Engineering Health, Safety & Environmental

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Site Safety Plans PFN ME 35B.
Welcome to … The safety of all individuals working, or visiting the … facilities is of great imporatance to us and is our one priority. We would request.
(Company) Induction. Policies These can be found on all notice boards and you must spend the time to read them. Company have the following Policies: Health.
Health & Safety Induction Philip Thornton Safety Officer.
HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
Site Safety Visitors Induction
Don’t Burn the Toast! Breakfast Club Risk Assessment.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Welcome to Jefferson Lab
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
Safety & Security Contractor Induction Property Management.
Click here to go back to the beginning Click here to go back a slide. Click here to go to the next slide. Now move onto the next slide. Welcome to SU training.
HAHP Health & Safety Induction 2014/15
Safe Learner Induction Stage 1 (complete) Harry Wheatcroft Safety Advisor.
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
Welcome to Tulloch’s Site Induction
INDUCTION Welcome to the Victorian Association of Performing Arts Centres (VAPAC) and Darebin Arts & Entertainment Centre’s (DAEC) Emergency Procedure.
Permit to Work Procedure Document Number: KOC.SA.004
© University of Reading Dec 2009 Health and Safety Induction For Excavation Works University of Reading.
School of Engineering & Electronics Safety Presentation.
Welcome to College of Engineering February 2015 Health and Safety Briefing.
Student Briefing College Of Engineering February 2011.
CONTRACTORS/VISITORS HEALTH & SAFETY INDUCTION
Incident Reporting Procedure
Safe Learner Induction Stage 1 (College)
1 1.H.4 Emergency and Evacuation Procedures Training.
Engineering Health, Safety & Environmental
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
Lockheed Martin Missiles and Fire Control
© University of Reading Dec 2009 Health and Safety Induction For Working at Height University of Reading.
Rail Health, Safety & Environmental
Level 2 Award in Employability Skills
Health & Safety at Craighall Campus. This brief introduction provides details of our safety and emergency arrangements at Craighall Campus.
NEC Site Induction: Organiser & Contractor Construction (Design & Management) Regulations CDM.
Health and Safety Policy
Staff Induction Fire and Emergency Nick Giles OHS Manager.
CURTIN PETROLEUM ENGINEERING Welcome Orientation Session ARRC – Australian Resources Research Centre Friday 1 st March pm – 3.00pm Health and.
© University of Reading Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading.
Induction training for new employees
PRIMARY INDUCTION Faculty Safety Managers: Stefan Hoyle & Jan de Abela-Borg.
WORK PLACEMENT ORIENTATION PROGRAM
Site Safety, Health & Environmental Induction. Management Commitment to H&S Operate in accordance with Health & Safety best practice Develop and maintain.
Health, Safety and Environment Induction. What you need to do? Complete the Health, Safety and Environment Induction Report (S010F) (this includes all.
CONSTRUCTION BASICS STAYING SAFE ON SITE By COLDROP.
Safety for Researchers Philip Thornton Safety Officer 12 th November 2015.
School of something FACULTY OF OTHER Health and Safety Safe in the knowledge.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
Work Place Transport. Members of the BPF Health & Safety Committee.
Construction Site Induction A guide to “HOW TO” “HOW TO” by Coldrop.
CDM Site Induction SCS FORMULATE HALL 1, RICOH ARENA 15 – 16 NOVEMBER 2016 CDM SITE INDUCTION.
Fire & Emergency Information
Health and Safety Induction
Site Rules Big Bang Fair South East Wednesday 28th June 2017
Employee rights and responsibilities
Simon Jones Health & Safety Manager Wirral Met College
NSW Construction Induction Green Card
Welcome to ‘project name’
First Aid At Work First aid is defined as the first help given to
WELCOME TEI VISITOR >>Next
Because Technology Never Stops
Because Technology Never Stops
Module 2 Site Induction for Barhale Employees & Sub-Contractors new to the site IMPORTANT To be delivered to all site personnel including existing Barhale.
Cleaner Colleague Induction Tour: Trainer Guide
Induction Tour: Trainer Guide
Site Rules Big Bang Fair South East 2018
Site Rules Big Bang Fair South East 2018
Health and Safety - Richard Quenby
Health, Safety & Environmental Induction
Online Volunteer Work Health & Safety Induction
Presentation transcript:

Engineering Health, Safety & Environmental Visitor Induction “Name of Project” Rev:01

Instructions for the person undertaking the induction. Section 1 is a general introduction to the site and the project Section 2 covers the rules applicable to all visitors Section 3 covers the current site risks and should be communicated through the whiteboard (if applicable). Rev:01

Section 1 General Introduction Rev:01

Amalgamated Construction Welcome to Amalgamated Construction (??????????????) This Health, Safety and Environmental brief is designed to guide Non-working Personnel on the rules, hazards, risks and control measures appropriate to your Visit. The site actives will be highlighted to you during your briefing and you shall be introduced to your “Site Buddy” Rev:01

