPTIONS FULL CONSTRUCTION SERVICE QUANTIFY & CALCULATE DAMAGE CONSTRUCTION PLAN & TIMELINE COMPLETE THE WORK

PLAN RISK ASSESSMENT CRITICAL BUSINESS FUNCTION INSPECTION COMPLETE DOCUMENTS

RISK ASSESSMENT MEETING MEETING DEFINE NICHE OF BUSINESS DEFINE NICHE OF BUSINESS DISCUSS PRIORITIES DISCUSS PRIORITIES RISK ISSUES RISK ISSUES COLLECT INFORMATION COLLECT INFORMATION BUILDING LOCATIONS BUILDING LOCATIONS VENDOR INFO; CONTACT INFO; BILLING INFO VENDOR INFO; CONTACT INFO; BILLING INFO INSURANCE INFORMATION INSURANCE INFORMATION EMERGENCY EQUIPMENT NEEDS EMERGENCY EQUIPMENT NEEDS PROVIDE PRIORITY CONTACT CARDS PROVIDE PRIORITY CONTACT CARDS

RISK ASSESSMENT INSPECTION INSPECTION TOUR FACILITIES TOUR FACILITIES DOCUMENT ALL MAJOR EQUIPMENT DOCUMENT ALL MAJOR EQUIPMENT VIDEO BUILDINGS INSIDE & OUT VIDEO BUILDINGS INSIDE & OUT DOCUMENT BUILDING MATERIALS DOCUMENT BUILDING MATERIALS DOCUMENT CONTENTS DOCUMENT CONTENTS LOCATION OF CRITICAL AREAS/DATA LOCATION OF CRITICAL AREAS/DATA LOCATE ALL UTILITY SHUT OFFS LOCATE ALL UTILITY SHUT OFFS NOTE ANY POTENTIAL RISK EXPOSURE NOTE ANY POTENTIAL RISK EXPOSURE MAKE COPIES OF PLANS (IF APPLICABLE) MAKE COPIES OF PLANS (IF APPLICABLE)

COMPLETE DOCUMENTS RECORD ALL INFORMATION RECORD ALL INFORMATION KEPT IN SAFE LOCKED/SECURE ROOM KEPT IN SAFE LOCKED/SECURE ROOM REVIEWED QUARTERLY FOR FAMILIARITY REVIEWED QUARTERLY FOR FAMILIARITY COPY TO INSURANCE AGENT COPY TO INSURANCE AGENT POTENTIALLY LOWER PREMIUMS POTENTIALLY LOWER PREMIUMS

BENEFITS MINIMIZE BUSINESS INTERUPTION MINIMIZE BUSINESS INTERUPTION PRIORITY SERVICE PRIORITY SERVICE 365/24/7 IMMEDIATE RESPONSE 365/24/7 IMMEDIATE RESPONSE NO DEPOSIT COLLECTED NO DEPOSIT COLLECTED GUARANTEED COMPETITIVE PRICING GUARANTEED COMPETITIVE PRICING PRIORITY CARDS PROVIDED PRIORITY CARDS PROVIDED NO UPFRONT CONTRACT NO UPFRONT CONTRACT 100% SATISFACTION GUARANTEED 100% SATISFACTION GUARANTEED PEACE OF MIND PEACE OF MIND NO COST TO JOIN NO COST TO JOIN

RESPOND 24/7 IMMEDIATE EMERGENCY RESPONSE MITIGATE DAMAGE & LIABILITY ASSESS DAMAGE ASSESS CONTINUING BUSINESS OPTIONS

MITIGATE DAMAGE & LIABILITY PREVENT FURTHER DAMAGE PREVENT FURTHER DAMAGE UTILITY KILL POINTS UTILITY KILL POINTS SAFETY ISSUES SAFETY ISSUES IS THE STRUCTURE SAFE FOR ENTRANCE/TEMPORARY SHORING IS THE STRUCTURE SAFE FOR ENTRANCE/TEMPORARY SHORING EXTRACT WATER EXTRACT WATER EXPOSURE TO ELEMENTS EXPOSURE TO ELEMENTS BOARD UP OR WINTERIZE BOARD UP OR WINTERIZE STABILIZE ENVIRONMENT STABILIZE ENVIRONMENT RESTORE POWER/WATER/HEAT RESTORE POWER/WATER/HEAT STRUCTURAL STABILITY ISSUES DURING TEMP REPAIRS STRUCTURAL STABILITY ISSUES DURING TEMP REPAIRS REMOVE/CONTROL CONTANIMENTS (ANTI-MICROBIAL AGENTS) REMOVE/CONTROL CONTANIMENTS (ANTI-MICROBIAL AGENTS) REMOVE CRITICAL EQUIPMENT REMOVE CRITICAL EQUIPMENT BEFORE ACIDIC RESIDUE DAMAGE/WATER DAMAGE BEFORE ACIDIC RESIDUE DAMAGE/WATER DAMAGE REMOVE CRITICAL DATA REMOVE CRITICAL DATA ACIDIC SMOKE DAMAGE AND WATER DAMAGE ACIDIC SMOKE DAMAGE AND WATER DAMAGE REMOVE DAMAGED STRUCTURAL ITEMS REMOVE DAMAGED STRUCTURAL ITEMS PACK OUT AND INVENTORY CONTENTS PACK OUT AND INVENTORY CONTENTS

