The Use of Standard Materials and Methods

Slides:



Advertisements
Similar presentations
BUILDING ENERGY CODES UNIVERSITYwww.energycodes.gov/BECU 1 BUILDING ENERGY CODES UNIVERSITY ANSI/ASHRAE/IES Standard Scope and Application April.
Advertisements

Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
2 NTCA is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Measuring Carpentry and Miscellaneous Items
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
Skyscraper Construction
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
Region IV Fat/Cat Totals by Fiscal Year The mission of the Region IV Emphasis Program is to reduce construction fall accidents and fatalities in the Southeast.
Chapter 18 Working Drawings.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Chapter 9. Please read chapter 9.  Please review, know and understand the terms related to fire protection page 284.  Know the Classifications of.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Construction Contract Documents
Product Evaluation ACT Objective O Emphasize the importance of proper product evaluation and selection O Develop insight into effective procedures,
Construction Specifications
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
HVACR116 – Trade Skills Mechanical Drawings.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Construction Specifications Foreman’s Development Series
Unit 1 Making Buildings Part Ⅰ Illustrated Words and Concepts Figure 1-1 Healthy House Figure 1-2 South Elevation of a House Part Ⅱ Passages Passage A.
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Construction Contracts and Project Delivery Methods
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
Methods of Specifying ACT Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
1. Course Civil Engineering Materials Credit hours (3+1) 3 = 3 hours per week lecture 1= 3 hours per week lab Course Instructor Instructor Dr Atta Ullah.
Specification & Quantities Estimating
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CVE 4070 Construction Engineering Shop Drawings Quality Control
HVACR116 – Trade Skills Symbols.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
HVACR116 – Trade Skills Symbols. Objectives After completing this unit, you will be able to identify and understand the meaning of the listed symbols:
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Design Intent Phase Design Intent Phase Determine what the design intent is and how the building is to operate when it is complete. Determine what the.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
Sprinkler Loads on Trusses
Sprinkler Loads on Trusses Educational Presentation.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Components of Construction part 2
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Joanne Macgregor C Lund & Son Ltd March 2016
Truss Heel Heights and Energy Code Requirements
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
(Refer to Chapter 2 of the textbook)
Electrical Gas Plumbing Heating & Cooling
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
Commercial Construction Projects
House Construction Budget Plan
FBE03: Building Construction & Science
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

The Use of Standard Materials and Methods Specifications not only bind the contractor to perform his work in a certain manner and to furnish material of a certain grade, but they also greatly influence the cost of the work and material furnished. Unusual characteristics, modifications of standard machines, and the introduction of new methods should be specified only when such unusual requirements are clearly needed to secure the best result, and after an investigation has shown plainly that the additional expense involved is commensurate with the better results to be obtained. neither the best nor the cheapest is uniformly desirable or applicable, and the ideal quality for the specific conditions in question should be the aim in each case. Unnecessary requirements and restrictions as to the quality or character of material and supplies or of unusual methods of construction will add unnecessarily to the expense involved and constitute a serious error. Such specifications are all too common and frequently result in unwarranted expense, serious trouble, and sometimes in legal complications.

Responsibility The more general the specifications, the greater the degree of responsibility which the contractor should required to accept. As the details are defined by the specifications, the contractor’s responsibility must of necessity decrease, for neither morally nor legally can a man be held responsible for results which are entirely beyond his control.

CHAPTER 17 Technical Specifications: Materials and Processes

Basic Consideration If one were to pick at random a number of technical specifications for an assorted variety of jobs and compare them, it might appear at first that there was little similarity between them. Fundamentally, however, each, if well written, will have as its goal the presenting of certain definite information arranged in the manner which will make this information of maximum value to those for whom it is intended. A satisfactory arrangement for a given set of technical specifications must therefore be used on the type of operation which it is intended to control

Outlining Technical Specifications for Construction Work In technical specifications for construction work the material which should be included and the manner in which this material should be organized must be consistent with the organization of the trades and industry which are to construct the work and supply the materials.

