- Where are the entry points of the instrument - Physical External links - Overview of the External Interfaces - Status - Conclusion EUSO-BALLOON DESIGN.

Slides:



Advertisements
Similar presentations
MICROPROCESSORS AND MICROCONTROLLERS
Advertisements

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
1 Embedded Stroke Evaluation System Amanda Sweeney, 4ECE Supervisor: Martin Glavin.
EE 296 Sophomore Project Group Members: JimyLeah Castro Jeremy Chan Eric Lee Sae Yoon.
S.W.A.T (Security Watching All the Time) Jeff Shin Tyler Stubbs Paul Kasemir Pavel Mayyak.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
PDS secondo le IEC n.
HK & LVPS for EUSO –TA / -Balloon G. Medina-Tanco, L. Santiago, H. Silva Lopez, F. Trillaud, C. Lopez, J. Rojas, A. De la Cruz, S. Guerrero, G. Leon.
- Purpose - Main sequences - Resources (manpower and GSE), including location -Main activities of the assembly and integration of the subsystems -Final.
PCB Layout Design. PCB Layout Special Layout Considerations 4 in.
- Grounding - Harness Shielding - PDM Electrical Architecture - DP Electrical Architecture EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Pierre.
EUSO-BALLOON CDR – Agenda (I). Internal interfaces overview Batteries and Low Voltage power Supplies PDM interfaces DP interfaces HK Interfaces List of.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
SCADA and Telemetry Presented By:.
- Battery Pack Technical Specifications - Battery Pack Design Descriptions - Battery Pack Connection Diagram - Battery Pack Architecture EUSO-BALLOON DESIGN.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Data processor description, development plan and risk analysis Giuseppe Osteria INFN Napoli Toulouse, February 2, 2012 Euso Balloon Phase A Review Giuseppe.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Recommendation and actions EUSO EUSO-BALLOON FLIGHT REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Wrap up previous actions.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
MICRO CONTROLLER MODULE 1. Learning Objectives Name some gadgets that use microcontrollers. Define a microcontroller. Differentiate between a computer.
SGI Confidential Power Bay. SGI Confidential Power Bay Front View AC OK LED DC OK LED Alarm LED Release Latch Power Bay 1 Power Bay 0 Power.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
The whole instrument Tests performed Conclusions EUSO-BALLOON, EUSO-BALLOON flight review 04/06/2014 P. Barrillon on behalf of the many hard workers involved.
The EC-UNIT P. Barrillon on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
SXC Software interfaces1 SXC: SW interfaces Ground segment SpacecraftDetectorTelescope TelecommandsTelemetry Cmd & hk parameters- conversion SpacecraftTelecommandsTelemetryProtocolBandwidthcoverage.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Smart Shopping Cart The shopping cart of the future Nicole Berkovich and Ian O’Leary.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Architectural Approaches (Part 1) Power Aware Distributed Systems Kickoff August 23, 2000.
HOUSEKEEPING HK at Balloon-EUSO 10 th JEM-EUSO meeting from December 5 th to 10 th at RIKEN, Tokyo By G. Medina-Tanco*, A. Zamora, L. Santiago Cruz**,
EC_ASIC drawing (1) ASIC BASIC FASIC D 68 pi ns ASIC A 68 pi ns ASIC C ASIC E 120 pins ABCDEF 68 pi ns 68 pi ns 68 pi ns 68 pi ns.
OPERA GENERAL MEETING Gran Sasso, May 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien,
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
HK-status. RS422 (diff) RS232 SPI Trigger rate Analog(V,T) >=4 Analog(V,T)
- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino 1.
Team 2 Electricivic Ben Dannan Mark Snyder Matt Klutzke Mike Mitchell 1.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Anomalies &/or differences with the configuration Explanations, analyzes, impacts Updates EUSO-BALLOON, Flight review 04/06/2014 Guillaume Prévôt (APC)
Power Management System Hardware Milestone: 0 Software Milestone: 0 Requirements: Interface with the existing bicycle battery voltage (35-40V typical)
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
MICROCONTROLLER INTERFACING WITH STEPPER MOTOR MADE BY: Pruthvirajsinh Jadeja ( ) COLLEGE:DIET BRANCH:EC.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
Data Processor Status Hardware Giuseppe Osteria INFN Napoli Paris, October 12, 2012 Euso Balloon 8th progress meeting Giuseppe Osteria INFN Sezione di.
Michel DUPIEUX IRAP Progress Meeting LAL 02/03/ EC interface with PDM.
HVPS Configurations JEM EUSO Balloon Pierre Prat 17/09/2012.
Data processor Status Giuseppe Osteria INFN Napoli Paris, March 2, 2012 Euso Balloon 4th progress meeting Giuseppe Osteria INFN Sezione di Napoli.
Pierre PRAT Progress the Michel DUPIEUX.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,
The EC-front development plan and planning S. Ahmad, P. Barrillon, D. Cuisy, S. Dagoret, P. Dinaucourt, R. Sliwa, JL. Socha EC design review – LAL – 1.
Status of the DSP/ASPOC EM
Introduction to Microcontrollers and the Board of Education
Integrating CCSDS Electronic Data Sheets into Flight Software
Digital Sub-System Bob Goeke.
EVLA MONITOR & CONTROL CDR
Year 9 Entry Level Computing
Command and Data Handling
Presentation transcript:

- Where are the entry points of the instrument - Physical External links - Overview of the External Interfaces - Status - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Sylvie Dagoret-Campagne LAL, Orsay EUSO-BALLOON External Interfaces

CDR – External Interfaces 2 Where are the entry points inside the instrument IR-CAM IRCAM EC-HV EC-DYNODE HVPS2 HVPS1 MAPMT EC-ANODE EC-ASIC PDM-B Batteries PWP LVPS-DP1 LVPS-DP2 LVPS-PDM LVPS-HK HK CCB CLKB GPSR CPU DST SIREN CNES Telemetry EXT Bat Controller TLS Sensors Motors SPACEWIRE /PCI EC-Front EC-Back DPPDM data Power 28 V Telemetry Power 5 V HVPS control&status monitoring

CDR – External Interfaces3 External Physical links RS232/R S422 conv Ethernet ON/OFF +/- 12 V ON/OFF 3 V HK CPU LVPS HK TCTM wifiGPS

Overview of the external interfaces A- SIREN-LVPS-HK - Purpose is to initiate a turn ON/OFF initial procedure for the instrument - Technically : two open drain links (SIREN-TOR) over the ± 12 V and 3.3 V converters of LVPS-HK B-SIREN-HK - High level commands implying the instrument life (turn ON/OFF of various components by the action on their supply voltage through HK) - Standard Telecommand (TC) for the instrument control, -Standard Telemetry monitoring (TM) on the power supplies (Voltage), Temperature of the components, -Technically : RS232/RS422 interface C-SIREN-CPU -Retrieve information on runs and events like the trigger rate, -Retrieve information from selected events according criteria adapted to the allowed transmission rate, -Issue CPU commands. -Technically Ethernet RJ45 CDR – Instrument and Objectives4

Overview of the external interfaces A- SIREN-LVPS-HK - Purpose is to initiate a turn ON/OFF initial procedure for the instrument - Technically : two open drain links (SIREN-TOR) over the ±12 V and 3.3 V converters of LVPS-HK B-SIREN-HK - High level commands implying the instrument life (turn ON/OFF of various components by the action on their supply voltage through HK) - Standard Telecommand (TC) for the instrument control, -Standard Telemetry monitoring (TM) on the power supplies (Voltage), Temperature of the components, -Technically : RS232/RS422 interface C-SIREN-CPU -Retrieve information on runs and events like the trigger rate, -Retrieve information from selected events according criteria adapted to the allowed transmission rate, -Issue CPU commands. -Technically Ethernet RJ45 CDR – Instrument and Objectives5

Overview of the external interfaces A- SIREN-LVPS-HK - Purpose is to initiate a turn ON/OFF initial procedure for the instrument - Technically : two open drain links (SIREN-TOR) over the ±12 V and 3.3 V converters of LVPS-HK B-SIREN-HK - High level commands implying the instrument life (turn ON/OFF of various components by the action on their supply voltage through HK) - Standard Telecommand (TC) for the instrument control, -Standard Telemetry monitoring (TM) on the power supplies (Voltage), Temperature of the components, -Technically : RS232/RS422 interface C-SIREN-CPU -Retrieve information on runs and events like the trigger rate, -Retrieve information from selected events according criteria adapted to the allowed transmission rate, -Issue CPU commands. -Technically Ethernet RJ45 CDR – External Interfaces6

Status of External Interfaces interfaceConnectorsPin assignement cableprotocolStatus SIREN-CPURJ45OK EthernetOK SIREN- LVPS-HK D-Sub 15 FOK Electrical (open drain) OK SIREN-HKOK RS232/RS4 22 OK CDR – External Interfaces7 CPU HK Microcontroller

CDR – External Interfaces8 Conclusions Component links done according state of the art EMC rules Refer to the Electrical Architecture document and Pierre Prat’s presentation, All connectors and pin assignment done for each component, Refer to the Electrical Interface Document and to Michel Dupieux’s presentation Cables procurement attributed, Refer to the subsystem manager’s presentations Functions and purposes defined, Refer to the software documents for numeric interfaces and Francesco Cafagna’s presentation No remaining Open point

CDR – External Interfaces9 END ON EXTERNAL INTERFACES DP box modules CPU HK LVPS HK CLK GPS LVPS1LVPS PDM RS232/R S422 conv Ethernet ON/OFF +/- 12 V ON/OFF 3 V CCB