Frankfurt (Germany), 6-9 June 2011  Speaker Jean LAVALLÉE  Authors Janislaw TARNOWSKI, Jacques CÔTÉ, André GAUDREAU, Pierre GINGRAS, Mircea IORDANESCU.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Electrical Cable Aging: What does IAEA Recommend? Module 2 Dr. John H. Bickel Evergreen Safety & Reliability Technologies, LLC.
UNDERGROUND CABLES.
PILC Replacement Page 1 April 2003 ICC PILC Replacement: Getting the Lead Out Spring ICC Cincinnati, OH April 30, 2003 ?
Inspection & Preventive maintenance of breakers
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
VSE Corporation Proprietary Information
© Copyright year ABB. All rights reserved /1/2015 VBF OUTDOOR VACUUM CIRCUIT BREAKER 36kV PRODUCT INFORMATION.
CONDOMS A series of presentations developed by TGPSH/GTZ and PSI-TANZANIA.
CHREID 2008 ELECTRICAL SAFETY Introduction and Overview of Safety Clayton H. Reid September, 2010.
Optimizing valve maintenance using condition analysis IPPTA seminar 17-18th July, 2014.
Smart Sensor Technology for Gas Pipeline Monitoring
TransCanada Corporation (TSX/NYSE: TRP)
Overview of Key Rule Features
CompTest 2011 Monitoring key parameters during the elaboration of composite parts by resin transfer moulding process (RTM) Presented by Marc WARIS 15/02/2011,
VHA PANEL WITH HPA12 CIRCUIT BREAKER
CHAPTER 9 Electrical Design of Overhead Lines
Frankfurt (Germany), 6-9 June 2011 SINGH– US – Session 1 – 0952 Dry-type Transformer for Pole Mounted Application.
1111Challenges for reliable offshore transformersTRANSFORMING YOUR NEEDS INTO SOLUTIONS Challenges for Reliable Offshore Transformers Dr. Jan.
DET 310 UNDERGROUND CABLES
Job Hazard Analysis (JHA). Page  2 Job Hazard Analysis (JHA)  What is it?  Why do I have to do it?
DayCor ® Technology Distribution. DayCor® Technology is used to detect Corona Particle Discharge and Arcing on electric grid components. It offers you:
© Fluke NetworksVisiFault L&L June 2004 VisiFault Visual Fault Locator (VFL) New tool traces fiber, verifies continuity and polarity, helps find breaks.
CEMTREX, INC. MODCON SYSTEMS LTD NIR Systems July 2010.
ELECTRICAL INSTALLATION PLANNING
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Electrical Installation 2
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
An Autonomous Inexpensive Robust CO 2 Analyzer (AIRCOA) Britton Stephens, Andrew Watt, and Gordon Maclean National Center for Atmospheric Research, Boulder,
Levels of high voltage: World over the levels are classified as: LOW MEDIUM HIGH EXTRA and ULTRA HIGH Voltages However, the exact magnitude of these levels.
32 nd National Energy & Environmental Conference September 19, 2005 Benchmarking the Engineering & Construction Industry.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Frankfurt (Germany), 6-9 June 2011 Hans-Erik Olovsson – Sweden – Session 1 Network Components – Paper 0453 Innovative Compact 145/12 kV Indoor Air Insulated.
Frankfurt (Germany), 6-9 June 2011 Luciano Martini – IT – RIF S1 – Paper 0339 Development and Testing of Innovative Fault Current Limiters for Distribution.
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
“PCA” – Polyclean Applicator the patented application system
TRENTON Casing Filler Presentation
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
© Siemens AG 2012 / All rights reserved. 5SM6 AFD Units – Advanced Preventative Fire Protection Comprehensive protection against fires caused by electricity.
Chapter 10 Verification and Validation of Simulation Models
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
PowerIT Air Insulated Cubicle Uniswitch
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
Fault Tolerance Benchmarking. 2 Owerview What is Benchmarking? What is Dependability? What is Dependability Benchmarking? What is the relation between.
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
老師:戴 子 堯 學生:陳 立 偉 日期: Outline INTRODUCTION THE DRY EDM PROCESS EXPERIMENTAL SETUP CONCLUSIONS 2.
Chemical Sterilization
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
Advantages of Concrete & Core Drilling  Use core drilling procedure for improve accuracy and minimal labor cost.  Fast and therefore decrease labour.
Chapter 1: The Nature of Analytical Chemistry
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Research on Single-phase Ground Fault Locating for Non-effectively Grounded System in Shanghai Weibin Wang Shanghai Municipal Electric Power Company, China.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Generator Condition Assessment through EMI Diagnostics Doble Power Services.
Construction of Mica Capacitor And Its Application
Instrument Maintenance
Chapter 10 Verification and Validation of Simulation Models
Do’s and Don'ts of SF6Gas Handling
Introducing the new 250 A connectors
Principles of Natural Gas
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
The Improvement of ALARA for the Steam Generator Maintenance
Chapter 11 Principle of power system by V K Mehta
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Under Ground Cables By Dr. P. Bala Chennaiah, Associate Professor,
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011  Speaker Jean LAVALLÉE  Authors Janislaw TARNOWSKI, Jacques CÔTÉ, André GAUDREAU, Pierre GINGRAS, Mircea IORDANESCU Hydro-Québec Lavallée – Canada – Session 3 – Paper 0373 Verification of LV Underground Cable Insulation by Air Injection