LIABILITY ISSUES MANAGE SUBROGATION EXPOSURE MANAGE SUBROGATION EXPOSURE PROTECT SCENE FROM SPOILIZATION PROTECT SCENE FROM SPOILIZATION ASSIST IN CAUSE AND ORIGIN INVESTIGATION ASSIST IN CAUSE AND ORIGIN INVESTIGATION STORAGE OF SUBROGATION ITEMS STORAGE OF SUBROGATION ITEMS MANAGE ONGOING LIABILITY RISK MANAGE ONGOING LIABILITY RISK THROUGHOUT TEMPORARY REPAIRS THROUGHOUT TEMPORARY REPAIRS LIMIT ADDITIONAL EXPOSURES LIMIT ADDITIONAL EXPOSURES PROVIDE PREMISES SECURITY PROVIDE PREMISES SECURITY

ASSESS DAMAGE DETERMINE LEVEL OF DAMAGE DETERMINE LEVEL OF DAMAGE SALVAGEABLE SALVAGEABLE REPAIRABLE REPAIRABLE DESTROYED DESTROYED PHYSICAL BUILDING PHYSICAL BUILDING EQUIPMENT & TOOLS EQUIPMENT & TOOLS RAW MATERIALS RAW MATERIALS DATA & COMPUTER SYSTEMS DATA & COMPUTER SYSTEMS MECHANICAL SYSTEMS MECHANICAL SYSTEMS

CONTINUING BUSINESS ISSUES WHAT PART OF BUSINESS INTERUPTED WHAT PART OF BUSINESS INTERUPTED ENACT PLAN TO RESTORE BUSINESS FUNCTION ENACT PLAN TO RESTORE BUSINESS FUNCTION MOVING EQUIPMENT TO OTHER AREA MOVING EQUIPMENT TO OTHER AREA TEMPORARILY RELOCATION TEMPORARILY RELOCATION EXPEDITE NEEDED DATA RECOVERY EXPEDITE NEEDED DATA RECOVERY TEMPORARY FURNITURE/OFFICE EQUIPMENT TEMPORARY FURNITURE/OFFICE EQUIPMENT

COUSINO HARRIS DKI EMERGENCY MANAGEMENT PLANRESPONDRESTORE RISK ASSESSMENT CRITICAL BUSINESS FUNCTION INSPECTION COMPLETE DOCUMENTS 24/7 IMMEDIATE EMERGENCY RESPONSE MITIGATE DAMAGE & LIABILITY ASSESS DAMAGE ASSESS CONTINUING BUSINESS OPTIONS FULL CONSTRUCTION SERVICE QUANTIFY & CALCULATE DAMAGE CONSTRUCTION PLAN & TIMELINE COMPLETE THE WORK

RESTORE FULL CONSTRUCTION SERVICE QUANTIFY & CALCULATE DAMAGE CONSTRUCTION PLAN & TIMELINE COMPLETE THE WORK

QUANTIFY & CALCULATE AFTER ALL TEMPORARY REPAIRS AFTER ALL TEMPORARY REPAIRS EVALUATE LEVEL OF DAMAGE EVALUATE LEVEL OF DAMAGE FORENSIC ENGINEERS FORENSIC ENGINEERS STRUCTURAL ISSUES STRUCTURAL ISSUES MECHANICAL ISSUES MECHANICAL ISSUES SCOPE OF DAMAGE SCOPE OF DAMAGE XACTIMATE ESTIMATE (Insurance program) XACTIMATE ESTIMATE (Insurance program) TIME AND MATERIAL BILLING TIME AND MATERIAL BILLING INTERFACE WITH INSURANCE COMPANY

CONSTRUCT PLAN & TIMELINE DETERMINE CONTRUCTION TIMEFRAME DETERMINE CONTRUCTION TIMEFRAME CONSTRUCTION PROCESS CONSTRUCTION PROCESS ALL MATERIALS CHOSEN ALL MATERIALS CHOSEN BUILDING STRUCTURE & FIXTURES BUILDING STRUCTURE & FIXTURES DÉCOR-COLOR AND CARPETING DÉCOR-COLOR AND CARPETING FABRICS FABRICS COORDINATION OF WORK SCHEDULES COORDINATION OF WORK SCHEDULES INSTALLERS/MECHANICAL WORK ETC INSTALLERS/MECHANICAL WORK ETC

COMPLETE THE WORK STRUCTURAL TO FINISH WORK STRUCTURAL TO FINISH WORK “PACK BACK” “PACK BACK” RETURN CONTENTS TO STRUCTURE RETURN CONTENTS TO STRUCTURE PUNCH LIST PUNCH LIST 100% CUSTOMER SATISFACTION 100% CUSTOMER SATISFACTION 3 YEAR WARRANTY 3 YEAR WARRANTY