Modernizing Modernism: Challenges with Preserving Post-War Buildings National Historic Tax Credit Conference Chicago, Illinois September 25, 2008 The Inland.

Slides:



Advertisements
Similar presentations
Meeting the Secretarys Standards: NPS Guidance on Special Issues Gary Sachau, National Park Service Historic Tax Credit Developers Conference St. Pete.
Advertisements

A Terminal Transaction. A Terminal Transaction – Exterior Renovation Terminal Tower.
Historic Preservation Tax Credits The Process and Avoiding Common Problems National Park Service, Technical Preservation Services.
Historic Tax Credit Developers Conference February 7 & 8 Don CeSar Beach Resort, St. Pete Beach, Fl Working with the National Park Service and States.
Historic Preservation Tax Credits The Process and Avoiding Common Problems Charles E. Fisher New York City, June 2009 National Park Service, Technical.
Historic Preservation and Affordable Housing National Historic Tax Credit Conference Chicago September 2008 Judith L. Kitchen, Ohio Historic Preservation.
Landmarks Preservation Commission.
Modernizing Modernism:
Working With the National Park Service and the States Avoiding Common Problems Current Economic Impact National Park Service, Technical Preservation Services.
Working With the NPS and the States IPED / Reznick Historic Tax Credit Conference Miami Beach, FL February 5, 2009.
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. architectural.
Carriage house expansion at the Grover Cleveland birthplace
Ludwig Mies van der Rohe in the United States The Technology and Aesthetics of Modernism Applied to Corporations and Institutions.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Introduction to Cost Segregation Chris Hitselberger Senior Managing Director & National Practice Leader Eli Varol Managing Director - Midwest.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Economic Basics of Historic Preservation David Buck, Oshkosh Planning Services Steve Cummings, Oshkosh Landmarks Commission & Common Council.
Skyscraper Construction
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
“TOD” Development Opportunity Case Studies for Reference & Historic Preservation Opportunities Moline, Illinois October 18, 2011.
OTTAWA STREET POWER STATION REHABILITATION AIA Michigan 2013 Honor Awards Program Category: Building.
Brought to you by: HISTORIC ITHACA 212 Center St, Ithaca, NY
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
By.
Prepared by Dr. Hazem Abu-Orf, Theories of Architecture(EAPS4202) Lecturer 4 19 th Century Architecture (Part 3) Chicago School of Architecture.
Fusionz COMMERCIAL OFFICE AND RETAIL DESIGN. COMPANY VISION Fusionz is dedicated to improving commercial space productivity, culture and image  Applying.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Historic Resources Catalyn Cummings Kristen Wight Christopher Clifford Kirk Huffaker Steve Cornell Catalyn Cummings Kristen Wight Christopher Clifford.
Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
41 WEST 42 ND STREET, NEW YORK – ARCHITECT: SKIDMORE, OWNINGS & MERRILL LLP, GORDON BUNSHAFT.
LUDWIG MIES VAN DER ROHE
Competency: Draw wall sections and details
Formerly known as “91 Turkish” and part of the abandoned RJ Reynolds Tobacco Co. manufacturing complex, the historic rehabilitation of this property initiated.
Kaumudhi Nalubolu. Perry Building is one of the most historic, identifiable, and architecturally significant buildings in the area. it was designed by.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
© 2010 MAiSPACE, Inc. ALUR Dividing Wall An Attractive, Cost Effective Sidewall for ALUR Glass Walls and MAiSPACE Floor to Ceiling Panels.
1130 Connecticut Ave. Washington, DC * 218,750 SF Bldg *25% Vacancy * Built 1986 * Rent = ~$46/SF * Office Building * Valuation =~$91M.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Hearst Magazine Building, New York,
Cultural Resources office — St. Louis Planning & Urban Design Agency an introduction.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Justice Planners and Designers 212 North 25 th Street, Milwaukee, Wisconsin / Door County Architectural and Engineering.
Harris Theater for Music and Dance Chicago, IL Lindsey K. Beane Lighting/Electrical AE Senior Thesis 2006.
CAPELLA SHANGHAI, JIAN YE LI OPENING SPRING 2017.
WDMA Technical Conference Chicago, IL 28 June 2016
Competency: Draw wall sections and details
Huntington Convention Center of Cleveland &
Advisor: Professor M. Kevin Parfitt
The International Style
Appeal of Technical Denial of Landmark Designation
Application for Landmark Designation S
FLOOR PLANS CHAPTER 7 – PART 1.
Competency: Draw wall sections and details
Building Construction
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
New York City Master Plan Update
1211 Wellington Avenue Application for Landmark Designation
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
1600 San Pasqual Street Application for Landmark Designation
2480 Oswego Street Application for Landmark Designation
Determination of Eligibility 2/20/19
254 East Union Street Pre Development Plan Review
Versatile Group of Company Make your dream home in real world
SALVATION ARMY BUILDING
Presentation transcript:

Modernizing Modernism: Challenges with Preserving Post-War Buildings National Historic Tax Credit Conference Chicago, Illinois September 25, 2008 The Inland Steel Building 30 West Monroe Street, Chicago, Illinois

Completed in 1958 as corporate headquarters for the Inland Steel Company. Designed by Bruce Graham and Walter Netsch of Skidmore, Owings & Merrill. Unique design with external columns and separate service tower allowed completely unobstructed floor plates. Inland Steel Building

Historic and Architectural Significance First modern glass skyscraper constructed in Chicago Loop. First Chicago skyscraper designed by SOM. First fully air-conditioned office building in Chicago. First use of insulated glass units in a Chicago skyscraper. Designated a Chicago Landmark in Listing on the National Register of Historic Places in process.

The Project The Inland Steel Building is being rehabilitated and repositioned as an office building to compete in the 2008 marketplace. Project seeks 20% federal historic rehabilitation tax credits, thereby requiring compliance with Secretary of the Interiors Standards for Rehabilitation. As a Chicago Landmark, changes to exterior and lobby are subject to review and approval by the Commission on Chicago Landmarks. A challenge of rehabilitating the Inland Steel Building for the current market is to preserve significant modern interior features while accommodating the needs of a variety of tenants.

The Challenge: Preserve Modern Interior Entry lobby and first floor retail space. Unique lighting pattern on second floor. Clear span office floors. Modular partition wall system. Significant Interior Features

Entry Lobby and First Floor Retail Space Retain Richard Lippold sculpture Radiant One in lobby. Restore original lighting system. Reveal textured glass and marble features. Restore elevator lobby ceiling.

Entrance lobby with sculpture, looking east towards elevator lobby, circa 1958.

Current condition of ground floor elevator lobby, showing non-original lighting and Bubinga paneling.

Non-original Bubinga paneling in entrance lobby.

Second Floor Lighting Pattern Second floor ceiling originally featured grid of square light boxes that extended through the wall plane to the exterior soffits. Light boxes were removed from interior. Rehabilitation proposes to restore original lighting configuration.

1957 SOM Drawing of Second Floor Lighting Configuration.

Current condition of second floor ceiling, showing non-original interior lighting and original exterior lighting.

Clear Span Office Floors Separate service tower allowed office spaces with no interior obstructions. Remodeling by individual tenants has obscured original open floor plans on most floors. Rehabilitation proposes to remove non-original partitions and reveal clear span office spaces.

View of typical office floor, circa

Examples of later tenant remodeling.

Proposed office interior.

Modular Wall Partition System Interior office spaces defined by modular system of wall partition panels manufactured by E. F. Hauserman Company. Panels designed to snap into Celotex ceiling system for easy office reconfiguration. Rehabilitation proposes to retain Hauserman panels on some floors and introduce new modular system.

Offices with Hauserman panels, circa 1958.

Surviving Hauserman panels.

Hauserman textured glass panels with clear glass transoms.

Proposed new modular partition system.

Summary The Inland Steel Building is one of the defining commercial high-rises of the Post-War era of modern architecture and a beloved Chicago Landmark. A challenge of rehabilitating the Inland Steel Building for the 2008 market is to preserve significant modern interior features while accommodating the needs of a variety of tenants. The project will retain the Richard Lippold sculpture in the lobby, restore the original system of light panels on the first floor, and reveal obscured marble and textured glass features. The distinctive lighting configuration on the second floor will be restored. Inappropriate partition walls will be removed from office floors to reveal original clear span spaces. Hauserman wall panels will be retained on some floors, and a new modular partition system will be installed on remaining office floors.

Allen F. Johnson Director, Midwest Office MacRostie Historic Advisors LLC 53 West Jackson Boulevard, Suite 1357 Chicago, IL (312) ; macrostiehistoric.com