Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16.

Slides:



Advertisements
Similar presentations
How Electronic Security Solutions can Help the Government in Securing its Assets and Reduce Energy expenditure Presented By- Nimish Vishnoi Manager-Product.
Advertisements

GLOBAL CITY BUSINESS PARK The Project The first phase of the Class A office park comprises of m m2 built area and m m2 of net area spread.
Basic information – Louvre (completed 07/2008). Location Kutvirtova 339/5 Prague 150 meters from tram stop Laurová, trams 4,6,7 150 meters from metro.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Manchester Central Site Induction Aims of this induction: Identifing key information and instruction necessary to work safely at Manchester Central,
BRE Energy Efficient Office of the Future
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
SITE 1 SITE 2 Site 3 Site 4 SITE 5 Selection of Site -fairly level with good quality of soil. - connected by roads -good communication facilities.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
Prague Gate (Completed 2002) Mix use development –office building, hotel and restaurant
Fire Detection Presentation
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Intro Building automation describes the advanced functionality provided by the control system of a building. A building automation system (BAS) is an.
1 ISE Differences between office and factory layout Product  Offices process information  Factories produce things Physical environment  Offices.
Ice Arena Brīvības gatve 333, Riga, Latvia. Ir īpašumi visā Latvijā! Brīvības gatve 333, Riga, Latvia Ice Arena Ir īpašumi visā Latvijā! Description of.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Health & Safety at Craighall Campus. This brief introduction provides details of our safety and emergency arrangements at Craighall Campus.
Presented By SLAC and Hensel Phelps Welcome SUSB.
ICT and Environmental Monitoring Mr Conti ICT in Society.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
Fax: (01253) Tel: (01253) The Former Boococks Premises Coleridge Road off Talbot Road Blackpool.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
NUMBER OF FLOORS: means the number of floors that are counted from the vertical section of a building at a point where the building has the most floors.
Fax: (01253) Tel: (01253) TO LET First Floor Offices 22 PLYMOUTH ROAD BLACKPOOL LANCS FY3.
Lesson 4 Physical Security - Motion Sensor - Passive Ultrasonic Sensor - Photoelectric System - Ultrasonic - Ultrasonic Motion Sensor - Vibration Sensor.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
“People feel better in Colt conditions” | feel better in Colt conditions” | Colt International Ltd Smoke control.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
Southeast Financial Center
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Building Lighting Controls
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
The Ultimate Venue in the Prestigious Location Strategically situated in the heart of downtown city center. Located on the 5 th floor of Siam Paragon.
P R I M E L O C A T I O N n S E C U R E n F L E X I B L E 9 WAREHOUSES AVAILABLE FOR SALE OR TO LET IN MAHOGONY RIDGE - WESTMEAD 9 WAREHOUSES AVAILABLE.
The Intelligent Office Complex. The twenty-first century is the era of smarter people, smarter planet. To keep pace with the ever changing working style.
Energy Solutions for Business Owners Presented by: [Put your name here] Welcome to... Your Logo Here.
ECO TOWERS Energy efficient office spaces next to Delhi in NOIDA
BOMBA BRIEFING QUESTIONAIRE FOR 30 AUGUST 2017
Southeast Financial Center
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
Building Floor Plan 2, 3, 5, 6 and 9
FIRE PROTECTION & SECURITY in ELI Beamlines
Generic Site Preparation
OFFICES – TSARIGRADSKO SHOSSE 99
OFFICES AND APARTMENTS – Sheinovo 7
Prague Gate (Completed 2002) Mix use development –office building, hotel and restaurant
NICET Fire Alarm Tech Level 1 Practice Test # 6
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
How Remodeling Your Home or Business Can Cause False Alarms
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
ISA Prime Developments
New York City Master Plan Update
The Pavilion 261 Old York Rd, Jenkintown, PA 19046
Data Centre Environment
IT Wiring 综合布线.
Congresses - Exhibitions - Events
Prasanna Narangoda MSc, Bsc (Eng) Hons, C Eng MIESL, MASHRAE, APGBCSL, MLABSE 1 Delivered to UNIVOTEK 22 nd June 2019.
LIFT,ESCALATOR AND MOVING WALKS
Sacramento environmental commission
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Sacramento environmental commission
Presentation transcript:

Kempen & Co 0 Immofinanz: Na Prikope 14 & Jindřišská 16

Kempen & Co 1 STANDING INVESTMENT IMMOFINANZ Retail & Office Na Příkopě 14 UsageRetail & Office Address Na Prikope 14, Prague, Czech Republic RefurbishmentApril 2014 Number of floors 8 upper levels 5 lower levels Lettable space total~ 17,000 sqm Occupancy rate in %ongoing letting process Number of parking spaces145 Main tenantWhite & Case Access & transport Prime city centre location with excellent access by car and public transport (2 metro stations nearby) SustainabilityLEED Gold Certification Data as of 31 July 2014

Kempen & Co 2 Jindřišská 16 UsageOffice Address Jindřišská 16, Prague, Czech Republic ReconstructionSpring 2014 Number of floors7 Lettable space6,621 sqm Occupancy rate in %ongoing letting process Number of parking spaces24 Main tenantsDeliberti SustainabilityLEED Gold Certification Data as of 31 July 2014

Kempen & Co 3 ►Jindřišska 16 offers 6,000 m2 of A- class office space and consists of two connecting building. The historical part, located on the street side and the new part at the rear both enclose an elegant atrium. ►The historical part extends over six floors; the new part includes one additional floor. Floors are connected by stylish lifts but tenants may also make use of two representative historical staircases. The size of individual office units start at 190 m2. Single floor layouts provide an office space of up to 1,000 m2. ►All floors offer both cellular and intelligent open- plan layouts with fully equipped kitchenettes. The inter- connectivity of the floors allows offices to be arranged vertically or horizontally according to the individual needs of tenants. The building can accommodate several small to medium- sized companies with a maximum of three tenants per floor. ►The offices in the historical part follow the original structure of the building, but the partition walls can be wholly or partially removed, resulting in highly flexible and desirable offices. Further details: ►Approx. 3 m ceiling height in all offices ►Raised floors including floor boxes for electrical installations ►Suspended ceilings ►Ventilation and air- conditioning of all areas with humidity and CO2 control ►Possibility of individual climate control and CO2 detection in each office ►Openable windows equipped with contact sensors allowing for central monitoring ►Light sensors allowing for daylight control, central monitoring and switch- off ►Smoke detectors throughout the premises ►Electronic fire alarms ►Enhanced safety via CCTV monitoring of entrances, lobbies and other public areas ►Card- controlled access, central reception and 24/7 security service ►Green wall with living plants delivering fresh oxygen and natural humidity ►Stucco ceiling in the old part Jindřišská 16