Ltd. ACN 003 026 243 www.infomedia.com.AU Datacentre Design Guy Bryant 25 May 2004 www.infomedia.com.au.

Slides:



Advertisements
Similar presentations
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Advertisements

Ltd. ACN Datacentre Design Guy Bryant 27 July
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Dave Pearson, Director of Innovation IHEEM Conference 27 th October 2009 Using an Ammonia Chiller Plant to Deliver Lower Cooling Costs
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Integrated Building Solutions, Inc. Web Based Facility Integration Tools CFRT Visualization Project.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
InfraStruxure for Small IT Spaces Solution Introduction.
Chapter © 2009 Pearson Education, Inc. Publishing as Prentice Hall.
TAC - Intelligent Infrastructure and Energy Efficiency.
Security Controls – What Works
Citrix Partner Update The Citrix Delivery Centre.
Enterprise Resource Planning (ERP) Systems
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Data Center Design Christopher Geyer. A Data Center Highly secure, fault-resistant facilities housing equipment that connect to telecommunications networks.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Current trends in data centre outsourcing
Irwin/McGraw-Hill Copyright © 2001, The McGraw-Hill Companies, Inc. All rights reserved. I n t r o d u c t i o n t o I n f o r m a t i o n S y s t e m.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
Connectivity Week Santa Clara Convention Center May 23, 2011.
Enterprise Exposure Management What Does This Mean for Internal Controls Kevin R. Rose October 2004 Return to Risk Limited Website at
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Incentive Services Presented by D.E. Baetsen & Associates, LLC.
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
1 November 2008 David Hall Sales Manager – New Business Data Centre Hosting for the M-Business.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
© 2007 Centre for Public Agency Sustainability Reporting Action and Engagement in the Marketplace – the Role of the Public Sector with CSR and Sustainability.
Only for internal use / © Siemens AG All rights reserved. Industry Sector Central worldwide Messages for energy efficiency, for customers, analysts,
Retro-fitting Commercial Buildings A Financing Perspective Date: April 2011 Prepared by: Carbon Solutions Group.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
MARKETS II M&E FRAMEWORK AND CHALLENGES Joseph Obado.
Smartcool Systems Inc. Providing effective and reliable energy efficiency solutions for HVAC-R customers around the globe.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
Virginia Information Technologies Agency Green Technology Initiatives
Global IT Solutions for Multinational Corporations Jim Forbes Vice President Equant IP Solutions Line of Business.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Jon Walton Director of Technology Bay Area Technology Forum November 5, 2009 Technology Consolidation: Fact or Fiction.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #9.
SSA:-COMPANY PROFILE: System Software Associates, Inc. (SSA) is founded in 1981 and has a headquarters in Chicago, USA. It has branches in more than 91.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
CISC 849 : Applications in Fintech Namami Shukla Dept of Computer & Information Sciences University of Delaware A Cloud Computing Methodology Study of.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
VP Quarterly Report on Strategies Q3– February 2, 2016 Robbie Peters, Vice President, Financial Services & Chief Financial Officer Vision: Healthy people,
1© Copyright 2015 EMC Corporation. All rights reserved. FEDERATION ENTERPRISE HYBRID CLOUD OPERATION SERVICES FULL RANGE OF SERVICES TO ASSIST YOUR STAFF.
Rob Boyer Associate, AECOM. Heat Innovation - Changing the way we think about delivering heat Rob Boyer, Associate Director Infrastructure and Sustainability.
Budget Study Sessions -Sound Fiscal Management that Facilitates Meeting the Needs of the Community -A High Performing Workforce that is Committed.
Staying Ahead of the Curve IFM Outsourcing pushes the envelope on energy savings Chris Pesek, Managing Director Integrated Facilities Management, JLL.
Copyright © 2013 OneNeck IT Services Corporation. All Rights Reserved. 1 Cloud Enablement For Microsoft Dynamics Cloud Enablement for Dynamics AX and Use.
MarketsandMarkets Presents MarketsandMarkets Presents Mobile datacenter-Micro Datacenter Market worth $20 Billion by 2018 Mobile datacenter-Micro Datacenter.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Connect Collaborate Innovate End to end video solutions.
Porter’s Competitive Forces
Information Systems Strategy and business alignment
Outsourcing: The Brinker Experience
An Integrated Industrial Policy for the Globalisation Era
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
Sonepar Management – Prophix story
Location Analysis and Planning Chapter 8
Flexibility of Azure Enables Solutions Company to Deliver Customer Insights for Organizations Partner Logo “When the local version of Azure was launched.
Enterprise Architecture at Penn State
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Enterprise Resource Planning (ERP) Systems
Procurement & Contract Management Solution on Azure Helps to Boost Business Performance “Microsoft Azure gives us the cloud infrastructure to quickly and.
Presentation transcript:

