Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica,

Slides:



Advertisements
Similar presentations
The Lone Star College System 13 Locations spread across 1,400 square miles 5 Colleges 2 University Centers 5 Centers System Office & Training Center 4,800.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
Building Codes, Zoning Ordinances
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Carriage house expansion at the Grover Cleveland birthplace
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
The Must-See event for the World of Architecture and Construction MADE expo is the Italys leading international architecture, building and construction.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
National CAD Standard In a world where globalization is invading and distinction is becoming the rule, We feel the urge to pass some of the knowledge.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
Los Alamos NATIONAL LABORATORY 6/25/02, Sheet 1 UniFormat, OmniClass, MasterFormat UNIFORMAT II -- an org system for building “Elements” Elements: foundation;
MasterFormat™ April 7, 2005 Kevin R. Miller.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
Facilities and Construction: Did you know your GPO can help?
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MasterFormat™ March 17, 2004 Kevin Miller.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Design Considerations for Telecommunications Pathways and Spaces
Construction Contract Documents
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Division 17 Organizational Model for Technology and Communication Systems prepared by Tom Rauscher Archi-Technology.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Construction Specifications
COMMUNICATIONS DESIGN AND IMPLEMENTATION 2010 Communications Design in Military Projects.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Construction Specifications Foreman’s Development Series
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
The ANSI/TIA-606B Administration gmail.com Edit December
Construction Drawing Occupational Safety and Fundamentals
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Formats ACT 380.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
UF Telecom Standards Overview ITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications.
CABLING SYSTEM ADMINISTRATION. Administration Concept.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Estimating and Scheduling CEE 492
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
1 JCI 1 1 An engineer is someone who can do for $5,000 what any damn fool can do for $50,000. Anonymous.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
Construction Documents
(Refer to Chapter 2 of the textbook)
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
What happened to Division 17? and what is CLA?
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The Lone Star College System
Presentation transcript:

Division 17/25 Organizational Model for Technology and Communication Systems “What has changed – What has not” James C. Waddell, RCDD Formare Technica, Ltd.

LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO About Us Specialize in Communication Technology Consulting and Project Management. Experts at Business Consulting and D25 integration and Business Education. Early leaders in the Division 17 initiative. Board of Directors CSI Portland Chapter Effective 6/01/2002

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO In addition to Consulting….

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Background To understand what is “Division 17”, you must first understand: What is CSI ?

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO What is CSI ? PMI = Project Management

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO What is CSI ? CSI = Architecture

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Background CSI - Construction Specifications Institute One of the documents that CSI produces, jointly with CSC - Construction Specifications Canada is the: MasterFormat™

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Background The MasterFormat consist of the following: Front End - Intro, Bid Forms, Conditions, Etc. Division 1 - General Requirements Division 2 - Site Construction Division 3 - Concrete Division 4 - Masonry Division 5 - Metals Division 6 - Woods and Plastics Division 7 - Thermal and Moisture Protection

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Background Division 8 - Doors and Windows Division 9 - Finishes Division 10 - Specialties Division 11 - Equipment Division 12 - Furnishings Division 13 - Special Construction Division 14 - Conveying Systems Division 15 - Mechanical Division 16 - Electrical

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Background Architects use this MasterFormat to organize the requirements for a new building or renovation Here is how the process works…

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process First a customer identifies a need

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process Who then hires a design professional often an Architect

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process Architect will complete the drawings and written specifications

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process Bids are received and the contract(s) is awarded to the successful bidder(s) and construction begins

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process This is typically about the time when it becomes obvious that technology has not been effectively addressed during the design process – (Pre 2/28/2002)

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process The main construction project is completed and the contractors turn over the record copy drawings and manuals to the O&M group Meanwhile, the technology systems managers wade through what they were given and often need to continue to rework, enhance or otherwise modify the results

Formare Technica, Ltd. Process One reason why technology requirements are not included in the main construction project is because: Technology is not adequately included in the current model used by the Architects to organize the requirements of a building