Be (or nominated by) the Responsible Manager / Person in Charge. SITE BUDDY SYSTEM Your “Site Buddy” will Be (or nominated by) the Responsible Manager / Person in Charge. Consider your Health & Safety during your visit. Escort you to and from your briefing to the work site / area of interest Have knowledge of the safe systems of work operating on the site (i.e emergency details, first aid kits, exclusion zones) Rev:01

PROJECT DETAILS – SCOPE OF WORK (Brief Description of the Works) Rev:01

Insert General Arrangement drawing here if available ! PROJECT DETAILS - SCOPE OF WORK Insert General Arrangement drawing here if available ! Rev:01

PROJECT DETAILS - ACCESS Insert drawing of site access arrangements! Access restrictions Provide details on the approved route to site, any access restrictions, width/height/weight limits, local community issues….etc Rev:01

Title Name PROJECT TEAM Contracts Director Contracts Manager Project Manager Site Manager / Agent Amco Site Supervisor * Rev:01

Facilities WELFARE ARRANGEMENTS Provide a compound layout plan/sketch showing the location of toilets, offices, canteen, etc. Rev:01

EMERGENCY ARRANGEMENTS In the event of hearing the site evacuation alarm make your work area safe, then go immediately to your allocated fire assembly point. The emergency alarm for this site is ….. The muster point is…… (Alternatively insert a sketch showing the muster point) Rev:01

EMERGENCY ARRANGEMENTS Familiarise yourself with the location of the first aid kit and local hospital route details First Aider First Aid Kit Locations Nearest Hospital (See map on SHE Noticeboard) Rev:01

EMERGENCY ARRANGEMENTS Environmental Emergency Arrangements Spills NOTIFY your “Site Buddy” if you spot an spills or leaking plant or equipment Rev:01

AMCO HEALTH & SAFETY INITIATIVES Behavioural Safety If you witness any unsafe acts please report them to your buddy Rev:01 14

AMCO HEALTH & SAFETY INITIATIVES Life Saving Rules Rev:01 15

LIFE SAVING RULES FOR VISITORS VISITOR RULES Lifesaving Rules Rev:01

Access rules for your site visit – VISITOR RULES Access rules for your site visit – You shall be accompanied at all times by your “Site Buddy”. Be aware of your own safety and that of others. Insure you can always communicate with your “Site Buddy” Do not distract the work force during your visit, direct your query to your “Site Buddy” Do not interfere with /or handle any plant Materials or equipment on your Visit. direct your query to your “Site Buddy” Do not take photos without permission Rev:01

(to be worn at all times) Hard hat High Visibility Clothing VISITOR RULES Mandatory PPE (to be worn at all times) Hard hat High Visibility Clothing Eye protection Gloves Safety boots (NOT RIGGERS) Other PPE as required by the Risk Assessment. Rev:01

VISOTR RULES All H&S and Environmental Accidents and Incidents (near misses) must be reported to your “Site Buddy” no matter how minor All accidents and incidents must be recorded. Rev:01

No mobile phones to be used on site unless in a place of safety. VISITOR RULES No mobile phones to be used on site unless in a place of safety. No MP3/Walkmans are allowed to be used on site. Rev:01

VISITOR RULES D&A Testing can be undertaken on any site at any time. If you are taking any medication you must inform your “Site Buddy”. Action will be taken if you: TEST POSITIVE for drugs. POSSESS illegal drugs on site. CONSUME alcohol or illegal drugs on site REFUSE to take a drugs or alcohol test. Rev:01

This is a NO SMOKING site. VISITOR RULES This is a NO SMOKING site. Smoking is only allowed in the following places: Xxxxx xxxxx Rev:01

Section 3 Site Risks Rev:01

SITE HAZARDS – WHITEBOARDS A whiteboard is used on a daily basis to discuss the activities planned for the day and any hazards/risks that need to be considered The key risks for visitors today are: ……….. If whiteboards are not being used delete this slide and use the next slide. If they are being used then the next 2 slides can be deleted Rev:01

SITE HAZARDS A briefing is undertaken daily to discuss the activities planned for the day and any hazards/risks that need to be considered The key risks for visitors today are: see next page Rev:01

VISITOR Hazards/Risks Controls Lorry/Plant movements Keep to the pedestrian walkways Uneven ground Keep an eye on your underfoot conditions Sturdy, supportive footwear Contaminated ground, invasive plants, protected areas Observe signage, Keep out of restricted areas These are suggestions to get you started please add, amend or delete as appropriate Rev:01

Please Sign onto the Induction Briefing Form Thank You ANY QUESTIONS? Please Sign onto the Induction Briefing Form Rev:01