Ltd. ACN Datacentre Design Guy Bryant 25 May

Datacentre Design Successfully Implementing Your Datacentre Guy R. Bryant PMP, Director Technology © 2004 Infomedia Ltd, Sydney Australia APC InfraStruXure

Infomedia Ltd Copyright 2004 Background Infomedia is: Australian based, Global provider of Electronic Parts Catalogues to the Automotive Industry Australian provider of computer driven Financial Systems to Dealer Franchises (Dealer Management Systems) Staffed by 250 employees in four capitol cities of Australia International offices in the UK, USA and Mexico

Infomedia Ltd Copyright 2004 The Challenge Business Growth Company Established 1991, Listed on ASX 2000 Producing ~100k DVD/CDs per month for WW dist. Narrabeen Campus staff space outgrown, –Added Two New Sites in 2001 –Added New Datacenter in 2001 –Added New Corp HQ + Datacenter in 2004 Servicing 10,000 seats in ASP financial model $6.5-7m/day in customer revenue Company Staff Growth of % per annum High growth + High availability requirements

Infomedia Ltd Copyright 2004 The Requirements Technology Infrastructure Build and plan/prepare for large growth in IT/ASP services. Ensure High Availability Ensure Security of Data transaction processing ‘Crystal-Ball’ future (2yr) power requirements against technological improvements. Do all this in 6 months beginning 2003 with sensitivity to Capital and on-going Operational costs with adequate capacity to carry 24 months until ‘Final Bunker’ built Plan for Bunker, establish Strategic direction

Infomedia Ltd Copyright 2004 The Process Steps Evaluate Requirements –Centralised Management –Physical and Logical security –7x24 Monitoring of environment and systems –Lowest possible Capital/Operational costs –Ensure ability for Failover and Independent Operations Evaluate Technology Options –Innovative (InfraStruxure ™) –Traditional (Over engineer, Power, UPS, HVAC, Space)

Infomedia Ltd Copyright 2004 Traditional Approach Steps: Bricks and Mortar Space built with 5+ year view HVAC Installed for entire space volume –General space must be cooler to ensure racking is kept within specified environmental limits (temperature and humidity) –Redundancy imperative Power engineered for 3+ year view UPS + Redundancy engineered for 3+ year view –Typically supplied throughout Datacentre –All servers/services treated equally Environmental Monitoring established –Typically monitors entire environment as a whole Fire Detection and Suppression engineered for whole space Physical Security established

Infomedia Ltd Copyright 2004 Steps: Bricks and Mortar Space built with 5+ year view HVAC Installed for current rack space volume only - Normal/ergonomic environmentals for people space while computer environmentals in computer space - Redundancy as required Power engineered for 3+ year view UPS + Redundancy engineered for Current year - Typically supplied as business dictates - Ability to address specific rack/server/service requirements Environmental Monitoring established Granularity to specific locations in Racks (H,M,L) Fire Detection and Suppression engineered for whole space Physical Security established InfraStruxure ™ Approach

Infomedia Ltd Copyright 2004 InfraStruxure ™ Key Advantages Significant reduction in Cost-of-Ownership (CoS) Reduction in initial capital expenditures, UPS/HVAC (Spend/build as the business requirements dictate/justify) Significant reduction in operational costs (Electric) - Cooling < 60% less space to condition for computer environmentals - UPS power and redundancy delivered to mission critical systems. ‘Green’, reduces.92kg CO2 per Kwh of energy savings Business/Technology driven granular monitoring Power outlets remote controlled (Remote power cycling) Integrated Web Mgt SNMP environmental monitoring/notification Staff friendly…Staff environment at ‘normal’, no sparkie!

Infomedia Ltd Copyright 2004 Benefits Enterprise Benefits: Cost Reduction Potential for reduction in Product costs Low risk with Integrated N, N+1, 2N failover Common Skills Staff Datacentre environment ‘normalised’ Modular Growth Granular environmental monitoring Remote Power cycling Power Load balancing/metering at the PDU level

Infomedia Ltd Copyright 2004 Future Actions Key Activities: Establish ‘new’ baseline Work with APC to plan and configure new Infomedia ‘Bunker’ based on ‘new’ baseline Validate savings estimates Build it