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Process Currently, the construction industry places the Technology and Communications requirements at the tail end of Division 16 - Electrical Requirements Not only are 2 pages insufficient, the location fosters the perception that telecommunications industry is a subset of the the electrical industry and therefore also a subcontractor

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Current Model Communications 710 Communication Circuits 720 Telephone and Intercommunication Equipment 740 Communication and Data Processing Equipment 770 Cable Transmission and Reception Equipment 780 Broadcast Transmission and Reception Equipment 790 Microwave Transmission and Reception Equipment

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Current Model Sound and Video 810 Sound and Video Circuits 820 Sound Reinforcement 830 Broadcast Studio Audio Equipment 840 Broadcast Studio Video Equipment 850 Television Equipment 880 Multimedia Equipment

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Current Model A second reason that the telecommunication design is not in sync with the formal design process is because there is often a separate RFP for the telecommunication requirements which places the design responsibility on the contractor who does not start a detailed design process until after winning the bid

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Why Division 17 This results in construction project designs that go out to bid with little or no coordination for technology other than a few outlet boxes and conduit stubs or a note to “coordinate in field with owner”

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Why Division 17 These two reasons explain why there is often: no space allocated in the building for Technology no money in the capital budget for the required Technology Infrastructure And typically not much time left to resolve the issues

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Reasons The reasons for this go back to the FCC break up of Bell System BIC’s Engineers and REA Practices were the resources architects depended on to provide requirements for telephone service inside a building With the break up, the services that these BIC engineers had traditionally provided became the responsibility of the building owners

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Reasons BICSI was formed to help address this issue Formal communication with the A/E/C design professionals has typically been limited to a particular system, if at all (AT&T – IBM)

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 It has now become clear that we need to add a “T” to the AMEP design process Some have called it the “4th utility” The goal has been to establish an effective and comprehensive model that can be used to plan, build and also manage technology infrastructures in a manner consistent with the design industry

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 Division 17 is this model It can be used to organize a comprehensive set of performance specifications, cost estimates and series of Technology drawings Division 17 can completely manage a stand alone technology project or serve as an integrated component of a complete building/project design

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 Sections Front End General Cable Plant LAN Voice Audio/Video WAN Architectural, Electrical and Mechanical Intra Building Communication Systems Building Automation and Control Security, Access and Surveillance

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division Summary Section Cable Plant 17100Cable Plant Overview 17110Communication Equipment Rooms 17120Main Equipment Rooms and Service Entrances 17130Interior Pathways 17140Exterior Pathways 17150Backbone Requirements 17160Horizontal Requirements 17170Testing, Identification and Administration 17180Cutover & Training 17190Support & Warranty

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division Detail Section Communication Equipment Rooms Equipment Racks/Cabinets/Shelves Cable Management – Vertical & horizontal Patch Panels Fiber Patch Panels Backboards Termination Blocks Aluminum Ladder Rack Tie Wraps D rings and T Posts Grounding Bars

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 - Specifications A performance specification specifies the minimum quality requirements for how a product shall be manufactured and installed CSI SectionFormat consists of 3 Parts PART 1 - GENERAL - administrative PART 2 - PRODUCTS - materials PART 3 - EXECUTION - installation

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 - Specifications PageFormat PART 1- GENERAL 1.1 WORK INCLUDED A.Provide all labor, materials, tools, and equipment required for the complete installation of work called for in the Contract Documents PART 2 - PRODUCTS 2.1 FLOOR MOUNTED RACKS A.Racks shall meet the following physical specifications: 1. 19” rack mounting space foot high. PART 3- EXECUTION 3.1 FLOOR MOUNTED RACKS A.All racks shall be anchored to the floor. B.Provide vertical and horizontal cable management in the front and back.