Section Titles for a School Building The following is an example of the title of the trade division of a somewhat, different type of construction project, a school building: Excavation, Filing, Grading Concrete Construction Masonry Work Structural Steel and Miscellaneous Ironwork Carpentry and Millwork Finish Hardware Roofing and Waterproofing Sheet-metal Work Lathing and Plastering Insulation and Acoustic Tile Resilient Flooring Ceramic Tie Painting Glass and Glazing Plumbing and Sewering Heating and Ventilating Electrical Work and Fixtures

Outlining Trade Technical Specifications When all the work for the complete project has been divided between the various trades, each of the trade technical specifications may be prepared. The trade specifications are divided into section, each of which presents, in the amount of detailed required, the information which is necessary for the trade to have in order to perform properly the particular items of work which is covered in the section. Each trade technical specification will have a list of section titles which will be applicable only to the one particular trade and the one particular project. In writing trade technical specifications, there is no substitute for an intimate knowledge of the work to be performed.

Example of Trade Technical Specification Section Titles The section titles for a set of heating, ventilating, and air-conditioning specifications for a small office building will be given to illustrate in general terms the organization pattern used and the type of material covered. 1. General 20. Oil burner 2. Scope of the work 21. Oil tank and piping 3. Manufacturer’s names 22. Vacuum heating and boiler feed and number pump 4. Heating, ventilating, and 23. Steam and condensate piping air conditioning drawings system 5. Cooperation with other 24. Reheat piping system contractors 25. Steam and condense pipe fittings 6. Coordination of Suncons. 26. Pipe hangers and supports 7. Description of the systems 27. Valves 8. Air-conditioning plenum 29. Zone-reheat circulator pump and system temperature control valve 9. Air-conditioning fans 30. Wall fin radiation and unit heater 10. Air filters 31. Hot water tank and heater

Example of Trade Technical Specification Section Titles Continuations 11. Heating, cooling, and 32. Temperature controls 12. Duct work 33. Pipe, duct, hot water tank, and 13. Registers, grilles, and breeching insulation ceiling outlets 34. Exhaust ventilation and fans 14. Refrigeration condensing 35. Kitchen hoods units 36. Connections with the electrical trade 15. Refrigeration piping and 37. Guarantee accessories 38. Final clean-up and inspection 16. Refrigeration-system testing and charging 17. Refrigeration condenser water piping 18. Boiler 19. Smoke breeching and barometric draft-control damper

Explanation of some general terms the organization pattern used and type of material covered GENERAL. All work listed is subject to the General And Special conditions preceding. This contractor and his subcontractors shall be responsible for and governed by all requirements thereunder. This section is included to notify all heating contractors who wish to submit bids that there are sections of the specifications other than the trade technical specifications with which they should familiarized themselves; otherwise, they might read only that section and miss some of the requirements for the project. SCOPE OF THE WORK. This work shall include all labor, materials, tools, equipment, transportation, etc., necessary install the complete systems of heating, ventilating and air conditioning in accordance with the drawings and the specifications following.

Explanation of some general terms the organization pattern used and type of material covered MANUFACTURER’S NAMES AND NUMBERS. Various items on the drawings and on the division of the specifications are listed with name and number of some specific manufacturer. It is not the intent of these documents that the manufacturer so listed is to be given preference over other manufacturers, whose equipment is, in the opinion of the Engineer, equally suitable. GUARANTEE. A guarantee of one year after completion is usually given by the contractor to the owner. The contractor guarantee the operation of all equipment or materials installed under his contract. This guarantee shall cover all defects in workmanship and material, and this contractor shall rectify all such defects within the period of the guarantee without additional cost to the owner.

Explanation of some general terms the organization pattern used and type of material covered Specifications for Supplies. Specifications for supplies that are not a part of a contract that includes labor and materials are written in much the same fashion as are the materials specifications for a labor and materials contract. For example, a specification for cement might read: Cement. All cement shall be Portland Cement and shall confirm A.S.T.M. Serial Designation C150 and Shall be Type I. the color shall be subject to approval by the Purchasing agent. All cement shall be the product of one reputable manufacturer. Certification of specification conformance shall be furnished for each shipment of a carload.

Some common modern Construction Materials and Methods use In Roofing Roof Retrofitter (APO GALFAN Roof Retrofitter) Rib-type roofing (METALPLAS Twin Rib Roofing Sheet) Concrete roofing (TEGULA FILIPINA Concrete Roof Tiles) In Walls Interior and Exterior Metal Studding Exterior wall panels (EcoWall High Performance Exterior Wall Panels) Pre-casting of Walls In Concrete mixed Pre-mixed concrete mixed Retardant for concrete mixed Accelerant for concrete mixed In Mechanics and Equipment Concrete Finisher or Paver for road concreting Concrete pump truck Laser guided level