Frankfurt (Germany), 6-9 June 2011  Problem assessment Risk of arc faults on low-voltage (LV) underground cables, which can lead to explosions An insulation break in LV cables is the main reason for this phenomenon on Hydro-Quebec’s system  Examples of explosions Lavallée – Canada – Session 3 – Paper 0373

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper 0373  Existing solutions: There is no solution that is simple and easy to apply in terms of electrical protection to prevent LV arc faults; There is no applicable « test » to verify the insulation when the cable is placed in service: electrical withstand tests will not detect an insulation break when the local area is dry; Different « prevention » solutions : vented covers, tethered covers, sealing of conduits, use of ruggedized cables.  New idea: Through the injection of compressed air into the cable core, check the mechanical integrity of the insulation in low-voltage cables

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper  Principle of the method « VIC» insulation fault detector Universal air tight end connector  Instrument loop

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper  Laboratory tests – type of validation  Capacity of the method to identify small breaks in the insulation, in a reliable and repetitive manner  Effects of air and cable temperatures ( - 20 to + 40 deg C)  Effects of injected air humidity, especially into a frozen cable  Deformation of the insulation layer under the injected air pressure  Laboratory tests – calibrated faults *Cables used at 750 V or less, with extruded insulation up to 1 kV, and an compact, compressed or normal conductor. LV cables * (3/0, 750 kcmil) Fault No fault Peak0.5 mm hole 1 mm hole 1.5 mm hole 2 mm hole 6-12 mm cut Total - type of fault Total - tests269

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper 0373  Diagnostic criterion  Diagnostic duration

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper 0373  Performance results Fault detection capacity: hole 1.0 mm and less on cables up to 200 m in length Duration of diagnosis: from one to a few minutes; mainly depends on cable size and length Environmental factors: method virtually unaffected by the temperature and by the humidity level of the injected air Dielectric properties of the insulation: not affected by the pressure of the injected air (~75 psi =~517 kPa) Automation:  entirely automated tests, with only one displayed result: airtight or leak.  no data to input (ex. cable size or length).  test duration optimized for each individual cable

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper 0373  LV Cable Field Testing at Hydro-Quebec  Objectives To validate the performance of a new technique in real conditions To collect and analyze data on LV cable defects during installation  Instrument installation

Frankfurt (Germany), 6-9 June 2011 Lavallée – Canada – Session 3 – Paper 0373  Summary of field tests  Example of detected insulation puncture Number of cables tested Average duration (including preparation) Number of « leak » detected Remarks 4520 min4 (~9%) 3 leaks on new cables 1 leak on existing cable after civil works (connectors removed)

Frankfurt (Germany), 6-9 June 2011  Main conclusions of field tests The new instrument easily detect LV cable insulation defects through the insulation Electrical tests (continuous current withstand test) of the same cable did not reveal the defect To our knowledge, the new instrument is only technique available to verify the insulation of LV cable in a dry duct after installation There are more defects than faults… but we didn’t knew about the number before we tested with the new technique Lavallée – Canada – Session 3 – Paper 0373

Frankfurt (Germany), 6-9 June 2011  Future development Industrial instrument is under development for implementation on Hydro-Quebec’s underground distribution system The new instrument will be use as a « Quality Assurance » tool for newly installed low-voltage cables The main value of this technology for Hydro-Québec is:  Economical : Less faults, no need for a ruggedized cable  Strategical : Thought the explosions caused by arcing fault are not frequent, the consequences can be important in terms of installation and public safety Hydro-Quebec and DOW Chemical Company are associated to investigate the potential of this method for use in utilities and industries Lavallée – Canada – Session 3 – Paper 0373

Frankfurt (Germany), 6-9 June 2011