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 - Specifications The Division 17 Organizational Model provides the framework for preparing the specifications, but it is not the source The origin of specifications arose from drawing notes that became too numerous to fit on a drawing and have evolved into the Project Manuals present today

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO “T” Series Drawings To prepare these drawings, the technology industry must be able to obtain accurate base files (floor plans) to prepare a set of “Technology” Drawings to plan and communicate the technology requirements with clients and other design professionals The following is a summary of the types of drawings that should be created:

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO “T” Series Drawings T0 – Campus or Site Plans Exterior Pathways and Inter-Building Backbones T1 – Layout of complete building per floor Serving Zone Boundaries and Backbone Systems T2 – Serving Zones Drawings Drop Locations and Cable ID’s T3 –Communication Equipment Rooms Plan Views - Tech and AMEP and Elevations - Racks and Walls T4 – Typical Drawings Faceplate Labeling, Firestopping, ADA, Safety, DOT, etc.. T5 – Schedules (spreadsheets) for cutovers

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Review We have identified that there is a gap between the Technology and Construction Industry We understand some of the history of how it has happened We have an organizational model for the performance specifications and We have a Drawing Series that is dedicated to Technology

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO New Process The key now is for telecommunication consultants to become part of the established design and construction process This is not always easy and is often challenged One method is for the customer to include telecommunication requirements in the project scope when selecting an architect or lead design professional

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO New Process A second step is to have the “architect” incorporate the Division 17 requirements from the earliest stages of planning through the design and construction stages by including a Technology Engineer or Consultant in the process

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO New Process For this to happen, Telecommunication Consultants must prepare the project requirements using: Performance Specifications based on The proposed Division 17 Organizational model The existing CSI master format, section format and page format documents Organized Series of CAD Drawings

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO New Process Then Telecommunication Contractors, Installers and Integrators must learn to interpret and work from: Performance Specifications based on The proposed Division 17 Organizational model The existing CSI master format, section format and page format documents Organized Series of CAD Drawings.

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Next Steps BICSI has submitted proposal to CSI Review of MasterFormat is underway with next edition out /28/2002 Division 17 concept was approved. Now called Division 25 Communication by CSI.

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO D17/D25 Information

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO D17/D25 Differences

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO 1995 MasterFormat 1 Genl Requirements 2 Site Construction 3 Concrete 4 Masonry 5 Metals 6 Wood & Plastics 7 Thermal & Moisture Protection 8 Doors & Windows 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Construction 14 Conveying Systems 15 Mechanical 16 Electrical

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Proposed MasterFormat 0 Procurement & Contracting Requirements 1 Genl. Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood & Plastics 7 Thermal & Moisture Protection 8 Doors & Windows 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Const 14 Conveying Equip

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Proposed MasterFormat 21 - Life Safety & Facility Protection 22 - Plumbing 23 - HVAC 24 - Electrical 25 – Communications

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Proposed MasterFormat 31 - Site & Underground Construction 32 - Site Improvements 33 - Transportation 34 - Waterway & Marine Construction

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Proposed MasterFormat 41 - Fluid Treatment 42 - Power Generation 43 - Processes 44 - ______ Processes (If Required)

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 25 Communication Cable Plant Data Systems and LANs Telephone / Voice Systems Integrated Audio/Video Systems WAN and Dial Tones CO OSP Intra-Building Communication Systems

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 17 Sections Front End General Cable Plant LAN Voice Audio/Video WAN Architectural, Electrical and Mechanical Intra Building Communication Systems Building Automation and Control Security, Access and Surveillance

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division 25 Detail Cable Plant Telecommunication Rooms Equipment Rooms and Service Entrance Interior Pathways Exterior Pathways Backbone Cabling Horizontal Cabling Cable Plant Life Cycle Activities

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Division Summary Section Cable Plant 17100Cable Plant Overview 17110Communication Equipment Rooms 17120Main Equipment Rooms and Service Entrances 17130Interior Pathways 17140Exterior Pathways 17150Backbone Requirements 17160Horizontal Requirements 17170Testing, Identification and Administration 17180Cutover & Training 17190Support & Warranty

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO

Formare Technica, Ltd. LAN - WAN - PBX - STRUCTURED CABLING - CUSTOMER OWNED OSP - AUDIO/VIDEO Wrap up Download, review and comment on the information from the Division 17 web site located at: Contribute to Division 17/25 and make it work for you

Your Problems are SOLVED !